Engineer Civil Engineering key terms
Engineer Civil Engineering · Get comfortable with the vocabulary.
- Slump Test
- Related: Water-Cement Ratio, Curing
A field test that fills a standard cone with fresh concrete, removes the cone, and measures how far the sample settles, indicating workability and consistency of the mix.
- Water-Cement Ratio
- Related: Slump Test, Curing
The mass of water divided by the mass of cement in a concrete mix; a low ratio raises strength and durability while reducing workability.
- Curing
- Related: Water-Cement Ratio, Slump Test
Maintaining adequate moisture and temperature in placed concrete so cement hydration continues, developing design strength and reducing shrinkage cracking.
- Critical Path
- Related: Float, Earned Value
The longest chain of dependent activities through a project schedule; any delay on it postpones project completion, so it receives priority in schedule control.
- Float
- Related: Critical Path
The amount of time an activity can slip without delaying the project finish (total float) or its successor (free float).
- Earned Value
- Related: Critical Path, Change Order
A project control measure comparing budgeted value of work performed against actual cost and planned value to forecast cost and schedule performance.
- Change Order
- Related: Earned Value
A written, formally approved modification to contract scope, price, or schedule issued after the original agreement, requiring documentation and often cost justification.
- Atterberg Limits
- Related: Plasticity Index, Liquefaction
Water content thresholds defining the liquid, plastic, and shrinkage states of fine-grained soil; they indicate plasticity and are used to classify clays and silts.
- Plasticity Index
- Related: Atterberg Limits
The difference between liquid limit and plastic limit water contents; a larger value means the soil remains plastic across a wider moisture range and is more compressible.
- Standard Penetration Test
- Related: Liquefaction, Bearing Capacity
A borehole test driving a split spoon sampler with a hammer and counting blows per depth increment, giving a resistance index used for soil strength correlations.
- Bearing Capacity
- Related: Standard Penetration Test, Liquefaction
The maximum pressure a foundation soil can support without shear failure or excessive settlement; it governs footing size and allowable design load.
- Liquefaction
- Related: Standard Penetration Test, Effective Stress
Loss of soil shear strength when saturated loose sand is shaken and pore pressure rises until effective stress approaches zero, causing ground failure during earthquakes.
- Effective Stress
- Related: Liquefaction, Consolidation
Total stress minus pore water pressure; it controls soil strength and compression because only intergranular contact stress resists deformation.
- Consolidation
- Related: Effective Stress, Bearing Capacity
Gradual volume decrease of saturated clay as water drains from pores under sustained load, producing time-dependent settlement of structures.
- Ultimate Strength
- Related: Load Factor, Ductility
The maximum load a structural member or material can carry before rupture or collapse, used as the basis for nominal resistance in design.
- Load Factor
- Related: Ultimate Strength, Limit State Design
A multiplier applied to nominal loads in strength design to account for uncertainty and overload, paired with resistance factors to keep demand below capacity.
- Limit State Design
- Related: Load Factor, Ultimate Strength
A design philosophy verifying that a structure satisfies both strength (safety against collapse) and serviceability (deflection, cracking) requirements under factored and unfactored loads.
- Ductility
- Related: Ultimate Strength, Moment Frame
The ability of a member or material to undergo large inelastic deformation before failure, giving warning and redistributing forces in seismic and overloaded conditions.
- Moment Frame
- Related: Ductility, Shear Wall
A structural system whose beams and columns are rigidly connected so joints transfer bending, providing lateral stiffness and drift resistance without diagonal bracing.
- Shear Wall
- Related: Moment Frame, Ductility
A vertical reinforced concrete or masonry wall designed to resist in-plane lateral forces, adding stiffness and strength to a building's lateral load system.
- Prestressed Concrete
- Related: Ultimate Strength
Concrete in which steel tendons are tensioned before or after casting to compress the section, controlling cracking and allowing longer spans.
- Flexible Pavement
- Related: Pavement Thickness Design, Subgrade
A road structure of layered asphalt and granular base over subgrade that distributes wheel loads through progressively weaker layers and deforms elastically.
- Pavement Thickness Design
- Related: Flexible Pavement, Subgrade
Selecting layer thicknesses so traffic loads do not exceed allowable stresses or strains, often using equivalent single axle loads and serviceability loss criteria.
- Subgrade
- Related: Flexible Pavement, Pavement Thickness Design
The compacted natural soil beneath a pavement structure; its strength, measured by resilient modulus or CBR, strongly influences required pavement thickness.
- Superelevation
- Related: Sight Distance, Vertical Curve
The transverse slope built into a horizontal curve, raising the outer edge so vehicle weight helps resist centrifugal force and improve curve safety.
- Sight Distance
- Related: Superelevation, Vertical Curve
The length of roadway a driver can see ahead; stopping sight distance must exceed the distance needed to perceive, react, and brake before an obstacle.
- Vertical Curve
- Related: Sight Distance, Superelevation
A parabolic transition between two roadway grades that provides gradual change in slope and adequate sight distance over crests and valleys.
- Rational Method
- Related: Time of Concentration, Detention Basin
An empirical formula estimating peak runoff as the product of runoff coefficient, rainfall intensity, and drainage area, used for small urban catchments.
- Time of Concentration
- Related: Rational Method
The travel time for water to flow from the most remote point of a catchment to its outlet, used to select rainfall intensity in peak flow estimates.
- Detention Basin
- Related: Rational Method, Time of Concentration
A storage facility that temporarily holds stormwater and releases it slowly, reducing peak downstream flows and limiting flooding and erosion.
- Biochemical Oxygen Demand
- Related: Activated Sludge, Hydraulic Retention Time
The oxygen consumed by microorganisms decomposing organic matter in water, commonly measured over five days, indicating organic pollution and treatment performance.
- Activated Sludge
- Related: Biochemical Oxygen Demand, Hydraulic Retention Time
A wastewater treatment process where aerated biomass consumes organic matter, followed by settling and return of sludge to maintain the microbial population.
- Hydraulic Retention Time
- Related: Activated Sludge, Biochemical Oxygen Demand
The average period water remains in a treatment tank, equal to tank volume divided by flow rate; it sets contact time for settling and biological reactions.
- Design-Bid-Build
- Related: Change Order, Critical Path
A project delivery method where the owner contracts separately for design, then awards construction to the low bidder, with clear roles but limited builder input in design.