Industrial Engineer Office Automation study plan
Industrial Engineer Office Automation · Give each week a clear focus.
8 weeks · About 6 hours per week
Office Automation Systems and Productivity Software
Map the productivity-suite feature set (word processing, spreadsheets, presentations, email/collaboration) against a checklist of exam-relevant capabilities, marking each as known, shaky, or unknown.
Build a spreadsheet workbook that demonstrates lookup functions, pivot summaries, conditional formatting, and data validation on a 200-row sample dataset.
Write a one-page comparison of document templates, styles, and mail-merge workflows, noting where automation replaces manual steps.
Configure a personal macro or script that automates one repetitive office task end to end and record the before/after time.
Your checkpoint
A personal Office Automation capability matrix (features x confidence level) plus the working macro-enabled workbook with a short README of what each automation does.
Office Automation Systems and Productivity Software & Information Systems, Databases, and Data Management
Draft a document-template and version-control standard for a fictional office, covering naming conventions, metadata fields, and review cycles.
Model a normalized relational schema (at least five tables, primary/foreign keys, one many-to-many resolved) for an office records system.
Write and run core SQL statements against your schema: SELECT with joins, GROUP BY aggregates, and a subquery filter.
Explain the difference between normalization and denormalization and state one reporting scenario favoring each.
Your checkpoint
An entity-relationship diagram plus a script file of at least 10 working SQL queries with commented expected outputs.
Information Systems, Databases, and Data Management & Workflow Analysis, Process Modeling, and Business Process Improvement
Compare flat-file, relational, and document-oriented data stores on integrity, query flexibility, and scaling, and select one for a stated office use case with justification.
Produce an as-is process map (swimlane) for an approval workflow of at least eight steps, identifying handoffs and queues.
Apply a waste analysis to that map and label each non-value-adding step as delay, rework, over-processing, or transport.
Draft a to-be process that removes at least 30 percent of steps and state the assumed cycle-time reduction.
Your checkpoint
An as-is and to-be swimlane pair for one approval workflow, with a waste-tagging table and quantified step-count and cycle-time comparison.
Workflow Analysis, Process Modeling, and Business Process Improvement & Industrial Engineering Methods: Work Measurement, Methods Study, and Ergonomics
Build a process model using BPMN conventions (start/end events, gateways, parallel split) for the to-be workflow and verify every path terminates correctly.
Define cycle time, throughput, and Little's Law for the workflow and compute expected work-in-process at a stated arrival rate.
Conduct a time study: define the observed element breakdown, compute mean observed time, apply a performance rating and allowance factor, and derive standard time.
Perform a methods-study analysis of one workstation using a questioning technique (why/what/where/when/who/how) and propose two ergonomic or layout improvements.
Your checkpoint
A time-study worksheet with element times, rating, allowances, and final standard time, plus a BPMN diagram of the same process.
Industrial Engineering Methods: Work Measurement, Methods Study, and Ergonomics & Networks, Hardware, and IT Infrastructure for Office Environments
Apply work-sampling principles: size a sample for a desired confidence and precision, and interpret a completed observation summary.
Evaluate ergonomic risk factors (repetition, posture, force, duration) for an office workstation and recommend controls in a hierarchy-of-controls order.
Diagram an office network (LAN, WAN link, firewall, switch, wireless access point, servers, endpoints) and label each device's role.
Compare on-premises, cloud, and hybrid hosting for an office application on cost, latency, availability, and administrative burden.
Explain how bandwidth, latency, and redundancy affect a shared database or collaboration tool used by a distributed team.
Your checkpoint
A labeled office network diagram with a one-page hosting recommendation matrix scoring at least three options on four criteria.
Project Management and Systems Implementation & Information Security, Privacy, and Regulatory Compliance
Build a work breakdown structure and critical-path schedule for an office-system implementation, identifying dependencies and float.
Identify project risks, score them on likelihood and impact, and assign a mitigation to each of the top five.
Map data-protection obligations (lawful basis, retention, access rights, breach notification) to the records handled in your week-2 schema.
Draft access-control rules (role-based) and an audit-logging requirement for the same system, tying each control to a specific risk.
Write a rollback and business-continuity outline for a failed go-live, including recovery time and recovery point targets.
Your checkpoint
A project charter package: WBS, critical-path schedule, top-five risk register, and a role-based access-control matrix mapped to data classes.
Decision Support, Analytics, and Quantitative Methods & Project Management and Systems Implementation
Build a decision matrix with weighted criteria for a software selection and test the recommendation's sensitivity to weight changes.
Compute and interpret basic forecasting and descriptive statistics (moving average, standard deviation) on a small operations dataset.
Construct a break-even or cost-benefit analysis for an automation investment and state the payback period.
Review the week-6 schedule against actual progress assumptions and recompute earned-value indicators (planned value, earned value, cost variance).
Your checkpoint
A decision-support workbook containing the weighted selection matrix, a sensitivity check, a break-even analysis, and an earned-value summary table.
Office Automation Systems and Productivity Software & Information Systems, Databases, and Data Management & Workflow Analysis, Process Modeling, and Business Process Improvement & Industrial Engineering Methods: Work Measurement, Methods Study, and Ergonomics & Networks, Hardware, and IT Infrastructure for Office Environments & Project Management and Systems Implementation & Information Security, Privacy, and Regulatory Compliance & Decision Support, Analytics, and Quantitative Methods
Re-audit the week-1 capability matrix and close or explicitly defer every remaining gap with a dated action.
Complete two timed mixed-domain practice sets and log every miss by domain and error type (knowledge gap, misread, calculation).
Re-derive from memory the key formulas: standard time, Little's Law, break-even, earned-value variances, and sampling size.
Write a one-page exam-day strategy covering pacing, question triage, and review order by domain weight.
Your checkpoint
A final gap-closure log with error-type tallies, a one-page formula sheet written from memory, and a timed practice-set score record.
Milestones
Week 2: Capability matrix shows no 'unknown' entries in Domain 1, and at least 10 SQL queries run correctly against the normalized schema.
Week 4: Can produce a standard time from raw element observations without notes, and the BPMN model passes a path-completeness check with no dangling gateways.
Week 6: Critical path and float are correctly identified on the implementation schedule, and every data class in the schema has an assigned access role and retention rule.
Week 8: Timed mixed-domain practice sets average at or above the target pass margin, with no domain below 60 percent and fewer than three calculation errors per set.