KY Plumber · Give each week a clear focus.
8 weeks · About 7 hours per week
Sanitary Drainage, Vents, and Venting Systems & General Regulations and Drainage System Design
Map the sanitary drainage and venting chapter structure: identify where fixture-unit tables, drain sizing tables, and vent sizing tables sit so you can locate any table within 30 seconds
Compute drainage fixture units for a two-bathroom house and a small commercial restroom from memory of the fixture-unit table, then verify against the table
Explain the difference between a common vent, a wet vent, a circuit vent, and a stack vent, and state one code condition that governs each
Trace a horizontal branch, stack, and building drain on a provided isometric sketch and label every pipe with its size and slope
List the slope requirements for horizontal drainage pipe by size and justify why slope changes are restricted between cleanouts
Your checkpoint
A one-page hand-drawn drainage and vent riser diagram for a two-story house with every pipe sized, sloped, and vent type labeled, plus a written justification of each sizing decision
Sanitary Drainage, Vents, and Venting Systems & Water Supply and Distribution
Solve ten vent sizing problems using developed length and the vent sizing table, including at least three vent stacks serving multiple fixtures
Identify the conditions that prohibit wet venting and the conditions that permit it, and write a one-paragraph summary in your own words
Size a cold-water distribution system for a single-family dwelling using the demand-weight method, showing the fixture-unit count and the resulting pipe sizes
Calculate available pressure at the most remote fixture given static pressure, elevation loss, and friction loss, and state whether the result is acceptable
Describe the purpose of an air gap, a vacuum breaker, and a reduced-pressure principle assembly, and place each in a correct application
Your checkpoint
A worked water-supply sizing sheet for one dwelling showing fixture units, demand in gallons per minute, developed length, and final pipe sizes at each segment
Fixtures, Fixture Fittings, and Fixture Traps & Traps, Interceptors, and Separators
Match each fixture type to its minimum trap size, trap arm length, and fixture-unit value without looking at the tables, then self-check and record errors
Explain the difference between a fixture trap, a fixture branch, and a fixture drain, and identify the trap seal depth requirement
Determine when a grease interceptor is required and size one from a given fixture count and flow rate
Distinguish where a sand interceptor, a grease interceptor, and an oil separator apply, and state one maintenance requirement for each
Diagnose five given trap problems such as siphonage, backpressure, and evaporation, and prescribe the corrective vent or trap change for each
Your checkpoint
A trap-and-interceptor reference card listing every fixture you can name with its trap size, trap arm limit, and fixture-unit value, plus two solved interceptor sizing problems
Water Supply and Distribution & Water Heaters and Temperature Control
Size a water heater for a dwelling using first-hour rating and peak-hour demand, showing the calculation step by step
State the temperature and pressure relief valve requirements including location, discharge piping, and termination
Explain thermal expansion control and identify when a closed system requires a device
Compute the developed length of a water distribution system and apply it to both friction loss and pressure loss calculations
Describe the requirements for a water heater installed in a garage, an attic, and a closet, and note the differences
Your checkpoint
A water heater installation checklist covering sizing, relief valve, expansion control, venting, and seismic or garage protection, each item citing the reason it matters
Plumbing Definitions, Materials, and Standards & Referenced Standards and Fuel Gas Piping
Classify the common plumbing materials by application: which are approved for underground drainage, for potable water, and for gas piping
Identify the standard designation and marking requirements for at least six pipe and fitting materials
Explain the joining methods for solvent-cemented plastic, soldered copper, and threaded steel, and state one common failure for each
Describe the scope of the fuel gas piping chapter: sizing methods, allowable materials, and testing requirements
Size a short gas branch line for a range and a water heater using the longest-length method and verify the result against the table
Your checkpoint
A material selection matrix with at least eight materials across rows and four applications across columns, with every cell filled in and justified
Storm Drainage and Special Plumbing Systems & Health Care Plumbing and Special Fixtures
Size a storm drainage system for a given roof area and rainfall intensity, showing the conversion from square feet to gallons per minute
Explain the differences between a primary roof drain, a secondary or overflow drain, and a scupper, and state the sizing rule for each
Identify the special plumbing requirements for health care fixtures such as clinical sinks, bedpan washers, and dialysis equipment
Describe the requirements for a medical gas or special waste system at a conceptual level and name the standard that governs it
List the special systems covered by the code such as indirect waste, potable water treatment, and irrigation, and state one key rule for each
Your checkpoint
A storm drainage sizing worksheet for a 20,000 square foot roof at a stated rainfall intensity, with primary and secondary drain sizes calculated and the arithmetic shown
General Regulations, Licensing, and Administrative Provisions & General Regulations and Drainage System Design
Outline the licensing and administrative provisions: permit requirements, inspection stages, and the consequences of working without a permit
Describe the appeals and variance process and the role of the authority having jurisdiction
Explain how the general regulations govern the design of a drainage system, including fixture clearances, access, and structural protection
Resolve five scenario questions about when a permit is required and when an inspection must be requested
Summarize the adoption and amendment structure of the code and how local amendments change the applicable requirements
Your checkpoint
A one-page permit and inspection flow map from plan review through final inspection, with the administrative rule cited at each step
Plumbing Math, Sizing Calculations, and Isometric Interpretation
Solve fifteen mixed calculation problems covering fixture units, slope and fall, pipe volume, pressure, and rainfall conversion under timed conditions
Interpret three isometric drawings and identify the errors in each without consulting notes
Take a full-length timed practice exam and score it by domain to find remaining weak areas
Re-study the two lowest-scoring domains using your own notes and reference cards
Write a one-page formula sheet from memory and verify every formula against the code
Your checkpoint
A scored full-length practice exam with a domain-by-domain error log listing every missed question, the correct reasoning, and the reference location
Milestones
Week 2: Can size a vent and a water distribution system from scratch without the tables open, and can explain wet venting rules in your own words
Week 4: Score at least 70 percent on a self-made 30-question quiz covering drainage, venting, water supply, and water heaters
Week 6: Complete the material matrix, storm drainage worksheet, and special systems outline with no unanswered cells or skipped calculations
Week 8: Score at least 80 percent overall on the timed practice exam with no domain below 65 percent