LA Fire Alarm key terms
LA Fire Alarm · Get comfortable with the vocabulary.
- Los Angeles Municipal Code (LAMC) Chapter 9
- Related: Local Amendment, Fire Code Permit
The article of the City of Los Angeles code that adopts and amends the fire code, including fire alarm requirements. It layers local amendments on top of the state and model codes, so both must be checked.
- Local Amendment
- Related: Los Angeles Municipal Code (LAMC) Chapter 9, LAFD Approval
A city-specific change that modifies or adds to an adopted model code such as NFPA 72. Amendments can tighten thresholds, add approval steps, or change testing intervals, and they govern over the base code text.
- NFPA 72
- Related: Acceptance Test, Inspection Testing and Maintenance (ITM)
The National Fire Alarm and Signaling Code, covering design, installation, inspection, testing, and maintenance of alarm systems. It is the primary technical standard referenced for alarm work and is periodically reissued in new editions.
- NFPA 70 (NEC)
- Related: Class A Circuit, Pathway Survivability
The National Electrical Code, governing wiring methods, overcurrent protection, grounding, and power circuits that feed fire alarm systems. Article 760 specifically addresses fire alarm wiring and cable requirements.
- NFPA 101 (Life Safety Code)
- Related: Occupancy Classification, Notification Appliance
The code that sets occupant protection requirements for buildings, including when alarm and detection systems are needed for means of egress. It works alongside the fire code and influences alarm scope decisions.
- Authority Having Jurisdiction (AHJ)
- Related: LAFD Approval, Plan Submittal
The organization or official with legal power to enforce code requirements and approve installations. In Los Angeles, the fire department typically fills this role for fire alarm systems, plan review, and final sign-off.
- LAFD Approval
- Related: Authority Having Jurisdiction (AHJ), Acceptance Test
Formal acceptance by the Los Angeles Fire Department of a design, product, or completed installation. Approval often follows plan review and a successful acceptance test, and it is required before a system is placed in service.
- Fire Code Permit
- Related: Plan Submittal, LAFD Approval
A permit issued for installing, modifying, or adding to a fire alarm system. Work without the required permit can trigger stop-work orders, failed inspections, and rework costs for the contractor.
- Plan Submittal
- Related: As-Built Drawings, Fire Code Permit
The package of drawings, calculations, device schedules, and product data sent to the reviewing authority before installation. A complete, code-referenced submittal reduces review cycles and rejections.
- Occupancy Classification
- Related: NFPA 101 (Life Safety Code), Notification Appliance
The category assigned to a building or space based on how it is used, such as assembly, business, or residential. The classification determines which alarm, detection, and notification features are required.
- Fire Alarm Control Unit (FACU)
- Related: Addressable System, Conventional Zone System
The central panel that receives signals from initiating devices, processes them, and controls notification appliances and auxiliary outputs. It also monitors circuit integrity and reports trouble conditions.
- Addressable System
- Related: Fire Alarm Control Unit (FACU), Conventional Zone System
A system where each initiating or output device has a unique address, letting the panel report the exact device in alarm or trouble. This speeds troubleshooting and allows precise response planning.
- Conventional Zone System
- Related: Addressable System, Initiating Device Circuit (IDC)
A system that groups devices into zones wired on shared circuits, so the panel reports a zone rather than an individual device. It is simpler and less expensive but gives less specific information.
- Initiating Device
- Related: Manual Pull Station, Smoke Detector
Any device that senses a fire condition or is manually operated to send an alarm signal to the control unit. Examples include smoke detectors, heat detectors, and manual pull stations.
- Initiating Device Circuit (IDC)
- Related: Class A Circuit, Conventional Zone System
The wiring pathway connecting initiating devices to the control unit. Its class, style, and supervision determine how the system behaves if the circuit is opened or shorted.
- Manual Pull Station
- Related: Initiating Device, Notification Appliance
A hand-operated device that lets a person trigger a fire alarm. It must be mounted at accessible heights and locations along exit paths, and it is tested by activating the mechanism.
- Smoke Detector
- Related: Heat Detector, Initiating Device
A device that senses smoke particles and sends an alarm signal. Common types include ionization, photoelectric, and air-sampling units, each suited to different environments and fire types.
- Heat Detector
- Related: Smoke Detector, Duct Detector
A device that responds to a fixed temperature threshold, a rapid rate of temperature rise, or both. It is used where smoke detection would cause nuisance alarms, such as kitchens or parking areas.
- Duct Detector
- Related: Heat Detector, Fire Alarm Control Unit (FACU)
A detector installed in an air-handling duct to sense smoke moving through the HVAC system. It typically triggers shutdown of the air handler and can also send an alarm signal to the panel.
- Notification Appliance
- Related: Audible and Visible Requirements, Notification Appliance Circuit (NAC)
A device that alerts occupants, such as a horn, strobe, speaker, or combination unit. Placement and output must meet audibility and visibility rules for the occupied space.
- Notification Appliance Circuit (NAC)
- Related: Voltage Drop Calculation, Notification Appliance
The circuit that supplies power and signals to horns, strobes, and speakers. Its voltage drop and current draw must be calculated so every appliance operates within its listed range.
- Audible and Visible Requirements
- Related: Notification Appliance, Synchronization
Rules setting minimum sound pressure levels and strobe coverage for occupied areas. Sound must rise above ambient noise, and strobes must be visible from all points in a room.
- Synchronization
- Related: Notification Appliance, Audible and Visible Requirements
Coordination of strobe flashes and horn signals so appliances in a field flash together rather than randomly. Synchronized output is required where multiple visible appliances serve the same area.
- Voltage Drop Calculation
- Related: Notification Appliance Circuit (NAC), Secondary Power Supply
A method of confirming that wiring resistance and current draw still leave adequate voltage at the farthest appliance. Excessive drop can weaken sound output or prevent appliances from operating.
- Primary Power Supply
- Related: Secondary Power Supply, Battery Calculation
The normal commercial utility source feeding the fire alarm system, usually through a dedicated branch circuit. It must be reliable, properly protected, and clearly identified at the panel.
- Secondary Power Supply
- Related: Battery Calculation, Primary Power Supply
A backup source, such as batteries or a generator, that keeps the system operating when normal power fails. It must support the system for a defined time in both standby and alarm conditions.
- Battery Calculation
- Related: Secondary Power Supply, Voltage Drop Calculation
The process of sizing backup batteries from standby current, alarm current, and required time durations, plus a derating factor for aging. Undersized batteries fail the required duration test.
- Class A Circuit
- Related: Class B Circuit, Pathway Survivability
A circuit whose wiring returns to the control unit so that a single open fault does not disable the circuit. It continues to function with an open, and the fault is reported as a trouble condition.
- Class B Circuit
- Related: Class A Circuit, Initiating Device Circuit (IDC)
A circuit that does not return to the control unit, so an open fault disables the portion beyond the break. The fault is supervised and reported, but operation is lost on that segment.
- Pathway Survivability
- Related: Class A Circuit, Circuit Integrity Cable
The ability of the wiring path to keep working during a fire, achieved through circuit redundancy, routing, or protective construction. Higher levels are required in tall buildings and certain occupancies.
- Circuit Integrity Cable
- Related: Pathway Survivability, NFPA 70 (NEC)
Cable listed to maintain operation for a specified period under fire exposure. It is used where the code requires a protected pathway and standard cable would not satisfy survivability.
- Supervision
- Related: Trouble Signal, Class B Circuit
Continuous monitoring of circuits and components for opens, shorts, grounds, and other faults. Supervised systems report abnormal conditions as trouble signals rather than failing silently.
- Trouble Signal
- Related: Supervision, Inspection Testing and Maintenance (ITM)
An audible and visible indication at the control unit that a fault exists, such as a wiring break or power loss. Troubles must be acknowledged and corrected, and they are recorded during inspections.
- Inspection Testing and Maintenance (ITM)
- Related: Acceptance Test, Test Record
The recurring program of visual checks, functional tests, and servicing that keeps a system reliable. Frequencies vary by component, and results must be documented for the authority having jurisdiction.
- Acceptance Test
- Related: LAFD Approval, Inspection Testing and Maintenance (ITM)
A full functional test performed after installation and before the system is accepted for use. It demonstrates that devices, circuits, and notification appliances operate as designed and code requires.
- Test Record
- Related: Inspection Testing and Maintenance (ITM), As-Built Drawings
Written documentation of inspection and test results, including date, device tested, outcome, and tester. Records support code compliance and help track recurring deficiencies over time.
- As-Built Drawings
- Related: Plan Submittal, Test Record
Updated drawings reflecting the system as actually installed, including device locations and circuit routing. They are essential for future maintenance, additions, and fire department pre-incident planning.
- Lockout/Tagout (LOTO)
- Related: Personal Protective Equipment (PPE), Job Hazard Analysis
A safety procedure that isolates energy sources and prevents accidental re-energizing during service work. It protects workers from shock and unexpected system activation on alarm circuits.
- Job Hazard Analysis
- Related: Lockout/Tagout (LOTO), Personal Protective Equipment (PPE)
A pre-task review that identifies hazards, such as live circuits or overhead work, and defines controls before work begins. It documents the safety plan and is shared with the crew.
- Personal Protective Equipment (PPE)
- Related: Lockout/Tagout (LOTO), Job Hazard Analysis
Gear worn to reduce injury risk, including safety glasses, gloves, hard hats, and hearing protection. Selection depends on the task, and damaged or incorrect equipment must not be used.