Electrical Controls, Motors, and Troubleshooting

This domain tests the 24-volt control circuit, motor types, capacitor and winding tests, and the order in which a technician should troubleshoot.

Control circuit

  • The transformer is sized in VA to carry every load on the circuit; adding an ECM or a zoning panel without upsizing causes nuisance lockouts.
  • Thermostat terminals: R power, W heat, Y compressor, G blower, O/B reversing valve, C common. A smart thermostat needs C.
  • Devices include contactors, fan relays, time delays, defrost boards, sequencers for electric heat, float switches, and high and low pressure switches.

Motors

  • PSC motors need a run capacitor; ECM and constant-torque motors are programmed and respond to a low-voltage signal.
  • Discharge a capacitor before testing. Measure microfarads and replace when outside the marked tolerance, commonly 10 percent, or when the top bulges.
  • Compressor terminals are C, S, and R. Common-to-start plus common-to-run should equal start-to-run.

Worked example

Readings: C to R is 1.8 ohms, C to S is 2.2 ohms, so S to R should be about 4.0 ohms. A reading of 4.1 ohms means the windings are intact. An open reading means an open winding or an open internal overload. A reading far below 4.0 indicates shorted turns. Any continuity from a terminal to the shell means the compressor is grounded.

Traps that cost marks

  • Ohming a capacitor without discharging it.
  • Replacing a control board when a safety switch simply opened.
  • Ignoring nameplate RLA and LRA when judging compressor amp draw.
  • Overlooking the C wire on a new thermostat, then blaming the board.
  • Testing a PSC motor without checking its capacitor first.