LA Land Surveyor study materials
LA Land Surveyor study resources

Grid Versus Ground on a Foothill Pipeline

LA Land Surveyor · Put your knowledge to work in context.

All case studies

Grid Versus Ground on a Foothill Pipeline

A 1,200-ft water transmission main is being designed in the Sierra foothills at an average ground elevation of 3,450 ft. Your control network is on CCS83, Zone 3 (California III), and the combined factor at the project centroid is 0.99987. The design engineer's plan shows a station equation and a "ground" distance of 1,200.00 ft between two valve nodes. The contractor's GPS machine-control model was built by another surveyor using an assumed coordinate system with a base station on a local arbitrary point; the contractor reports that the pipe alignment is "0.18 ft off" from your stakes. Your RTK check shots on your total-station control differ by 0.10 to 0.15 ft horizontally and by 0.45 ft vertically. A second crew's file is tagged NAD83(2011), epoch 2010.0; the machine-control file is tagged NAD83(2011) but was localized to an arbitrary base using GEOID12B, while your RTK uses GEOID18.

1. Compute the grid distance corresponding to the 1,200.00-ft ground distance and explain the direction of the scale factor.

Read the worked answer

Ground and grid are related by the combined factor, CF = scale factor x elevation factor: grid = ground x CF, and ground = grid / CF. A CF below 1 means grid distances are shorter than ground distances. Here ground = 1,200.00 ft and CF = 0.99987, so grid = 1,200.00 x 0.99987 = 1,199.844 ft, about 0.156 ft shorter. Conversely, if the plans showed 1,200.00 ft of grid, the ground distance would be 1,200.00 / 0.99987 = 1,200.156 ft. The 0.16-ft difference is close to the contractor's reported 0.18-ft offset, so a grid/ground mismatch is a prime suspect. Always state which distance is on the plans and which is on the control, and label the combined factor used.

2. Diagnose the 0.18-ft horizontal and 0.45-ft vertical disagreements between your stakes and the machine-control model.

Read the worked answer

Treat horizontal and vertical separately. Horizontally, 0.10 to 0.15 ft between RTK and total station is within typical RTK uncertainty in foothill conditions, but add the 0.16-ft grid/ground scale difference and the arbitrary-base localization, and the 0.18-ft machine-control offset is explained. The vertical 0.45 ft is too large for random error: GEOID12B versus GEOID18 can differ by several tenths of a foot in the Sierra, and an arbitrary base with a localization will absorb a bad ellipsoid-to-orthometric conversion. Check the realization and epoch, the geoid model named in each file, the base coordinates, and whether the localization used enough well-distributed points. Do an independent check on a published NGS monument and run a constrained adjustment of your control. Then publish one project datum and one geoid model.

3. What control deliverable should you give the contractor so that machine control and stakes agree?

Read the worked answer

Deliver a signed and sealed control package: a control diagram with coordinates, the datum realization and epoch (NAD83(2011), epoch 2010.0), the geoid model, the combined factor, and the definition of any project ground system; the transformation between grid and project ground; at least three check points independent of the model; and a metadata note describing all of it. Require the contractor to localize to your control and to verify on the check points before grading. Put the same metadata in the machine-control file and in the staking file so the two agree. If a second crew is on the job, require the same realization, geoid, and project datum; otherwise the 0.1-to-0.5-ft differences will recur. State clearly whether the pipe alignment is defined in grid or ground coordinates.