LA Land Surveyor study materials
LA Land Surveyor study resources

LA Land Surveyor cheat sheet

LA Land Surveyor · Keep the key ideas within reach.

Quick reference

Boundary Surveying and Retracement

  • Retracement follows the footsteps of the original surveyor; it does not create new boundaries, only locates existing ones.

  • California priority of evidence: natural monuments, then artificial monuments, then courses and distances, then area; quantity of evidence and harmony of the whole can outweigh a single call.

  • Original government survey corners are protected; a lost corner is reestablished by proportionate measurement between the nearest existing original corners on the line.

  • Single proportionate measurement applies to a lost corner on a line; double proportionate measurement is used for a lost corner in the interior where two intersecting lines meet.

  • A meander line does not mark the water boundary; it is an approximation of the bank, and the actual water boundary is ambulatory.

  • For a non-riparian lot, area is governed by the calls and monuments; for a riparian lot, accretion and reliction move the boundary with the ordinary high water mark.

  • Adverse possession and prescriptive easement require distinct elements: actual, open and notorious, exclusive, hostile, continuous for the statutory period (California: 5 years for possession).

  • Parol evidence may be admitted to explain an ambiguity in a deed but not to contradict or vary unambiguous terms.

Quick reference

Legal Principles and Professional Practice

  • California Land Surveyors Act (Business and Professions Code §§8700 et seq.) governs licensure; only a licensed land surveyor may practice land surveying.

  • A licensed land surveyor may also practice civil engineering only if separately licensed as a civil engineer; the reverse is not true.

  • Professional negligence standard: the surveyor owes the duty of reasonable care and competence of a professional in the same or similar community.

  • Statute of limitations for written contracts in California is generally 4 years; oral contracts 2 years; latent defects may extend the period.

  • Record of Survey (Business and Professions Code §8762) is required when material evidence is found that differs from the record, when a corner is reestablished, or when a subdivision is not shown on a recorded map.

  • The Record of Survey map must be filed with the county surveyor within 90 days of the survey's completion when required by §8762.

  • A surveyor must not sign or seal work not performed under their responsible charge; stamping plans reviewed only superficially is a violation.

  • Ethical obligations: disclose conflicts of interest, maintain confidentiality, and do not accept compensation from more than one party for the same service without consent.

Quick reference

Geodesy and Coordinate Systems

  • NAD83 (2011) is the current horizontal datum for California; NAD27 is legacy and differs by 10–100 m depending on location.

  • State Plane Coordinate System in California uses six zones; each zone has a defined projection and a scale factor that must be applied to convert ground distances to grid distances.

  • Combined factor = elevation factor × grid (scale) factor; ground distance × combined factor = grid distance.

  • Elevation factor ≈ R / (R + h), where R is the earth radius (≈6,371,000 m) and h is the average orthometric height above the ellipsoid.

  • NAVD88 is the current vertical datum; NGVD29 is legacy. Orthometric heights differ from ellipsoid heights by the geoid separation N (h = H + N).

  • UTM zones: California spans zones 10 and 11; UTM uses a transverse Mercator projection with a central meridian scale factor of 0.9996.

  • Geodetic azimuth is measured from grid north or true north; convergence angle converts between grid and true azimuth.

  • Latitude/longitude conversions require a datum; mixing NAD27 and NAD83 coordinates in the same computation produces systematic errors.

Quick reference

Measurement and Instrumentation

  • Total station angle accuracy is specified in seconds (e.g., 2"); distance accuracy is typically ±(2 mm + 2 ppm).

  • EDM errors: a constant offset (prism constant) and a scale error (ppm) that grows with distance; atmospheric correction uses temperature and pressure.

  • Horizontal angle measurement uses theodolite/total station; face-left and face-right observations cancel collimation and trunnion axis errors.

  • Leveling loop misclosure is distributed proportionally to the number of setups or distances; allowable misclosure often expressed as C√km.

  • GNSS static accuracy improves with longer observation sessions; RTK accuracy is typically 1–2 cm horizontal and 2–4 cm vertical.

  • Traverse closure: linear error of closure = √(ΔE² + ΔN²); relative precision = closure / perimeter.

  • Instrument leveling: check bubble, set up over point, and perform a two-peg test to verify collimation error.

  • Taping corrections include temperature, tension, sag, and slope; each correction is added or subtracted from the measured length.

Quick reference

Photogrammetry and Remote Sensing

  • Scale of a vertical aerial photograph = f / H, where f is focal length and H is flying height above ground.

  • Relief displacement on a vertical photo increases with radial distance from the principal point and with object height; it is zero at the nadir.

  • Stereo overlap for mapping is typically 60% forward overlap and 20–30% sidelap.

  • Ground sample distance (GSD) = pixel size × flying height / focal length.

  • Orthophoto rectification removes relief displacement and tilt, producing a uniform-scale image.

  • LiDAR point cloud classification separates ground, vegetation, and structures; a DEM derived from ground returns represents bare earth.

  • Photogrammetric triangulation (bundle adjustment) solves camera positions and object coordinates simultaneously from overlapping imagery.

  • NDVI = (NIR − Red) / (NIR + Red); values near 1 indicate healthy vegetation, near 0 indicate bare soil or water.

Quick reference

Cartography and Mapping

  • Map scale is the ratio of map distance to ground distance; a 1:24,000 map has 1 inch = 2,000 feet.

  • Large-scale maps show more detail over smaller areas; small-scale maps cover larger areas with less detail.

  • Contour interval is the vertical distance between adjacent contour lines; index contours are heavier and labeled.

  • Hachures indicate depressions; closed contours with hachures point inward.

  • Map projections distort area, shape, distance, or direction; no projection preserves all four.

  • A GIS map must state datum, projection, and units; mixing layers with different datums without transformation causes misalignment.

  • Legends, north arrows, scale bars, and metadata are required elements of a professional map.

  • Generalization reduces detail for smaller scales; it includes simplification, smoothing, aggregation, and displacement.

Quick reference

Subdivision Map Act and Land Development

  • Subdivision Map Act is codified in Government Code §§66410 et seq.; it governs the division of land in California.

  • A tentative map must be filed with the local agency; approval is discretionary and subject to the Subdivision Map Act and local ordinance.

  • A parcel map is required for subdivisions creating four or fewer lots; a final map is required for five or more lots (with exceptions).

  • A final map must be based on a field survey and be tied to a Record of Survey or official monuments.

  • The Subdivision Map Act requires dedications, reservations, and improvements as conditions of approval; exactions must have a reasonable relationship to the project.

  • A lot line adjustment (four or fewer parcels) is processed under Government Code §66412(d), not as a subdivision.

  • A certificate of compliance may be issued to legalize an existing parcel that does not conform to current standards.

  • Coastal and hillside subdivisions may require additional geologic and environmental review under CEQA.

Quick reference

Construction Surveying

  • Construction staking transfers design positions to the field using control points, offsets, and grades.

  • Benchmarks establish vertical control; a temporary benchmark must be tied to a published datum.

  • Slope staking sets grade stakes at a specified offset from the centerline; cut/fill is the difference between design and existing grade.

  • Horizontal control for construction is typically a traverse or GNSS network with stated accuracy; check shots verify the setup.

  • As-built surveys document constructed conditions and are compared to design for payment and acceptance.

  • Machine control uses 3D models and GNSS or total station to guide grading equipment; accuracy depends on base station and model quality.

  • Tolerance for construction layout is often specified in the contract (e.g., ±0.05 ft for structures, ±0.10 ft for grading).

  • Safety and traffic control plans are required for work within public right-of-way.

Quick reference

Geographic Information Systems

  • Vector data models represent points, lines, and polygons; raster models represent continuous surfaces as cells.

  • Topology defines spatial relationships (adjacency, connectivity, containment) and prevents gaps and overlaps in vector data.

  • A coordinate system in GIS includes datum, projection, and units; reprojecting on the fly can introduce error if not done correctly.

  • Attribute joins link tables by a common key; a one-to-many join can duplicate features.

  • Spatial analysis includes buffer, overlay (union, intersect), and proximity; overlay requires consistent coordinate systems.

  • Raster resolution (cell size) controls detail; smaller cells increase storage and computation.

  • Metadata documents source, accuracy, projection, and processing history; it is required for data sharing and quality control.

  • Geodatabase feature classes can enforce domains and subtypes to maintain data integrity.