LA Land Surveyor study plan
LA Land Surveyor · Give each week a clear focus.
8 weeks · About 7 hours per week
Boundary Surveying and Retracement
Define and distinguish the core retracement doctrines (monument control, original vs. subsequent surveys, intent of the original surveyor) and state where each applies
Classify boundary evidence into natural monuments, artificial monuments, courses and distances, and area, and rank them by evidentiary weight
Solve at least 10 proportioning and single-proportion problems involving lost corners on straight and curved lines
Explain how California case law treats conflicting monuments versus record measurements in a retracement
Your checkpoint
A one-page evidence-hierarchy cheat sheet plus a worked solutions log of 10 lost-corner proportioning problems with answers and error checks
Boundary Surveying and Retracement
Reconstruct a full boundary from a written deed description without any figure, resolving calls in priority order
Analyze water-boundary and riparian/littoral questions, including meander lines, accretion, reliction, and avulsion
Apply rules for easements, rights-of-way, and prescriptive or agreed boundaries to a fact pattern
Compute the effect of a discrepancy between record distance and measured distance on a closing boundary
Your checkpoint
A written retracement report for a hypothetical 40-acre parcel that cites each controlling call, resolves two conflicts, and closes the traverse within 1:10,000
Legal Principles and Professional Practice
Outline the legal elements of a valid deed and identify which defects are curable versus void
Explain the surveyor's duty of care, standard of care, and the four elements of negligence in a boundary dispute
Describe the California boundary-monument recordation process and the surveyor's role in it
Draft a short engagement scope that limits liability and clarifies deliverable standards
Your checkpoint
A 1,500-word legal-issue memo covering deed validity, negligence exposure, and monument recordation, with a checklist of practice safeguards
Geodesy and Coordinate Systems & Measurement and Instrumentation
Convert between geodetic, State Plane, and ground coordinates, and compute a combined scale factor for a given project
Distinguish NAD27, NAD83, and modern datum realizations and state the practical consequence of mixing them
Select the correct instrument and procedure for a stated accuracy requirement (total station, GNSS static, RTK, level)
Compute misclosure and adjust a traverse by compass rule and by least squares, then compare the results
Your checkpoint
A spreadsheet that computes combined scale factor, grid-to-ground distances, and a traverse adjustment for a sample 6-course traverse, plus a one-page instrument-selection matrix
Subdivision Map Act and Land Development
Outline the Subdivision Map Act process from tentative map through final map, including approval timelines and findings
Distinguish parcel maps, final maps, and lot line adjustments by applicability and filing requirements
Identify the surveyor's statutory duties in preparing and certifying a map, including monumentation obligations
Explain how conditions of approval, dedications, and exactions affect the boundary surveyor's scope
Your checkpoint
A process flowchart of the map act timeline with statutory deadlines annotated, plus a one-page comparison table of map types and their triggers
Photogrammetry and Remote Sensing & Cartography and Mapping
Compute photo scale, ground coverage, relief displacement, and stereoscopic parallax from given flight and camera parameters
Explain orthorectification and identify the error sources that remain after it
Interpret map projection choices and scale effects for a mapping product, including distortion at the edges of a zone
Evaluate a map's fitness for a stated purpose using accuracy standards and metadata
Your checkpoint
A worked problem set of 12 photogrammetry and mapping calculations with answers, plus a written evaluation of one map product against a stated accuracy standard
Construction Surveying & Geographic Information Systems
Set out a horizontal and vertical alignment from control, including stationing, offsets, and cut/fill checks
Explain construction staking tolerances and how to document as-built conditions
Compare vector and raster data models and choose an appropriate one for a parcel-mapping use case
Describe coordinate system handling, datum transformation, and metadata requirements in a GIS that ingests survey data
Your checkpoint
A construction stakeout plan for a sample 300-foot alignment with computed stations and offsets, plus a GIS data-flow diagram showing survey-to-GIS datum handling
Boundary Surveying and Retracement & Legal Principles and Professional Practice & Geodesy and Coordinate Systems & Measurement and Instrumentation & Photogrammetry and Remote Sensing & Cartography and Mapping & Subdivision Map Act and Land Development & Construction Surveying & Geographic Information Systems
Diagnose weak domains from practice-test results and re-drill the two lowest-scoring areas
Re-derive the highest-yield formulas (proportioning, scale factor, traverse closure, photo scale) from memory
Work a full mixed-topic practice exam under timed conditions and review every miss
Compile a final one-page reference sheet of rules, formulas, and case-law principles for exam day
Your checkpoint
A timed 100-question practice exam score report showing domain-by-domain results, plus a completed one-page final reference sheet
Milestones
Week 2: Complete a full retracement from a written deed alone, closing within 1:10,000, and correctly rank all evidence calls without reference notes
Week 4: Score at least 75 percent on a self-made 30-question mixed set covering boundary, legal, geodesy, and measurement
Week 6: Solve photogrammetry and mapping calculations at 80 percent or better and correctly compute a combined scale factor unaided
Week 8: Score 80 percent or higher overall on the timed practice exam with no domain below 70 percent