This domain tests layout and verification for construction. Expect questions on control, stationing, horizontal and vertical curves, grades, earthwork, tolerances, and as-built surveys.

Core rules

  • Construction layout starts from project control and benchmarks, not from arbitrary site points. Check control before setting anything.
  • Stationing is measured along a baseline; 10+00 means 1,000 ft.
  • Horizontal curve: tangent T = R tan(delta/2); length L = R x delta in radians; external E = R(sec(delta/2) - 1); midordinate M = R(1 - cos(delta/2)).
  • Degree of curve has arc and chord definitions; using the wrong one shifts curve geometry.
  • Vertical curve: K = L/A, where A is the algebraic difference in grades in percent. Elevations follow a parabola.
  • Earthwork volumes use average end area or prismoidal methods.
  • As-built surveys compare constructed positions with design and document tolerances.

Worked example

A curve has R = 500.00 ft and delta = 40 degrees. T = 500 tan 20 = 181.99 ft. L = 500 x 0.698132 = 349.07 ft. If the PI is at station 10+00.00, PC = 1,000.00 - 181.99 = 8+18.01. PT = 818.01 + 349.07 = 11+67.08.

Traps

  • Using the chord definition of degree of curve when the design uses arc.
  • Making station arithmetic errors across the 10+00 break.
  • Reversing cut and fill signs.
  • Computing K with A in decimal instead of percent.
  • Setting out grid distances as ground distances.