LA Roofing Contractor study materials
LA Roofing Contractor study resources

LA Roofing Contractor study plan

LA Roofing Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Roofing Materials, Systems and Installation Practices

  • Classify steep-slope and low-slope roof systems by slope range, membrane type, and typical warrantable use

  • Identify the components and correct layering sequence of a steep-slope assembly, from deck through ridge cap

  • Match underlayment types to slope conditions and roof-covering weight

  • Name the flashing details required at valleys, sidewalls, headwalls, and penetrations for each major system

Your checkpoint

A one-page matrix covering 6 roof systems across 5 attributes (30 filled cells), written from memory and then corrected against references, with every correction highlighted

Week 2

Roofing Materials, Systems and Installation Practices & Roofing Codes, Standards and Plan Reading

  • Compute roof area from plan dimensions using pitch multipliers for 3/12 through 12/12

  • Interpret manufacturer installation instructions and translate each requirement into an inspectable jobsite checkpoint

  • Differentiate fastening schedules and patterns for shingle, tile, and metal systems

  • Explain how ventilation intake-to-exhaust balance is calculated for a given attic footprint

Your checkpoint

15 worked calculations (roof area, pitch multiplier, ventilation net free area) with formulas and units shown, scored at 90% or better on a self-check

Week 3

Roofing Codes, Standards and Plan Reading & Roofing Materials, Systems and Installation Practices

  • Read a full plan set: locate roof plan, sections, and details, and state what each sheet governs

  • Decode common architectural and structural symbols, line types, and abbreviations used on roof drawings

  • Locate and quote code provisions governing slope, underlayment, and flashing in the applicable code edition

  • Cross-check a written specification against the drawing set and list any conflicts

Your checkpoint

An annotated roof plan and two detail sheets marked up with at least 20 callouts linking drawing content to a specific code or specification requirement

Week 4

Roofing Materials, Systems and Installation Practices & Roofing Codes, Standards and Plan Reading

  • Consolidate domain 1 and 2 content into a personal reference sheet limited to two pages

  • Work timed practice sets under exam pacing to build speed on calculation and code-lookup items

  • Diagnose and log every missed item by root cause (knowledge gap, misread, unit error)

Your checkpoint

A 40-question timed practice exam in domains 1-2 scored at 80% or higher, plus a written error log naming the cause of each miss

Week 5

Business, Law and Contract Management

  • Outline the licensing framework for a Louisiana roofing contractor, including who must hold a license and what triggers a license requirement

  • Identify the essential terms of a residential roofing contract and draft plain-language clauses for scope, change orders, and payment schedule

  • Explain the sequence and deadlines for preserving lien and payment rights on a private works project

  • Distinguish the coverage and exclusions of general liability, workers' compensation, and builder's risk policies

Your checkpoint

A 12-point contract review checklist plus a drafted sample roofing contract containing all 12 points

Week 6

Business, Law and Contract Management & Jobsite Safety and Occupational Practices

  • Build a defensible estimate: quantify materials with waste factor, labor hours by task, overhead, and markup

  • Apply employment, subcontracting, and recordkeeping obligations to a two-crew scenario

  • Explain the employer's duties under the hazard communication and injury recordkeeping standards

  • Establish a written disciplinary and corrective-action procedure for safety violations

Your checkpoint

A complete sample bid for a 30-square re-roof showing quantity takeoff, waste factor, labor, overhead, and profit, with a one-page narrative justifying each number

Week 7

Jobsite Safety and Occupational Practices

  • Specify fall protection systems and trigger heights for roof work, including residential steep-slope exceptions

  • Select and inspect ladder, scaffold, and anchor equipment against the applicable standard

  • Write hazard controls for the top roofing exposures: falls, heat, electrical, struck-by, and silica

  • Sequence a pre-task safety briefing from a written job hazard analysis

Your checkpoint

A job hazard analysis for a full tear-off and replacement, covering at least 8 hazards with a specific control, responsible person, and verification method for each

Week 8

Roofing Materials, Systems and Installation Practices & Roofing Codes, Standards and Plan Reading & Business, Law and Contract Management & Jobsite Safety and Occupational Practices

  • Synthesize all four domains through full-length timed simulations

  • Re-drill the highest-frequency missed concepts until each is answered correctly twice in a row

  • Rehearse the two-page reference sheet until it can be reconstructed in under 10 minutes

  • Finalize test-day logistics, identification requirements, and timing strategy

Your checkpoint

Two full-length timed practice exams, each scored at 85% or higher, with a final one-page list of remaining weak areas and a remediation action for each

Milestones

Week 2: Can compute roof area and pitch multiplier for any given plan dimension without references, and explain the layering sequence of all 6 studied roof systems aloud in under 5 minutes

Week 4: Scored 80% or better on the 40-question domains 1-2 exam, and the error log demonstrates root-cause analysis rather than merely listing missed topics

Week 6: Produced a complete bid and a complete contract for a realistic project, each of which a licensed contractor would accept without correction

Week 8: Two consecutive full-length practice exams at 85% or higher with no domain falling below 75%