32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Solar noon sun angle
Solar noon altitude equals 90 degrees minus site latitude plus solar declination; declination is +23.44 degrees at the June solstice, 0 degrees at the equinoxes, and -23.44 degrees at the December solstice.
Accessible route running slope
The maximum running slope of an accessible route is 1:20, or 5 percent; any steeper segment must be built as a ramp limited to 1:12 with landings at each 30 inches of rise.
Wheelchair turning space
A 60-inch-diameter clear circle, or a T-shaped space measuring 60 by 60 inches with 36-inch arms, must be provided where a wheelchair needs to turn within a route or room.
Net-to-gross area ratio
Net assignable area divided by gross building area measures planning efficiency; circulation, partitions, structure, and mechanical space typically consume 15 to 25 percent of gross area.
Windbreak downwind shelter distance
A dense tree and shrub windbreak reduces wind speed about 50 percent at 2 to 5 tree heights downwind, with useful shelter extending to roughly 10 tree heights.
Accessible parking access aisle
Accessible car spaces pair an 8-foot-wide stall with an 8-foot access aisle; van-accessible spaces require an 11-foot aisle, or an 8-foot aisle beside a 9-foot-wide stall.
Landscape design phase sequence
Landscape projects proceed from programming and site analysis through schematic design, design development, construction documents, bidding, and construction administration, with owner approvals at phase gates.
Tennis court play dimensions
A doubles tennis court playing surface measures 36 by 78 feet; allowing runback and side clearance, the fenced court area is commonly planned at about 60 by 120 feet.
Three-part specification format
Under SectionFormat, each specification section is divided into Part 1 General, Part 2 Products, and Part 3 Execution, with submittals, product standards, and installation methods placed accordingly.
Approved as noted stamp
A submittal review action permitting the contractor to proceed if the reviewer's noted corrections are incorporated; it does not relieve the contractor of complying with the contract documents.
Change order signatories
A change order modifies contract scope, price, or time and must be signed by both the owner and the contractor after the design professional prepares and negotiates it.
Construction change directive
A written directive signed by the owner and design professional that orders a change before price and time are agreed; it is later converted into a change order.
Retainage
A percentage of each progress payment, commonly 5 to 10 percent, withheld by the owner until substantial completion as protection against incomplete or defective work.
Substantial completion
The stage at which work is sufficiently complete for the owner's intended use; it starts warranty periods, transfers insurance and utility responsibility, and often releases retainage.
Request for information
A formal request seeking clarification of the contract documents from the design professional; the response clarifies intent but does not itself change contract cost or time.
Record drawings
Drawings marked by the contractor to record field changes and actual installed conditions; they document as-built geometry but are not themselves contract modifications.
Concrete control joint spacing
For slab-on-grade concrete, control joints are spaced about 2 to 3 times the slab thickness in feet, roughly 8 to 12 feet for a 4-inch slab.
Concrete design strength
Landscape and residential flatwork typically uses 3,000 to 4,000 psi concrete, which reaches design strength at 28 days; pedestrian paving is commonly 4 to 6 inches thick.
ACQ treated lumber fasteners
Alkaline copper quaternary treated wood is corrosive to plain steel, so hot-dip galvanized or stainless steel fasteners and connectors rated for the exposure must be used.
Retaining wall drainage layer
A washed-gravel drain wrapped in filter fabric and drained by weep holes or perforated pipe placed behind a retaining wall relieves hydrostatic pressure and prevents structural failure.
Brick mortar joint thickness
Standard brick masonry uses 3/8-inch mortar joints; Type N mortar suits general above-grade work, while Type S is used where greater compressive strength is needed.
Asphalt pavement section
A light-duty asphalt walk or drive uses 2 to 3 inches of compacted asphalt over 6 to 8 inches of compacted aggregate base, with at least 2 percent surface slope.
Playground fall surfacing depth
Engineered wood fiber is installed at depths established by the manufacturer's critical-height testing, often 9 to 12 inches for fall heights near 10 to 12 feet.
Tree protection zone radius
A construction fence enclosing at least the dripline, and ideally 1 foot of radius per inch of trunk diameter, protects roots from compaction, grade change, and stockpiling damage.
Percent slope formula
Slope in percent equals rise divided by run, multiplied by 100; a 2-foot drop over 50 feet of run is 4 percent, equivalent to a 1:25 ratio.
Rational method equation
Peak runoff Q equals the runoff coefficient C times rainfall intensity i times drainage area A; Q is in cubic feet per second when i is inches per hour and A is acres.
Rational method runoff coefficients
Typical C values are about 0.9 for pavement, 0.2 to 0.3 for lawns, and 0.1 to 0.2 for dense woodland, reflecting how much rainfall becomes surface runoff.
NRCS curve numbers
Curve numbers range from about 30 to 98: impervious pavement is 98, good-condition lawn about 61, and good woodland about 55; higher numbers mean more runoff.
Swale minimum slope
Drainage swales require a longitudinal slope of at least 0.5 to 1 percent, plus about 6 inches of freeboard above the design water surface to contain overtopping.
Acre and cfs conversions
One acre equals 43,560 square feet, and one cubic foot per second equals about 448.8 gallons per minute; one inch of rain over an acre yields 3,630 cubic feet.
Detention storage volume
Detention volume equals inflow volume minus allowable outflow volume over the design storm, estimated by integrating the inflow and outflow hydrographs for the storm duration.
Rain garden ponding depth
Rain gardens are typically designed with 6 to 12 inches of ponding depth above the media surface so stored runoff infiltrates and draws down within 24 to 48 hours.