LARE study plan
LARE · Give each week a clear focus.
8 weeks · About 7 hours per week
Construction Materials and Methods
Classify 10 given soil samples using USCS and AASHTO criteria from gradation and plasticity data
Compute material quantities for a concrete slab, footing, and modular paver area from given dimensions
Differentiate rigid versus flexible pavement sections and label every layer with its function
Build a 40-term materials and methods glossary covering concrete, asphalt, masonry, metals, and wood
Explain how soil bearing capacity and compaction requirements drive footing and pavement design
Your checkpoint
One-page soil classification and quantity takeoff worksheet with 10 worked problems plus a completed 40-term glossary
Construction Materials and Methods & Grading, Drainage, and Stormwater Management
Convert 15 given values between percent grade, slope ratio, and degrees without reference aids
Derive drainage direction and flow paths from a described contour map with a stated contour interval
Sketch a retaining wall section showing footing, drainage aggregate, weep holes, and backfill
Detail stair, ramp, and site wall construction assemblies with dimensions and material callouts
Calculate rise, run, and landing requirements for a given grade change
Your checkpoint
Grading and detailing packet: 15 solved slope conversions, a labeled retaining wall sketch, and a dimensioned stair/ramp detail
Grading, Drainage, and Stormwater Management
Compute peak runoff for 5 given drainage areas using the Rational Method with correct runoff coefficients
Size a vegetated swale using Manning's equation from given slope, vegetation, and design flow
Lay out a stormwater management train from source to discharge, labeling each BMP and its purpose
Select erosion and sediment control measures for a stated construction sequence
Estimate cut and fill volumes for a simple grid of spot elevations
Your checkpoint
One-page stormwater calculation sheet with 5 fully worked problems, including a swale sizing and a cut/fill balance
Grading, Drainage, and Stormwater Management & Project Planning and Design
Design a grading plan for a described 1-acre site that drains away from all structures at minimum required slopes
Verify accessible-route running slope, cross slope, and landings against ADA limits
Balance earthwork on a spot-elevation grid and state the net import or export volume
Perform a site analysis identifying sun, wind, views, noise, and circulation constraints
Translate site constraints into three schematic design alternatives
Your checkpoint
Schematic grading plan with spot elevations, flow arrows, an earthwork balance table, and a one-page site analysis summary
Project Planning and Design
Write a functional program for a described site, listing spaces, areas, adjacencies, and users
Analyze sun and wind exposure and state design responses for each
Select plants for three stated site conditions (moist shade, dry full sun, salt exposure) with justification
Apply spatial design principles to arrange program elements into a defensible layout
Evaluate a layout against circulation, safety, and maintenance criteria
Your checkpoint
Two-page schematic design narrative with an adjacency diagram, a bubble diagram, and a justified planting palette
Project Planning and Design & Construction Documentation and Administration
Convert a schematic layout into design development drawings with dimensions and materials specified
Assemble a drawing index and sheet organization for a small landscape project
Identify the purpose and required content of plans, sections, elevations, details, and schedules
Draft two CSI-format specification sections with scope, submittals, and execution requirements
Match common plan symbols and abbreviations to their meanings
Your checkpoint
Mock plan set table of contents and sheet list plus two drafted specification sections
Construction Documentation and Administration
Sequence the construction administration process from bidding through final closeout
Draft a written response to a given RFI that resolves the field conflict without changing scope
Review a submittal and mark it approved, approved as noted, or rejected with reasons
Calculate the cost and schedule impact of a given change order
Differentiate lump sum, unit price, and cost-plus contract types and their risk allocation
Your checkpoint
Construction administration workflow flowchart plus 10 scenario-based CA questions answered in writing
Project Planning and Design & Construction Documentation and Administration & Construction Materials and Methods & Grading, Drainage, and Stormwater Management
Complete a timed mixed 100-question mock exam covering all four domains
Log every missed item by domain and root cause (knowledge gap, misread, calculation error)
Re-drill the two weakest domains with targeted problem sets
Consolidate all formulas, slope conversions, and code limits onto a single reference sheet
Rehearse the highest-frequency calculation types under timed conditions
Your checkpoint
Scored mock exam with a completed error log and a one-page personal formula and concept sheet
Milestones
Week 2: Score at least 80% on a self-made 20-question materials, methods, and slope-conversion quiz
Week 4: Complete a 25-question grading and stormwater set at 75% or better, with all calculations shown
Week 6: Produce DD-level drawings and specs for the week 5 concept and pass a self-check against a documentation completeness list
Week 8: Score 75% or higher on the timed 100-question mixed mock with no domain below 65%