LARE study materials
LARE study resources

LARE study plan

LARE · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Construction Materials and Methods

  • Classify 10 given soil samples using USCS and AASHTO criteria from gradation and plasticity data

  • Compute material quantities for a concrete slab, footing, and modular paver area from given dimensions

  • Differentiate rigid versus flexible pavement sections and label every layer with its function

  • Build a 40-term materials and methods glossary covering concrete, asphalt, masonry, metals, and wood

  • Explain how soil bearing capacity and compaction requirements drive footing and pavement design

Your checkpoint

One-page soil classification and quantity takeoff worksheet with 10 worked problems plus a completed 40-term glossary

Week 2

Construction Materials and Methods & Grading, Drainage, and Stormwater Management

  • Convert 15 given values between percent grade, slope ratio, and degrees without reference aids

  • Derive drainage direction and flow paths from a described contour map with a stated contour interval

  • Sketch a retaining wall section showing footing, drainage aggregate, weep holes, and backfill

  • Detail stair, ramp, and site wall construction assemblies with dimensions and material callouts

  • Calculate rise, run, and landing requirements for a given grade change

Your checkpoint

Grading and detailing packet: 15 solved slope conversions, a labeled retaining wall sketch, and a dimensioned stair/ramp detail

Week 3

Grading, Drainage, and Stormwater Management

  • Compute peak runoff for 5 given drainage areas using the Rational Method with correct runoff coefficients

  • Size a vegetated swale using Manning's equation from given slope, vegetation, and design flow

  • Lay out a stormwater management train from source to discharge, labeling each BMP and its purpose

  • Select erosion and sediment control measures for a stated construction sequence

  • Estimate cut and fill volumes for a simple grid of spot elevations

Your checkpoint

One-page stormwater calculation sheet with 5 fully worked problems, including a swale sizing and a cut/fill balance

Week 4

Grading, Drainage, and Stormwater Management & Project Planning and Design

  • Design a grading plan for a described 1-acre site that drains away from all structures at minimum required slopes

  • Verify accessible-route running slope, cross slope, and landings against ADA limits

  • Balance earthwork on a spot-elevation grid and state the net import or export volume

  • Perform a site analysis identifying sun, wind, views, noise, and circulation constraints

  • Translate site constraints into three schematic design alternatives

Your checkpoint

Schematic grading plan with spot elevations, flow arrows, an earthwork balance table, and a one-page site analysis summary

Week 5

Project Planning and Design

  • Write a functional program for a described site, listing spaces, areas, adjacencies, and users

  • Analyze sun and wind exposure and state design responses for each

  • Select plants for three stated site conditions (moist shade, dry full sun, salt exposure) with justification

  • Apply spatial design principles to arrange program elements into a defensible layout

  • Evaluate a layout against circulation, safety, and maintenance criteria

Your checkpoint

Two-page schematic design narrative with an adjacency diagram, a bubble diagram, and a justified planting palette

Week 6

Project Planning and Design & Construction Documentation and Administration

  • Convert a schematic layout into design development drawings with dimensions and materials specified

  • Assemble a drawing index and sheet organization for a small landscape project

  • Identify the purpose and required content of plans, sections, elevations, details, and schedules

  • Draft two CSI-format specification sections with scope, submittals, and execution requirements

  • Match common plan symbols and abbreviations to their meanings

Your checkpoint

Mock plan set table of contents and sheet list plus two drafted specification sections

Week 7

Construction Documentation and Administration

  • Sequence the construction administration process from bidding through final closeout

  • Draft a written response to a given RFI that resolves the field conflict without changing scope

  • Review a submittal and mark it approved, approved as noted, or rejected with reasons

  • Calculate the cost and schedule impact of a given change order

  • Differentiate lump sum, unit price, and cost-plus contract types and their risk allocation

Your checkpoint

Construction administration workflow flowchart plus 10 scenario-based CA questions answered in writing

Week 8

Project Planning and Design & Construction Documentation and Administration & Construction Materials and Methods & Grading, Drainage, and Stormwater Management

  • Complete a timed mixed 100-question mock exam covering all four domains

  • Log every missed item by domain and root cause (knowledge gap, misread, calculation error)

  • Re-drill the two weakest domains with targeted problem sets

  • Consolidate all formulas, slope conversions, and code limits onto a single reference sheet

  • Rehearse the highest-frequency calculation types under timed conditions

Your checkpoint

Scored mock exam with a completed error log and a one-page personal formula and concept sheet

Milestones

Week 2: Score at least 80% on a self-made 20-question materials, methods, and slope-conversion quiz

Week 4: Complete a 25-question grading and stormwater set at 75% or better, with all calculations shown

Week 6: Produce DD-level drawings and specs for the week 5 concept and pass a self-check against a documentation completeness list

Week 8: Score 75% or higher on the timed 100-question mixed mock with no domain below 65%