Lean Silver Certification study materials
Lean Silver Certification study resources

Lean Silver Certification study plan

Lean Silver Certification · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Lean Fundamentals and Principles

  • Define and correctly distinguish the five Lean principles (value, value stream, flow, pull, perfection) using your own words and one workplace example each

  • Classify the eight wastes (TIMWOODS) and identify at least three examples of each from a process you personally know

  • Explain how takt time, cycle time, and lead time differ, and compute each from a small numeric scenario

  • Contrast push versus pull systems and describe how a kanban signal authorizes replenishment

Your checkpoint

A one-page personal glossary of 25 Lean fundamentals terms, each with a one-sentence definition and a real workplace example, self-quizzed to 90% accuracy

Week 2

Lean Fundamentals and Principles & Value Stream Mapping and Analysis

  • Map the seven value-stream mapping steps from product-family selection through future-state design

  • Distinguish current-state from future-state maps and list the data boxes required for each process step (cycle time, changeover, uptime, yield, batch size)

  • Calculate value-added ratio, process cycle efficiency, and total lead time from a simple ten-step map you construct

  • Identify the three flow enablers (takt, continuous flow, supermarket pull) and decide where each applies on your map

Your checkpoint

A hand-drawn current-state value stream map of a real or realistic process with all data boxes filled and a computed process cycle efficiency percentage

Week 3

Value Stream Mapping and Analysis

  • Construct a future-state map from your current-state map, marking kaizen bursts for each gap

  • Apply the eight value-stream mapping questions (takt, finished-goods strategy, flow, supermarket pulls, pacemaker, leveling, increment, improvements) in sequence

  • Draft a value-stream plan with owner, target date, and measurable outcome for each kaizen burst

  • Explain how to select a product family using a product-process matrix or routing analysis

Your checkpoint

A future-state map plus a value-stream plan table with at least six kaizen bursts, each assigned an owner, a metric, and a target date

Week 4

Continuous Improvement and Problem Solving

  • Apply the PDCA cycle to a real problem, writing each phase's inputs and outputs explicitly

  • Complete a structured root-cause analysis using 5 Whys and a fishbone diagram, and verify the root cause with data rather than opinion

  • Distinguish containment, correction, and corrective action, and explain why containment precedes root-cause work

  • Define a SMART problem statement and countermeasure with a measurable target condition

Your checkpoint

A completed A3-style problem-solving document (problem, current condition, root cause, countermeasure, target, follow-up plan) for a real process issue

Week 5

Continuous Improvement and Problem Solving & Lean Leadership and Culture

  • Compare kaizen, kaizen blitz, and daily incremental improvement events by scope, duration, and facilitation needs

  • Explain standard work as the baseline for improvement, including takt, work sequence, and standard in-process stock

  • Describe gemba walks and list the observation behaviors that separate coaching from auditing

  • Explain how leader standard work and visual management sustain gains after an improvement event

Your checkpoint

A standard work sheet for one process (work sequence, takt, standard WIP, key quality points) plus a 15-minute gemba walk observation log with three findings

Week 6

Lean Leadership and Culture

  • Articulate how respect for people and continuous improvement reinforce each other, with concrete leader behaviors for each

  • Design a leader standard work template covering daily, weekly, and monthly routines at one leadership level

  • Explain the role of a daily management tiered huddle structure and what escalates between tiers

  • Identify the cultural failure modes that cause Lean transformations to stall (tool-focused deployment, absent sponsorship, fear of surfacing problems)

Your checkpoint

A leader standard work template and a one-page tiered huddle design (tiers, timing, metrics, escalation rules) for a chosen department

Week 7

Lean Implementation and Deployment

  • Sequence a Lean deployment using value-stream selection, pilot scope, and rollout logic, and justify the order

  • Explain the role of the Lean promotion office, line ownership, and the transition from consultants to internal capability

  • Define leading and lagging deployment metrics and build a balanced scorecard for a pilot value stream

  • Describe how 5S, visual management, and standard work are sequenced relative to flow and pull implementation

Your checkpoint

A 12-month deployment roadmap for one value stream with phased milestones, named owners, and a metric dashboard

Week 8

Lean Fundamentals and Principles & Value Stream Mapping and Analysis & Continuous Improvement and Problem Solving & Lean Leadership and Culture & Lean Implementation and Deployment

  • Reconstruct each domain's core frameworks from memory using blank-page recall, then correct gaps against your notes

  • Complete timed practice sets weighted by domain percentage and review every missed item to root cause

  • Explain the difference between tools and thinking in at least three exam-style scenarios to avoid superficial answers

  • Rehearse the most commonly confused pairs: lead time vs cycle time, push vs pull, correction vs corrective action, leading vs lagging metrics

Your checkpoint

A full-length timed practice exam scored at or above 85%, plus a one-page error log categorizing every miss by domain and cause

Milestones

Week 2: Can name the five Lean principles and eight wastes from memory, and explain takt, cycle, and lead time with worked numbers, without notes

Week 4: Can produce a current-state and future-state map with correct data boxes and a value-stream plan, and can walk through a complete PDCA and root-cause analysis unaided

Week 6: Can explain standard work, gemba coaching, and leader standard work, and has drafted a leader standard work template and huddle design

Week 7: Can justify a deployment sequence and distinguish leading from lagging metrics, and has a completed 12-month roadmap

Week 8: Scores 85% or higher on a full-length timed practice exam with every error logged and root-caused by domain