LEED Process

  • LEED v4 ID+C projects have 110 points available; certification requires 40 points (Certified), 50 (Silver), 60 (Gold), or 80 (Platinum).

  • Minimum project size for ID+C is 250 sq ft (23 m²) of gross floor area within a single building.

  • Prerequisites are mandatory and worth zero points; failing any single prerequisite blocks certification regardless of points earned.

  • The LEED project boundary must capture the entire gross floor area of the interior space being certified; partial or phased areas are registered as separate projects.

  • A Credit Interpretation Request (CIR) is filed through LEED Online when credit requirements are ambiguous for a specific project; the ruling is published and used as precedent.

  • Appeal decisions on review findings proceed in two stages: a preliminary appeal and then a final appeal.

  • Certified projects may pursue recertification; O+M projects recertify annually, while other rating systems recertify on a multi-year cycle.

  • Review documentation is submitted in phases (design and construction), and any credit attempted but undocumented is scored as not achieved.

Quick reference

Integrative Strategies

  • The Integrative Process credit in LEED v4 ID+C is worth 1 point within the 110-point total.

  • Integrated design assembles owner, architect, engineers, contractor, commissioning authority, and facility operators before schematic design.

  • A goal-setting workshop/charrette held in pre-design establishes measurable targets for energy, water, IEQ, and materials while changes are least expensive.

  • Simple box (massing-level) energy modeling occurs before design decisions are locked, comparing orientation, envelope, window-to-wall ratio, and loads.

  • Water systems analysis is performed in parallel with the energy analysis so supply, demand, and reuse strategies are evaluated together.

  • Engaging the commissioning authority during design enables design reviews and prevents late-stage functional performance failures.

  • Integrated analysis commonly right-sizes HVAC and lighting equipment, so first cost can fall while performance improves.

  • Cross-credit synergies to test early: daylighting affects lighting power, cooling load, and IEQ credit compliance simultaneously.

Quick reference

Location and Transportation

  • ID+C Location and Transportation credits cover LEED ND location, surrounding density and diverse uses, access to quality transit, bicycle facilities, reduced parking footprint, and green vehicles.

  • Quality transit walking distances: ¼ mile (400 m) to a bus or BRT stop and ½ mile (800 m) to a rail station.

  • The diverse uses option requires at least 10 diverse uses within ½ mile (800 m) walking distance, drawn from multiple use categories.

  • Bicycle facilities: long-term storage for 5% of regular building occupants and short-term storage for 2.5% of peak visitors, each with a minimum of four spaces.

  • Reduced parking footprint is earned by providing no new parking or by limiting capacity below local zoning minimums or the ITE baseline.

  • A project located in a LEED for Neighborhood Development certified area can earn LT points through the ND location credit path.

  • When transit service is unavailable or insufficient, the surrounding density and diverse uses credit is the alternative location-based path.

Quick reference

Sustainable Sites

  • Construction Activity Pollution Prevention is the Sustainable Sites prerequisite: an erosion and sedimentation control plan meeting the EPA Construction General Permit or stricter local standards.

  • Heat island reduction thresholds: solar reflectance index (SRI) ≥ 78 for low-slope roofs (≤2:12), SRI ≥ 29 for steep-slope roofs, and solar reflectance ≥ 29 for hardscape.

  • Hardscape heat island compliance alternatives include open-grid pavement with ≥50% unbound area, shade from tree canopy or structures, and high-reflectance paving.

  • Light pollution reduction addresses uplight and glare ratings for exterior fixtures and requires reducing or shielding interior lighting after hours.

  • Rainwater management replicates natural site hydrology, managing the 95th percentile rainfall event with green infrastructure and low-impact development.

  • The site assessment credit requires documenting topography, hydrology, climate, vegetation, soils, and human health effects before design decisions.

  • The tenant design and construction guidelines credit requires written guidance and lease language so future fit-outs preserve the building's sustainability measures.

Quick reference

Water Efficiency

  • The Indoor Water Use Reduction prerequisite requires at least 20% aggregate reduction below the calculated baseline for fixtures, fittings, and appliances.

  • EPAct 1992 baseline rates used in LEED calculations: water closets 1.6 gpf, urinals 1.0 gpf, lavatory faucets 2.2 gpm at 60 psi, kitchen faucets 2.2 gpm, showerheads 2.5 gpm at 80 psi.

  • Water use reduction credits tier upward beyond the prerequisite (25%, 30%, 35%, 40% and higher), with points increasing at each tier.

  • Occupant counts used in water calculations must be consistent with those used for the Minimum Indoor Air Quality Performance prerequisite.

  • Cooling tower water use is reduced by increasing cycles of concentration, which cuts blowdown and makeup water demand.

  • Process water (e.g., cooling, equipment, irrigation within the project boundary) is calculated separately from indoor domestic water use.

  • Permanent water metering supports ongoing verification that installed efficiency measures perform as modeled.

Quick reference

Energy and Atmosphere

  • ID+C Energy and Atmosphere prerequisites: Fundamental Commissioning and Verification, Minimum Energy Performance, Building-Level Energy Metering, and Fundamental Refrigerant Management.

  • Minimum Energy Performance compares the proposed design to an ASHRAE 90.1-2010 Appendix G baseline on a cost basis and requires a demonstrated improvement.

  • Optimize Energy Performance awards points for progressively larger percentage improvements; the highest tiers require whole-building energy simulation.

  • Advanced Energy Metering requires permanent meters on all end uses representing 10% or more of annual consumption, with data recorded at hourly or shorter intervals.

  • Fundamental commissioning scope covers HVAC&R, lighting and controls, domestic hot water, and renewable energy systems.

  • Enhanced commissioning requires a commissioning authority independent of design and construction who reviews the OPR and BOD, verifies performance, performs seasonal testing, and delivers a systems manual with training.

  • Fundamental Refrigerant Management prohibits CFC-based refrigerants in new equipment and requires a phase-out plan where existing CFC systems remain.

  • Green power and carbon offsets credits require a multi-year (two-year) purchase contract, with renewable energy certificates meeting recognized certification standards.

Quick reference

Materials and Resources

  • ID+C Materials and Resources prerequisites: Storage and Collection of Recyclables and Construction and Demolition Waste Management Planning.

  • Construction and demolition waste credit tiers: 1 point for 50% diversion and 2 points for 75% diversion from landfill or incineration, counting salvaged and recycled material.

  • Building product disclosure (EPD) option 1 requires at least 20 different permanently installed products from at least 5 different manufacturers with published environmental product declarations.

  • Sourcing of raw materials option 1 requires 20 products from 5 manufacturers with responsible extraction reporting; option 2 rewards leadership extraction (recycled, reused, FSC-certified wood).

  • Material ingredients option 1 requires 20 products from 5 manufacturers with chemical inventory reporting or health product declarations; option 2 rewards optimized ingredient screening.

  • Recycled content is valued as post-consumer content plus half of pre-consumer content, measured as a percentage of total materials cost against 10% and 20% thresholds.

  • Interiors life-cycle impact reduction awards points for reusing existing interior nonstructural elements (walls, floors, ceilings, doors) at 25%, 50%, and 75% thresholds.

  • Recyclable storage must be a dedicated area sized for projected occupant loads and serving paper, corrugated cardboard, glass, plastics, and metals.

Quick reference

Indoor Environmental Quality

  • IEQ prerequisites in ID+C: Minimum Indoor Air Quality Performance (ASHRAE 62.1-2010) and Environmental Tobacco Smoke Control.

  • Enhanced IAQ strategies include increased outdoor air ventilation rates, MERV 13 or better filtration, and exterior entryway systems to capture dirt and pollutants.

  • Low-emitting materials VOC limits: flat paints ≤ 50 g/L, non-flat paints ≤ 150 g/L, with separate limits for adhesives, sealants, flooring, ceilings, insulation, and furniture; composite wood must contain no added urea-formaldehyde.

  • IAQ assessment air concentration limits: formaldehyde 27 ppb, TVOC 500 µg/m³, carbon monoxide 9 ppm, PM10 50 µg/m³.

  • Flush-out alternative to air testing: 14,000 ft³ of outdoor air per ft² of floor area before occupancy, or 3,500 ft³/ft² for a post-occupancy flush-out.

  • Thermal comfort credit requires compliance with ASHRAE 55 and provides monitoring or controls for temperature and humidity.

  • Quality views require a direct line of sight to perimeter vision glazing from 75% of the regularly occupied floor area.

  • Acoustic performance addresses background noise levels, sound transmission class between spaces, and reverberation time in enclosed rooms.

  • Green cleaning requires a written policy, certified cleaning products and equipment, and entryway matting systems.

Quick reference

Innovation

  • The Innovation category totals 6 points in ID+C: up to 5 for innovation/exemplary performance credits plus 1 for a LEED Accredited Professional on the project team.

  • The LEED AP point requires a principal project team member holding the LEED AP credential with the specialty matching the rating system.

  • Exemplary performance is demonstrated by exceeding the highest tier of an existing credit, commonly doubling the threshold or reaching the next increment beyond the maximum.

  • Pilot credits act as alternative compliance paths and can be used to earn Innovation credit within the five-credit cap.

  • Each innovation credit submittal must state the intent, the proposed requirement, the referenced credit or strategy, and the measurable outcome.

  • Green building education is a common innovation credit: publicly visible signage, tours, or outreach explaining the project's strategies and performance.

  • An innovation strategy must be significantly better than an existing requirement; duplicating an existing prerequisite or credit earns no points.

Quick reference

Project Surroundings and Public Outreach

  • Project surroundings performance is captured through LT (density, diverse uses, transit, parking) and SS (light pollution, habitat, rainwater) credits rather than a separate category.

  • Community connectivity is measured by proximity from the main entrance to community resources and services via safe pedestrian routes.

  • Public outreach is typically satisfied through the innovation credit for green building education: signage, tours, websites, or published performance data.

  • Tenant engagement is delivered through design and construction guidelines and lease language that bind future tenants and their contractors to sustainability requirements.

  • Impacts on neighbors are managed through light trespass and glare limits, construction activity pollution prevention, and noise control measures.

  • Stakeholder participation during the goal-setting charrette documents community and occupant priorities that shape credit selection.

  • Construction Activity Pollution Prevention protects adjacent properties and receiving waters by controlling erosion, sedimentation, and dust during the fit-out.