ATPL Flight Performance and Planning study materials
ATPL Flight Performance and Planning study resources

ATPL Flight Performance and Planning cheat sheet

ATPL Flight Performance and Planning · Keep the key ideas within reach.

Quick reference

Performance - Take-off

  • TORA is the length of runway declared available and suitable for the ground run of an aeroplane taking off; TODA = TORA plus clearway (clearway max 50% of TORA, no obstacles, not counted as ground run).

  • ASDA = TORA plus stopway; the stopway must be at least as wide as the runway and capable of supporting the aeroplane without structural damage.

  • Screen height at the end of TODA: 35 ft for CS-25/FAR-25 aeroplanes, 50 ft for CS-23/FAR-23 (commuter category) aeroplanes; V2 must be reached by 35 ft (CS-25).

  • Balanced field length: the TORR cleared in an all-engines-operating take-off equals the ASDR in the one-engine-inoperative case; achieved by the balanced V1.

  • V1 is the decision speed: before V1 an engine failure allows a stop within ASDA; at or after V1 the take-off can be continued to 35 ft within TODA. V1 must lie between VMCG and VR.

  • VMCG is the minimum control speed on the ground with the critical engine failed and the aeroplane on the ground; VMCA is the minimum control speed in the air; VMCL is the minimum control speed in the landing configuration.

  • Take-off mass limits: MTOM structural, MTOW performance-limited (field length, obstacle, climb, tyre speed, brake energy); the lowest of these governs.

  • Runway slope, wind, temperature, pressure and runway surface condition (dry, wet, contaminated) must be applied to AFM take-off data; wet runway increases the accelerate-stop distance and reduces V1.

Quick reference

Performance - Climb

  • CS-25 climb segments: take-off (first segment) 0.5% for two-engine, 0.3% for three-engine, 0.3% for four-engine at V2, gear down, take-off flaps.

  • Second segment: 2.4% two-engine, 2.7% three-engine, 3.0% four-engine; gear up, take-off flaps, V2, at 35 ft screen height.

  • Third (transition) segment: flaps retracted, speed V2 to VFTO, 35 ft to 400 ft; no percentage gradient requirement but the aeroplane must maintain a positive climb.

  • Fourth (final take-off) segment: 1.2% two-engine, 1.5% three-engine, 1.7% four-engine; flaps up, VFTO, 400 ft to 1500 ft.

  • En-route climb (CS-25.123): one-engine-inoperative gradient 1.1% two-engine, 1.4% three-engine, 1.6% four-engine, at 1500 ft above the aerodrome and at the planned cruise altitude.

  • Landing climb: 3.2% two-engine, 3.4% three-engine, 3.6% four-engine with all engines operating; 2.1%, 2.2%, 2.3% respectively with one engine inoperative; approach flaps, gear down.

  • Climb gradient (%) = 100 × (thrust − drag) / weight; rate of climb (ft/min) = gradient (%) × TAS (kt) × 101.3 / 60 approximately, or ROC = 60 × TAS × gradient / 100.

  • Climb speed: VY (best rate) is lower than VX (best angle); for obstacle clearance use VX, for fastest height gain use VY; VX increases with altitude and equals VY at absolute ceiling.

Quick reference

Performance - Landing

  • LDA is TORA minus the displaced threshold; the landing distance available must not be less than the landing distance required (LDR).

  • Certification landing distance (CS-25) is from 50 ft above the threshold to a full stop; the actual landing distance must be multiplied by 1.67 (dry) or 1.92 (wet) for operational planning, or per operator's approved factor.

  • Wet runway: the required landing distance increases by approximately 15% and reverse thrust credit is limited; contaminated runways require the AFM contaminated landing data.

  • Landing mass limit: MLW structural and performance-limited; approach climb gradient (2.1% for two-engine) and landing climb gradient (3.2%) must be satisfied at the destination and alternate.

  • Autobrake settings affect the stopping distance and brake energy; MAX autobrake is limited by brake energy and tyre speed, not just runway length.

  • Runway slope on landing: 2% uphill reduces LDR; downhill increases it; published landing distances are for level runway unless stated.

  • Reverse thrust is not credited in the certified landing distance but may be credited in some operational calculations; the aircraft must be able to stop without reverse thrust.

  • Displaced threshold reduces LDA but not TORA; landing distance is measured from the threshold, so a displaced threshold reduces the usable landing length.

Quick reference

Performance - En-route and Other Flight Phases

  • Obstacle clearance in the take-off flight path: net take-off flight path (gross minus 0.8% for two-engine, 0.9% for three-engine, 1.0% for four-engine) must clear all obstacles by 35 ft vertically or 90 m horizontally.

  • En-route obstacle clearance: the net en-route flight path (gross minus 1.1% two-engine, 1.4% three-engine, 1.6% four-engine) must clear all obstacles by 1000 ft in the en-route phase.

  • Contaminated runway: use AFM data for slush, snow, ice, standing water; braking action is reported as good, medium, poor or nil; nil braking action requires a landing at an alternate unless certified.

  • Contaminated runway take-off: reduced V1 and increased accelerate-stop distance; the take-off must be rejected if the braking action deteriorates below the AFM limit.

  • Driftdown: with one engine inoperative the aeroplane descends to the single-engine service ceiling; the driftdown net flight path must clear obstacles by 1000 ft.

  • ETOPS/EDTO: the en-route alternate must be within the approved diversion time at one-engine-inoperative cruise speed; fuel must cover diversion plus 15% hold at 1500 ft.

  • The one-engine-inoperative net flight path must clear obstacles by 1000 ft in the en-route phase; the gross gradient minus the 1.1% (two-engine) net factor gives the net path.

  • Take-off obstacle clearance: the net take-off flight path must clear obstacles by 35 ft vertically or 90 m horizontally; if not, reduce mass or use improved climb.

Quick reference

Mass and Balance - Principles and Limitations

  • MTOM is the maximum certificated take-off mass; MLM is the maximum landing mass; MZFM is the maximum zero-fuel mass; these are structural limits.

  • Zero fuel mass = dry operating mass + traffic load; it must not exceed MZFM. Take-off mass = ZFM + take-off fuel.

  • Dry operating mass (DOM) = basic empty mass + crew + crew baggage + catering + potable water; it excludes traffic load and usable fuel.

  • Maximum zero fuel mass = MTOM minus the fuel needed for the flight to the destination plus reserves; MZFM is the limit on the payload plus DOM.

  • Centre of gravity limits: forward CG limit is set by elevator authority and landing flare; aft CG limit is set by stability and stall recovery.

  • CG position (%MAC) = (CG arm − LE MAC arm) / MAC length × 100; MAC is the mean aerodynamic chord.

  • Load sheet: the CG must lie within the certified envelope for take-off, in-flight and landing; fuel burn moves the CG as fuel is consumed.

  • Maximum floor loading and maximum running load (kg per metre) must not be exceeded; the load must be distributed to keep the CG within limits.

Quick reference

Mass and Balance - Calculations and Load Sheets

  • Moment = mass × arm; total moment = sum of individual moments; CG arm = total moment / total mass.

  • CG shift = (mass moved × distance moved) / total mass; moving mass aft moves the CG aft by that amount.

  • Adding or removing mass: new CG = (old total moment ± added mass × its arm) / (old total mass ± added mass).

  • Index method: index = (moment / constant) + constant; the load sheet uses index units to simplify CG calculation.

  • Load sheet contains: DOM, traffic load, take-off fuel, trip fuel, taxi fuel, ZFM, TOM, LM, CG position, and the trim setting.

  • Fuel density: kerosene 0.78–0.81 kg/L (typical 0.80); AVGAS 100LL approximately 0.72 kg/L; density varies with temperature.

  • Underload = allowed mass − actual mass; the limiting mass (MTOM, MLM, MZFM) determines the maximum payload.

  • Take-off CG must be within the take-off envelope; landing CG must be within the landing envelope; the most restrictive condition governs the fuel/payload distribution.

Quick reference

Flight Planning - Fuel Planning and Reserves

  • Trip fuel: fuel from take-off to landing at the destination; includes climb, cruise, descent and approach.

  • Contingency fuel: 5% of trip fuel, or 3% with an en-route alternate, or 20 minutes holding at 1500 ft, or a statistical method (operator-approved).

  • Alternate fuel: fuel from the destination to the alternate, including missed approach, climb, cruise, descent and approach.

  • Final reserve: 30 minutes holding at 1500 ft above the alternate in ISA conditions; for turbine aeroplanes this is the minimum final reserve.

  • Additional fuel: fuel for the case where the destination and alternate are unavailable; must allow 15 minutes holding at 1500 ft.

  • Taxi fuel: fuel for APU, taxi-out and taxi-in; it is not part of trip fuel but is included in block fuel.

  • Block fuel = taxi fuel + trip fuel + contingency fuel + alternate fuel + final reserve + additional fuel + extra fuel.

  • Fuel density and temperature: fuel mass = volume × density; density decreases with temperature, so the same volume gives less mass at high temperature.

Quick reference

Flight Planning - Route, Alternate and Contingency Planning

  • Destination alternate: required unless the destination has an approved instrument approach and the weather forecast allows a visual approach and landing.

  • Weather minima for the destination alternate: ceiling and visibility must be at or above the alternate minima; the alternate must be within the fuel range.

  • En-route alternate: used for ETOPS/EDTO and for contingency fuel; must be within the diversion time at one-engine-inoperative cruise speed.

  • Contingency planning: the pilot must plan for a diversion to an en-route alternate if the destination becomes unavailable; fuel must cover the diversion.

  • Route planning: the great circle route is the shortest distance; the rhumb line is a constant heading; wind and temperature affect the optimum route.

  • Equal time point (ETP): the point where the time to the destination equals the time to the alternate; used for diversion planning.

  • Point of no return (PNR): the point beyond which the aeroplane cannot return to the departure aerodrome with the remaining fuel.

  • Alternate minima: the alternate must be forecast to be at or above the published minima for the expected approach; if not, a second alternate is required.

Quick reference

Flight Planning - Computer Flight Plans and Operational Flight Plan

  • Computer flight plan (CFP) contains: route, waypoints, tracks, distances, winds, temperatures, cruise levels, fuel, times and masses.

  • The operational flight plan (OFP) is the document signed by the commander; it includes the CFP, fuel plan, load sheet and the commander's acceptance.

  • CFP fuel figures must be checked against the manual/performance calculation; the commander is responsible for the final fuel decision.

  • Aircraft performance in the CFP is based on the AFM; the operator's approved performance software must be used for the final figures.

  • The OFP must include the take-off and landing mass, the fuel figures, the route, the alternates and the commander's signature.

  • CFP winds and temperatures are forecast values; the actual fuel burn may differ, so in-flight monitoring is required.

  • The CFP must be checked for gross errors: route, waypoints, fuel, masses and times; a cross-check against the manual plan is good practice.

  • OFP documents must be retained for the operator's record-keeping period; the commander signs to confirm the plan is acceptable.

Quick reference

Flight Monitoring - In-flight Replanning and Fuel Monitoring

  • Fuel monitoring: compare actual fuel remaining with the planned fuel at each waypoint; a negative trend requires a decision to replan or divert.

  • In-flight replanning: recalculate the fuel required to the destination and alternate; if the remaining fuel is insufficient, divert to an en-route alternate.

  • The minimum fuel at destination is the final reserve plus alternate fuel; if the remaining fuel falls below this, declare a fuel emergency.

  • Fuel jettison: if the landing mass exceeds MLM, jettison fuel to reduce to MLM; the jettison must be completed before landing.

  • The commander must monitor fuel against the flight plan; a significant deviation (e.g. more than 5%) requires a re-check of the plan.

  • In-flight replanning must consider the actual winds, temperatures and aircraft performance; the new plan must be checked against the fuel remaining.

  • Fuel emergency: declare MAYDAY FUEL when the fuel remaining is below the final reserve; the aircraft must land at the nearest suitable aerodrome.

  • The OFP must be updated in flight with actual fuel and time; the commander signs the amended plan if required by the operator.