ATPL Flight Performance and Planning study materials
ATPL Flight Performance and Planning study resources

ATPL Flight Performance and Planning flashcards

ATPL Flight Performance and Planning · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

TORA
Take-off run available: the length of runway declared available and suitable for the ground run of an aeroplane taking off, measured from the start of the take-off run to the end of the runway.
TODA
Take-off distance available: TORA plus clearway, where the clearway is an area free of obstacles at least 90 m wide and not more than half the TORA.
ASDA
Accelerate-stop distance available: TORA plus stopway, where the stopway is at least as wide as the runway and able to support the aeroplane without structural damage.
Balanced field length
The runway length at which the all-engines take-off distance equals the one-engine-inoperative accelerate-stop distance, achieved at the balanced V1.
V1
The decision speed: before V1 an engine failure allows a stop within ASDA; at or after V1 the take-off can be continued to 35 ft within TODA.
Second segment gradient
The climb gradient required with gear up, take-off flaps and V2 at 35 ft: 2.4% for two-engine, 2.7% for three-engine and 3.0% for four-engine aeroplanes.
Net take-off flight path
The gross take-off flight path reduced by 0.8% for two-engine, 0.9% for three-engine and 1.0% for four-engine aeroplanes, used for obstacle clearance.
VX and VY
VX is the speed for the best angle of climb, used for obstacle clearance; VY is the speed for the best rate of climb, used for the fastest height gain.
En-route climb gradient
The one-engine-inoperative gradient required at 1500 ft above the aerodrome and at cruise altitude: 1.1% two-engine, 1.4% three-engine and 1.6% four-engine.
Landing climb gradient
The all-engines gradient required with approach flaps and gear down: 3.2% two-engine, 3.4% three-engine and 3.6% four-engine aeroplanes.
LDA
Landing distance available: the length of runway available for the landing ground run, measured from the threshold to the end of the runway, reduced by a displaced threshold.
Wet landing factor
The operational landing distance on a wet runway is approximately 1.15 times the dry distance; the certification distance is multiplied by 1.67 (dry) or 1.92 (wet).
Displaced threshold
A threshold located at a point other than the beginning of the runway; it reduces the LDA but not the TORA, since the take-off run may still use the full length.
Contaminated runway
A runway covered by standing water, slush, snow or ice; AFM contaminated data must be used, and braking action is reported as good, medium, poor or nil.
Driftdown
The descent with one engine inoperative to the single-engine service ceiling; the net driftdown path must clear all obstacles by 1000 ft.
Take-off obstacle clearance
The net take-off flight path must clear all obstacles by 35 ft vertically or 90 m horizontally; if not, reduce mass or use improved climb.
MZFM
Maximum zero fuel mass: the maximum mass of the aeroplane without usable fuel; it limits the payload plus dry operating mass and is a structural limit.
Dry operating mass
Basic empty mass plus crew, crew baggage, catering and potable water; it excludes traffic load and usable fuel and is the basis for the zero fuel mass.
CG shift formula
The CG shift equals the mass moved multiplied by the distance moved, divided by the total mass; moving mass aft moves the CG aft by that amount.
Index method
A load sheet method where the moment is divided by a constant and a constant is added, giving index units that simplify the CG calculation and trim setting.
Underload
The difference between the allowed mass (the lowest of MTOM, MLM and MZFM) and the actual mass; it determines the maximum additional payload that can be carried.
Contingency fuel
Fuel equal to 5% of trip fuel, or 3% with an en-route alternate, or 20 minutes holding at 1500 ft, or a statistical method approved by the operator.
Final reserve fuel
Fuel for 30 minutes holding at 1500 ft above the alternate in ISA conditions; it is the minimum fuel that must remain at the destination.
Block fuel
Taxi fuel plus trip fuel plus contingency fuel plus alternate fuel plus final reserve plus additional fuel plus extra fuel; it is the total fuel on board at start-up.
Destination alternate
An aerodrome to which an aircraft may proceed if a landing at the destination is not possible; it must be within the fuel range and forecast above its minima.
Equal time point
The point on the route where the time to the destination equals the time to the alternate, used to decide the diversion aerodrome in flight.
Point of no return
The point beyond which the aeroplane cannot return to the departure aerodrome with the remaining fuel; it is calculated from the fuel available and the wind.
Operational flight plan
The document signed by the commander containing the route, fuel plan, masses, alternates and times; the commander is responsible for accepting it.
Computer flight plan
A plan produced by the operator's software containing route, waypoints, tracks, distances, winds, temperatures, cruise levels, fuel, times and masses.
OFP cross-check
The manual check of the computer flight plan for gross errors in route, waypoints, fuel, masses and times before the commander signs the plan.
Fuel monitoring
The comparison of actual fuel remaining with the planned fuel at each waypoint; a negative trend requires a decision to replan or divert.
MAYDAY FUEL
The distress call declared when the fuel remaining is below the final reserve; the aircraft must land at the nearest suitable aerodrome.