Sri Lanka Licensed Surveyor Exam study materials
Sri Lanka Licensed Surveyor Exam study resources

Sri Lanka Licensed Surveyor Exam cheat sheet

Sri Lanka Licensed Surveyor Exam · Keep the key ideas within reach.

Quick reference

Cadastral Surveying and Land Parcel Definition

  • A parcel is the closed area bounded by legally recognized lines; the deed area is evidence of quantity, not proof of boundary location.

  • Boundary evidence priority in cadastral reconstruction is original corner monuments and natural features, then original survey measurements, then later record measurements, then area.

  • Coordinate area: A = ½ |Σ(x_i y_{i+1} − x_{i+1} y_i)|, with the traverse closed and coordinates in one consistent grid.

  • Sri Lankan cadastral plans identify lot or parcel number, boundary marks, adjoining parcels, and state or private tenure; the plan and field notes form the survey record.

  • Corner mark types include concrete posts, iron pins, rock pegs, and natural features; the mark type and condition are recorded because they carry boundary weight.

  • When deed area conflicts with an identified original monument, the monument controls and the area is recomputed geometrically from the boundary.

  • Parcel identifiers must be unique within the land registry or cadastral coverage and stable across re-surveys; splitting a parcel creates new identifiers and retires the parent.

  • A cadastral survey closes on control of stated order; misclosure is checked against the applicable specification before coordinates are accepted.

Quick reference

Geodesy

  • Geodetic coordinates (φ, λ, h) refer to an ellipsoid; orthometric height H = h − N, where N is geoid separation.

  • The geoid is an equipotential surface approximating mean sea level; it is not an ellipsoid and varies with mass distribution.

  • Deflection of the vertical is the angle between the ellipsoid normal and the gravity vertical; it affects astronomical azimuth and zenith observations.

  • Slope distance S reduces to horizontal distance D = S cos θ for vertical angle θ; sea-level reduction applies D0 = D(R/(R+H)).

  • Geodetic azimuth differs from grid azimuth by convergence γ; grid azimuth = geodetic azimuth − γ for the usual convention.

  • A geocentric datum defines the ellipsoid position relative to Earth's centre; a local datum fixes it to a regional origin.

  • Sri Lanka's legacy Kandawala datum uses the Everest 1830 ellipsoid; modern GNSS work uses geocentric SLD99 or ITRF-compatible coordinates.

  • The combined curvature and refraction correction for a sight line is approximately 0.067 D², with D in kilometres and the result in metres.

Quick reference

Geodetic Datums and Coordinate Systems

  • UTM zone 44N covers 78°E–84°E, with central meridian 81°E, false easting 500,000 m, false northing 0, and scale factor 0.9996; Sri Lanka lies within it.

  • Transverse Mercator grid coordinates have a point scale factor that increases with distance from the central meridian; ground distances require the combined scale factor.

  • Combined scale factor = grid scale factor × elevation factor; grid distance = ground distance × combined scale factor.

  • Grid convergence γ ≈ Δλ sin φ; it rotates grid north relative to true north and is used in azimuth reductions.

  • A 7-parameter Helmert transformation uses three translations, three rotations, and a scale factor to convert between geocentric datums.

  • Kandawala coordinates must be transformed, not merely relabelled, before use with SLD99 or WGS84 coordinates.

  • Geoid models convert GNSS ellipsoidal heights to orthometric heights; using h as H without a geoid model causes metre-level errors.

  • Record the datum, projection, epoch, and coordinate order for every coordinate set; easting/northing order is not universal.

Quick reference

Survey Computations

  • Latitude = D cos α and departure = D sin α for distance D and azimuth α measured from north.

  • Inverse: D = √(ΔE² + ΔN²); azimuth α = atan2(ΔE, ΔN), normalized to 0°–360°.

  • Traverse closure: Σ latitudes and Σ departures should be zero for a closed loop; residual components give linear misclosure.

  • Linear misclosure ratio = total misclosure / perimeter; it is expressed as 1:N and compared with the specification.

  • Area by coordinates uses the shoelace sum; a clockwise list gives negative signed area in the usual convention, so take absolute value.

  • Leveling rise or fall: rise = backsight − foresight; reduced level = previous RL + rise or − fall.

  • Coordinate transformation: [E;N] = [a −b; b a][x;y] + [tE;tN] for a 2D similarity with scale and rotation.

  • Rounding is applied only at final presentation; intermediate computations retain extra digits to avoid misclosure artifacts.

Quick reference

Traverse and Least-Squares Adjustment

  • Bowditch (compass) rule distributes latitude and departure misclosure in proportion to leg length; transit rule distributes in proportion to absolute latitude or departure.

  • Angular misclosure = observed sum − theoretical sum; for an n-sided polygon the theoretical sum is (n−2)180°.

  • Least-squares observation model: L + V = AX; minimize VᵀPV, giving normal equations AᵀPA X = AᵀPL.

  • A posteriori variance factor σ̂² = VᵀPV / (n−u), with n observations and u unknown parameters; it tests adjustment consistency.

  • Redundancy number r = n − u; without redundancy, residuals cannot detect observational error.

  • Standardized residual = v_i / (σ_i √r_i); large values flag possible outliers or blunders.

  • Precision describes repeatability; accuracy describes closeness to truth; a precise traverse can still be systematically biased.

  • Constrained adjustment fixes known control; free adjustment estimates inner geometry; both report coordinate covariance.

Quick reference

Land Law

  • Registration of Title Act No. 21 of 1998 makes the title register primary evidence; registration confers title subject to statutory exceptions and fraud provisions.

  • Deed registration records a transaction; title registration validates ownership and the parcel on the register.

  • Prescription Ordinance No. 22 of 1871 governs acquisitive prescription; the common statutory period for land is ten years, subject to legal conditions.

  • State Lands Ordinance No. 8 of 1947 and Land Development Ordinance No. 19 of 1935 govern state land disposal, permits, and reservations.

  • Partition Law No. 21 of 1977 governs partition actions and requires survey and valuation evidence for co-owned land.

  • Land Acquisition Act No. 9 of 1950 governs compulsory acquisition; survey plans identify the land to be acquired and affected interests.

  • Notaries attest deeds and certify identity and capacity; registration alone does not cure a defective instrument.

  • Bim Saviya implements systematic title registration; parcel maps and register records are linked by unique parcel identifiers.

Quick reference

Survey Statute and Boundary Law

  • Survey Act No. 17 of 2002 provides for the Surveyor General, licensed surveyors, survey standards, and the legal authority for cadastral surveys.

  • A licensed surveyor's plan is a legal document; false or misleading survey returns attract professional and statutory consequences.

  • Boundary marks are legal evidence; unauthorized removal or damage to survey marks is an offence under survey law.

  • Fixed boundaries are located by survey monuments and coordinates; general boundaries are indicated by physical features and are not fixed by measurement alone.

  • Original survey evidence prevails over later resurvey measurements when the later survey does not identify the original monument.

  • Where a boundary follows a water body, the legal water-boundary rule and the identified high-water mark or bank control the line.

  • A plan discrepancy is resolved by field evidence and the record hierarchy; changing a coordinate without a survey basis is not a boundary correction.

  • Easements and rights of way are interests that may appear on title but are not necessarily parcel boundary lines.

Quick reference

GNSS Positioning and Modern Survey Technology

  • GNSS positioning uses pseudorange for code solutions and carrier phase for centimetre-level relative solutions.

  • Fixed integer ambiguities give the highest-accuracy RTK solution; float solutions are less precise and must be labelled.

  • PDOP measures satellite geometry quality; lower values indicate stronger geometry, while high PDOP increases position uncertainty.

  • Static relative positioning over longer sessions improves accuracy by averaging multipath and atmospheric error.

  • RTK or VRS corrections require a fixed reference network; the rover's link and coordinate datum must match the correction source.

  • GNSS gives ellipsoidal height; orthometric height requires a geoid model: H = h − N.

  • Multipath occurs when signals reflect from nearby surfaces; it is reduced by choke-ring antennas, good sky view, and appropriate observation times.

  • A GNSS-derived coordinate is not automatically on the national grid; transformation to SLD99 or Kandawala and projection to grid are separate steps.

Quick reference

Engineering and Construction Surveying

  • Setting out transfers design coordinates to ground; the surveyor establishes control, computes setting-out data, and verifies as-built positions.

  • Grade = vertical rise / horizontal run; express as percentage or ratio and apply with the design alignment.

  • Cut or fill = design level − existing ground level; positive values indicate fill and negative values indicate cut under the usual convention.

  • Horizontal curve elements: tangent T = R tan(Δ/2), length L = RΔ with Δ in radians, and external E = R(sec(Δ/2) − 1).

  • Vertical curve K = L/A, where L is curve length and A is the algebraic grade change in percent; K gives the rate of grade change.

  • Deformation monitoring requires stable reference points outside the zone of movement and repeat observations with comparable precision.

  • Tunnel breakthrough accuracy depends on a common control network and regular transfer of azimuth and coordinates through the tunnel.

  • As-built surveys compare constructed works with design; deviations are reported in the project coordinate system and datum.

Quick reference

Topographic Surveying

  • Contour interval is chosen from map scale, relief, and intended use; a smaller interval shows more detail but increases clutter and survey cost.

  • Contours never cross except at overhanging features; closed contours indicate hills or depressions, with hachures or labels distinguishing them.

  • A TIN represents terrain by irregular triangles; breaklines constrain triangle edges along ridges, channels, and embankments.

  • Spot heights and mass points supplement contours where relief is flat or features are critical.

  • Topographic feature codes provide consistent attribution; the same code should identify the same feature class across survey sheets.

  • DEM is a bare-earth elevation model; DSM includes vegetation and structures; DTM is often used for a terrain model with breaklines.

  • Positional accuracy is tested against higher-order control or checkpoints; contour accuracy is not identical to horizontal map accuracy.

  • Cross sections and profiles are derived from the same terrain model and must state datum, scale, and vertical exaggeration.

Quick reference

Mapping and Cartography

  • Map scale is the ratio of map distance to ground distance; a 1:10,000 map has 1 cm representing 100 m.

  • Generalization simplifies, displaces, merges, and exaggerates features to keep a map legible at scale; it changes geometric detail.

  • Grid north, true north, and magnetic north differ; magnetic declination changes with location and time and must be dated.

  • Map projection preserves chosen properties: conformality preserves angles, equivalence preserves area, equidistance preserves selected distances.

  • Cartographic symbolization uses colour, size, shape, and texture; classification breaks must be explicit in the legend.

  • Positional accuracy standards state the tested RMSE or confidence level; a map's scale alone does not guarantee its accuracy.

  • A map series requires consistent sheet lines, scale, datum, projection, and edge-matching across adjacent sheets.

  • Vector data stores features as points, lines, and polygons; raster data stores continuous values in a cell grid.

Quick reference

Photogrammetry, Remote Sensing and LiDAR

  • GSD = pixel size × flying height / focal length; it defines the ground footprint of one image pixel.

  • Photogrammetric overlap is typically about 60% forward and 20–30% sidelap; adequate overlap is required for stereo and matching.

  • Bundle adjustment jointly estimates camera poses, ground coordinates, and calibration using tie points and control.

  • An orthophoto is geometrically corrected for terrain and camera tilt; it is not a perspective photograph.

  • LiDAR measures range from pulse travel time; multiple returns can separate canopy, structures, and ground.

  • LiDAR point density is pulses or points per square metre; ground classification is required before a bare-earth DEM.

  • NDVI = (NIR − Red)/(NIR + Red); it indicates vegetation vigour and density from multispectral imagery.

  • Remote-sensing accuracy is reported with error matrices, overall accuracy, and kappa or class-specific measures.

Quick reference

Land Administration, Title Registration and Land Information Systems

  • A cadastre records parcels, boundaries, and rights for taxation and land management; a land registry records ownership and transactions.

  • A parcel identifier is the key linking cadastral map, register, and title; it must be unique and persistent.

  • Title registration records the state's guarantee of title; the register and cadastral parcel map must remain spatially consistent.

  • LADM (ISO 19152) is a land administration domain model covering parties, rights, responsibilities, restrictions, and spatial units.

  • Land tenure types include freehold, leasehold, permit, and license; each carries different transferability and security.

  • State land is managed under statutory reservation and disposal rules; alienation requires the legally prescribed process.

  • LIS data quality dimensions include completeness, positional accuracy, attribute accuracy, logical consistency, and temporal currency.

  • Land information access must balance transparency with personal data protection and statutory confidentiality.

Quick reference

Professional Practice, Ethics and Survey Office Management

  • A licensed surveyor must practise within competence and decline work where the required expertise or resources are absent.

  • Conflict of interest must be disclosed and managed; a surveyor should not certify work where a personal or financial interest affects judgment.

  • Professional negligence is a failure to exercise the standard of care of a reasonably competent surveyor, causing loss.

  • Survey records, field notes, and computations are professional evidence and should be retained under the applicable retention policy.

  • Quality control includes independent checks, calibration records, control verification, and documented review before plan issue.

  • A survey contract should define scope, datum, accuracy standard, deliverables, payment, and liability terms.

  • Confidential client and land data must be protected from unauthorized access, alteration, or disclosure.

  • Expert evidence must be independent, technically supported, and confined to the witness's expertise.

Quick reference

Hydrographic and Special-Purpose Surveys

  • Chart datum is a low-water reference for charted depths; soundings are reduced to it so that most depths are positive.

  • Reduced depth = observed depth from transducer + transducer draft + tide height above chart datum, with sign conventions stated.

  • IHO S-44 defines hydrographic survey orders by intended use, depth, and required accuracy; order selection drives equipment and line spacing.

  • Multibeam echosounders produce swath bathymetry with beam angle and coverage; calibration and sound-velocity profiles are required.

  • Side-scan sonar images seabed texture and targets; it does not directly give accurate depth without ancillary data.

  • Tide observations and a local tide model are needed to reduce soundings; GNSS ellipsoidal heights require a separation model to chart datum.

  • Dredging volumes are computed between pre- and post-dredge surfaces in a common vertical datum.

  • Hydrographic positions require a horizontal datum and time-tagged positioning; latency between position and depth must be corrected.