SLIA Part II
The second stage of Sierra Leone Institute of Architects professional qualification, normally taken after Part I academic award and a recorded period of practical experience, leading to Part III.
Architect's seal
The registered architect's stamp on drawings certifying professional responsibility. Only architects registered with SLIA may seal drawings for statutory approval.
Planning permission
Statutory consent from the local planning authority to develop land. It must be obtained before building-plan approval and before construction begins.
Building plan approval
Technical vetting of submitted drawings for compliance with building regulations, including structure, fire, sanitation and means of escape, prior to construction.
Gross internal floor area
Total floor area measured to the internal face of external walls, including internal partitions and circulation, used for cost planning and planning metrics.
Plot ratio
Gross floor area divided by site area. It controls development density and is capped by zoning regulations, so check local limits before design freeze.
Site coverage
Building footprint area divided by total site area, expressed as a percentage. It limits how much of the plot may be built on.
Set-back
The minimum distance required between a building and the plot boundary or street. It governs daylight, privacy and fire separation and is set by planning rules.
Plan of work stages
The staged sequence from briefing through concept, developed and technical design, tender, construction and handover, used to define scope and fee at each appointment.
Fee percentage method
Architect's fee expressed as a percentage of construction cost, varying inversely with project size and complexity; small bespoke projects attract higher percentages.
Lump-sum contract
A contract where the contractor agrees a fixed price for defined work. Variations and provisional sums adjust the price; risk of quantity error sits largely with the contractor.
Remeasurement contract
A contract where work is paid for on measured quantities actually executed, so the contractor is reimbursed for actual quantities rather than a fixed sum.
Contract administrator
The architect's role issuing instructions, certifying payment and completion, valuing variations and determining extensions of time fairly between employer and contractor.
Interim certificate
A periodic certificate issued by the contract administrator stating the amount due to the contractor at that stage, based on inspected and measured work.
Practical completion
The stage at which the works are complete enough for the employer to take beneficial occupation, triggering the defects liability period and release of retention.
Retention
A percentage withheld from each payment and released after practical completion and the defects period, securing the employer against uncorrected defects.
Variation instruction
A written instruction changing the works, valued by the contract administrator using contract rates or fair valuation, and confirmed in writing to avoid dispute.
Extension of time
An award of additional time for completion due to excusable delay, determined by the contract administrator, protecting the contractor from liquidated damages.
Liquidated damages
A pre-agreed sum per period of delay deducted from the contractor for late completion, enforceable only if a genuine pre-estimate of loss.
Professional indemnity insurance
Insurance covering the architect against claims of professional negligence, usually required by appointment terms and maintained for the limitation period.
Limitation of liability
A clause in the appointment capping the architect's financial exposure to a stated sum or multiple of fees, agreed in writing before work starts.
Copyright in drawings
Ownership of the design and drawings remains with the architect unless assigned in writing; the client normally receives a licence to use them for the project.
Appointment agreement
The written contract between client and architect setting out scope, fee, programme, responsibilities and liability limits; oral appointments create evidential risk.
Named subcontractor
A subcontractor selected by the employer or architect and named in the main contract, for whom the main contractor's responsibility is limited by the contract terms.
Nominated subcontractor
A subcontractor chosen by the employer and instructed into the main contract, historically creating divided responsibility for delay and defects.
Design responsibility
Allocation of who is answerable for design errors. In design-and-build contracts the contractor assumes design liability, altering the architect's role and risk.
Means of escape
Protected routes from any point in a building to a place of safety, with limits on travel distance and door widths set by fire regulations.
Travel distance
The maximum permitted distance from a point in a building to the nearest exit, set by fire regulations and reduced for higher-risk or single-stair buildings.
Site inspection duty
The architect must make regular inspections sufficient to certify work; certifying without inspection is a recognised ground for professional negligence claims.
Record drawings
As-built drawings updated to reflect constructed work, issued at handover and retained with project records for the limitation period.
Defects liability period
A stated period after practical completion during which the contractor must return and rectify notified defects at no cost to the employer.
Provisional sum
An allowance in the contract for work not yet defined, later adjusted to actual cost; its use signals incomplete design at tender.
Building information modelling
Digital model-based production of coordinated design and construction information, improving clash detection and quantity extraction across the plan-of-work stages.