SLIA Part II study materials
SLIA Part II study resources

SLIA Part II key terms

SLIA Part II · Get comfortable with the vocabulary.

Building Bye-laws

Local regulations governing construction, including setbacks, height limits, plot coverage, ventilation and fire safety. In Sri Lanka these are administered by local authorities, and compliance is a precondition for plan approval and occupancy certification.

Related: Development Permit, Certificate of Conformity, Setback
Development Permit

Formal authorisation from a planning or local authority allowing a specific development on a site. It fixes the approved use, density, and built form, and any material deviation from the approved drawings requires fresh approval.

Related: Building Bye-laws, Certificate of Conformity
Certificate of Conformity

Document issued by the local authority confirming that a completed building matches the approved plans and complies with applicable regulations, allowing lawful occupation and utility connections.

Related: Development Permit, Building Bye-laws, Practical Completion
Setback

The minimum horizontal distance required between a building line and the plot boundary. Setbacks control light, ventilation, privacy and fire access, and are usually measured to the outermost projection rather than the wall face.

Related: Plot Coverage, Floor Area Ratio
Plot Coverage

The proportion of a site covered by the building footprint, expressed as a percentage of the plot area. It is controlled to preserve open space, daylight and drainage capacity, and is assessed separately from floor area ratio.

Related: Floor Area Ratio, Setback
Floor Area Ratio

The ratio of total permissible floor area to plot area, used to regulate development intensity. It caps how much floor space may be built regardless of how the mass is distributed across floors.

Related: Plot Coverage, Setback
RIBA Plan of Work

A staged framework describing project stages from briefing through operation, widely adapted internationally for defining deliverables and professional appointments. Its stage numbering is commonly used in Sri Lankan practice to scope architectural services.

Related: Architect's Appointment, Design Brief, Practical Completion
Design Brief

A written statement of the client's requirements, constraints, budget and performance expectations, agreed before design develops. It records the basis of design and becomes the reference against which later changes are assessed.

Related: RIBA Plan of Work, Architect's Appointment
Architect's Appointment

The contractual agreement defining an architect's scope of services, fees, authority and liabilities on a project. It should specify stages covered, deliverables, and whether the architect administers the construction contract.

Related: RIBA Plan of Work, Design Brief, Contract Administration
Contract Administration

The architect's role during construction: issuing instructions, certifying payments and completion, assessing variations and claims, and monitoring quality against the contract documents. It carries duties of impartial certification and timely communication.

Related: Interim Certificate, Practical Completion, Variation Order
Bill of Quantities

An itemised schedule of measured work prepared from drawings and specification, used for tendering and valuation. It provides a common basis for comparing bids and for pricing variations during construction.

Related: Specification, Variation Order, Interim Certificate
Specification

A written description of materials, workmanship and performance standards that supplements the drawings. Where drawings show location and quantity, the specification controls quality and method of execution.

Related: Bill of Quantities, Working Drawing
Working Drawing

Detailed, dimensioned drawings produced for construction, showing setting out, constructional detail, services coordination and finishes. They translate the design intent into information a contractor can build from.

Related: Specification, Shop Drawing
Shop Drawing

A contractor-prepared drawing detailing fabrication or installation of a specific element, submitted for the architect's review. Review confirms conformity with design intent but does not transfer design responsibility to the architect.

Related: Working Drawing, Request for Information
Request for Information

A formal query raised by the contractor seeking clarification of ambiguous or missing contract information. Responses should be documented and, where they change the contract, issued as an instruction or variation.

Related: Shop Drawing, Variation Order
Variation Order

A written instruction authorising a change to the scope, quantity, quality or timing of the works, with valuation agreed or assessed. It protects both parties by creating a documented basis for adjusting price and time.

Related: Contract Administration, Bill of Quantities, Extension of Time
Interim Certificate

A periodic certificate issued by the architect stating the value of work executed and the amount payable, less retention. It is not a guarantee of quality and does not waive defects discovered later.

Related: Contract Administration, Retention, Practical Completion
Retention

A percentage of each payment withheld by the employer as security against defects or non-completion, released in stages after completion and the defects period. It is a contractual mechanism, not a penalty.

Related: Interim Certificate, Defects Liability Period
Defects Liability Period

A defined period after practical completion during which the contractor must rectify defects notified by the employer at no extra cost. Its length and procedure are set by the contract and it runs alongside retention release.

Related: Retention, Practical Completion
Practical Completion

The stage at which the works are complete enough for their intended use, with only minor outstanding items. It triggers the defects liability period, retention release, and often the handover of as-built information.

Related: Defects Liability Period, Certificate of Conformity, Retention
Extension of Time

A contractual adjustment of the completion date for delays caused by qualifying events such as employer-caused delay, exceptionally adverse weather, or instructed variations. It protects the contractor from liquidated damages for those events.

Related: Liquidated Damages, Variation Order
Liquidated Damages

A pre-agreed sum payable by the contractor for each day of delay beyond the completion date, representing a genuine estimate of the employer's loss. It must be a reasonable forecast, not a punitive charge.

Related: Extension of Time, Practical Completion
Tender

The process of inviting priced offers to execute works or supply services on defined terms. It may be open, selective or negotiated, and its fairness depends on identical information being issued to all bidders.

Related: Bill of Quantities, Letter of Award
Letter of Award

The employer's written acceptance of a tender, forming the contract once accepted according to its terms. It should identify the accepted offer, contract sum, completion period and the contract documents that govern.

Related: Tender, Performance Bond
Performance Bond

A guarantee, usually issued by a bank or insurer, payable to the employer if the contractor fails to perform its obligations. It provides financial recourse without proving loss in detail, and is typically a percentage of the contract sum.

Related: Letter of Award, Retention
Professional Indemnity Insurance

Insurance covering an architect against claims of negligent design, specification or advice. It is usually required by appointment terms, and cover should be maintained for the limitation period applicable to the contract.

Related: Architect's Appointment, Duty of Care
Duty of Care

The legal obligation to exercise reasonable skill and care expected of a competent professional in the same field. Breach of that standard, causing foreseeable loss, grounds a negligence claim.

Related: Professional Indemnity Insurance, Architect's Appointment
Code of Professional Conduct

The ethical rules binding registered architects, covering competence, honesty, conflicts of interest, confidentiality and fair dealing with clients and fellow professionals. Breach may lead to disciplinary action by the registration body.

Related: Duty of Care, Architect's Appointment
Scope of Services

The defined set of tasks an architect will perform under an appointment, including which design stages, approvals and site duties are covered and which are excluded. Clear scoping prevents disputes over unpaid or unperformed work.

Related: Architect's Appointment, Design Brief
Site Instruction

A written direction from the architect to the contractor concerning execution of the works that does not change the contract sum or period. If it does change either, it should be reissued as a variation.

Related: Variation Order, Contract Administration
As-Built Drawing

A drawing revised after construction to record the works as actually built, including deviations from the original design. It supports future maintenance, alterations and statutory records.

Related: Working Drawing, Practical Completion
Fire Certificate

Document confirming that a building's fire safety provisions, such as means of escape, detection and extinguishing systems, meet the required standard. It is often needed before occupation of certain building types.

Related: Certificate of Conformity, Means of Escape
Means of Escape

The continuous protected routes, including doors, stairs and corridors, by which occupants can reach a place of safety in a fire. Width, travel distance and protection are governed by fire regulations and building use.

Related: Fire Certificate, Building Bye-laws
Universal Design

Designing environments and products usable by as many people as possible without adaptation, regardless of age or ability. It addresses level access, circulation widths, tactile cues and clear visual contrast from the outset.

Related: Means of Escape, Design Brief
Feasibility Study

An early appraisal testing whether a proposed development is viable in planning, technical and financial terms. It typically examines site constraints, permissible density, cost, and likely return before major design resources are committed.

Related: Design Brief, Floor Area Ratio
Snag List

A schedule of minor incomplete or defective items identified at inspection before practical completion or handover. Clearing snags is normally a condition of final completion and final payment release.

Related: Practical Completion, Defects Liability Period