33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Incorporation by reference
A code adoption mechanism where a published standard becomes legally enforceable through citation in a statute, code, or contract, with the cited edition binding.
Model code adoption
A jurisdiction formally enacts a model code such as the IBC or NFPA 101, often with local amendments; the adopted edition and amendments govern design and construction.
Authority having jurisdiction
The organization or official responsible for approving equipment, materials, installations, or procedures, and for interpreting and enforcing the adopted code.
Prescriptive versus performance design
Prescriptive design follows stated rules; performance design states objectives and requires engineering analysis plus AHJ acceptance to demonstrate equivalent safety.
Occupancy classification
The code category assigned to a building based on its use and hazard, which drives allowable height, area, egress, and fire-protection requirements.
Scope of practice
The legally defined activities a licensed professional may perform and certify; exceeding it is misconduct regardless of technical accuracy.
Vertical datum
The reference surface for elevations, such as NAVD 88 or an assumed local datum; every plan must state which datum is used.
Boundary survey requirement
Property lines and easements must be established by a licensed surveyor; deed text alone is insufficient for design or permit submittal.
One-call utility locate
The 811 notification service marks public underground utilities before excavation; private lines on the site remain the owner's responsibility to locate.
Flood zone screening
Checking the FEMA flood insurance rate map to determine the site's flood zone, base flood elevation, and any elevation or floodproofing requirements.
Pre- versus post-development runoff
A stormwater comparison showing peak discharge before and after construction; many jurisdictions require post-development peaks not to exceed pre-development peaks.
Geotechnical investigation
Subsurface exploration using borings, test pits, and lab testing to establish soil stratigraphy, bearing capacity, groundwater level, and foundation design parameters.
MasterFormat divisions
A numbering system organizing construction specifications into divisions by work type, used to structure and cross-reference project manuals.
Load and resistance factor design
A design method applying factored loads and resistance factors to nominal strengths so that factored resistance equals or exceeds factored load effects.
Allowable stress design
A design method comparing computed service-level stresses to allowable stresses obtained by dividing material strength by a factor of safety.
Substitution request
A contractor's formal proposal to use a product other than the specified one, evaluated against stated criteria and deadlines in the specification.
Design review gate
A scheduled checkpoint at a defined completion percentage where deliverables are reviewed and comments resolved before the next design phase proceeds.
Hold point
A stage in construction where work must not proceed until a required inspection or test is completed and documented as acceptable.
Trench protective system
Sloping, shoring, or shielding required for excavations 5 feet (1.5 m) or deeper to protect workers from cave-in, inspected daily by a competent person.
Welding procedure specification
A written document specifying welding variables and qualified parameters; it must be available on site and followed by certified welders.
Listed firestop system
A tested and third-party-listed assembly of sealant and components approved for a specific wall or floor construction and penetrating item combination.
Field change documentation
Written confirmation of any deviation from approved documents, issued as a change order or field instruction before the affected work is concealed.
Daily construction report
A contemporaneous record of weather, labor, equipment, deliveries, visitors, and deviations that supports schedule, payment, and claim analysis.
Special inspection
Code-mandated inspection of specific work by an approved agency, separate from the contractor's quality control and the building official's inspection.
Instrument calibration traceability
Test equipment must be calibrated against standards traceable to a national metrology institute, with certificates current at the time of testing.
Soil compaction acceptance
Field density testing compared to a laboratory maximum dry density, commonly requiring 95 percent of ASTM D698 maximum unless otherwise specified.
Hydrostatic pressure test
A piping test filling the system with water at a specified multiple of design pressure, held for a set duration, with no pressure loss or leakage.
Nonconformance disposition
The documented decision on nonconforming work: rework, repair, use-as-is with engineering approval, or rejection, followed by verification of closure.
Certificate of occupancy prerequisite
Final inspection and resolution of life-safety punch items must be complete before an occupancy certificate is issued, regardless of other work status.
Responsible charge
The professional's supervisory and review role over work that is sealed; sealing work performed without such supervision is misconduct.
Conflict of interest disclosure
Written disclosure of financial or personal interests in suppliers, contractors, or products, followed by recusal from related approval decisions.
Document revision control
Issued documents are corrected using revision clouds, numbers, dates, and initials, and superseded sheets are marked void rather than removed from the record.
Record retention period
The duration project records must be kept, set by contract, statute of limitations, or licensing board rule; the longest applicable period governs.