SLNC Registration: Installation and Construction Practices

SLNC Registration · Work through your exam, one topic at a time.

All guide sections

Installation and Construction Practices

What this domain tests

Domain 4 tests field control: whether installation follows approved documents, manufacturer instructions, and accepted workmanship standards, with records kept at hold points.

Core rules

  • Pre-installation. Verify approved submittals, material conformance, storage conditions, and mock-up acceptance.
  • Manufacturer instructions. Follow torque values, fastener types, clearances, sealants, cure times, and environmental limits.
  • Hold points. Inspect before concealment; do not cover work until the required release is documented.
  • Tolerances. Measure alignment, plumb, level, anchor embedment, and clearances; do not eyeball them.
  • Change control. Field changes require an RFI or change order; redline as-built conditions continuously.
  • Protection. Manage weather, traffic, corrosion, and housekeeping throughout installation.

Worked example

An anchor schedule requires a torque value, but the crew proposes 'snug tight' because the torque wrench is missing. Reasoning: torque controls clamp load and vibration resistance. Obtain a calibrated wrench, follow the approved schedule, and record values by anchor location; do not substitute feel.

Traps that cost marks

  • Over-torque or under-torque outside the approved schedule.
  • Mixing anchor types or fastener grades.
  • Concealing work before inspection release.
  • Installing outside temperature, wind, or moisture limits.
  • Relying on verbal field direction instead of a document.