LPSCE key terms
LPSCE · Get comfortable with the vocabulary.
- Muda
- Related: Value-Added Activity, Value Stream Mapping, Kaizen
Any activity that consumes resources without creating value for the customer. Typical forms include overproduction, waiting, transport, overprocessing, inventory, motion, and defects; Lean targets these for elimination.
- Value-Added Activity
- Related: Muda, Value Stream Mapping
Work that physically or informationally transforms a product or service in a way the customer would willingly pay for, done right the first time. Anything else is business-necessary waste or pure waste.
- Value Stream Mapping
- Related: Muda, Takt Time, Kaizen
A visual mapping technique that traces material and information flow from customer request to delivery, showing process steps, inventory, lead time, and value-added ratio to expose improvement opportunities.
- Kaizen
- Related: Standard Work, Value Stream Mapping
Continuous, incremental improvement carried out by the people who do the work. Events are typically short, focused, team-based efforts to remove waste and standardize a better method.
- Takt Time
- Related: Value Stream Mapping, Kanban
The available production time divided by customer demand, expressed as time per unit. It sets the pace a process must meet to satisfy demand without overproducing.
- Kanban
- Related: Takt Time, Muda
A pull signal, often a card or electronic marker, authorizing upstream work to replenish what downstream has consumed. It limits work-in-process and prevents overproduction.
- Poka-Yoke
- Related: Standard Work, FMEA
An error-proofing device or design feature that prevents a mistake from being made or makes it immediately obvious. Examples include fixtures that only accept correct orientation and sensors that stop the line.
- Critical to Quality (CTQ)
- Related: Voice of the Customer, Kano Model
A measurable characteristic of a product or service that directly reflects what the customer values. CTQs translate vague customer needs into specifications a process can be measured against.
- Voice of the Customer (VOC)
- Related: Critical to Quality (CTQ), Kano Model
Structured collection of customer needs, expectations, and complaints through interviews, surveys, complaints, and observation. It is the raw input that gets translated into CTQs and project goals.
- Kano Model
- Related: Voice of the Customer, Critical to Quality (CTQ)
A framework classifying features as basic (expected), performance (more is better), or delighter (unexpected). It helps teams prioritize requirements that drive satisfaction versus those that only prevent dissatisfaction.
- Project Charter
- Related: Problem Statement, SMART Goal, Stakeholder Analysis
A formal document authorizing a Six Sigma project. It states the problem, goal, scope, business case, team, milestones, and constraints, and is signed by the project sponsor.
- Problem Statement
- Related: Project Charter, SMART Goal
A concise description of the gap between current and desired performance, including magnitude, location, timing, and customer impact, without stating a cause or a solution.
- SMART Goal
- Related: Project Charter, Problem Statement
A goal written to be specific, measurable, achievable, relevant, and time-bound. In DMAIC it defines the target metric and date the team commits to achieving.
- SIPOC Diagram
- Related: Project Charter, Value Stream Mapping
A high-level map of suppliers, inputs, process, outputs, and customers used to define project scope and boundaries. It shows where the process starts and stops before detailed mapping.
- Stakeholder Analysis
- Related: Change Management, Project Charter
Identifying everyone affected by or able to influence a project, then assessing their interest and influence to plan communication and buy-in. It supports change management throughout DMAIC.
- DMAIC
- Related: Project Charter, Control Plan, Hypothesis Test
The five-phase Six Sigma improvement cycle: Define, Measure, Analyze, Improve, Control. Each phase has required deliverables and a tollgate review before the next phase begins.
- DMADV
- Related: DMAIC, Critical to Quality (CTQ)
A design-for-Six-Sigma cycle: Define, Measure, Analyze, Design, Verify. It is used to create a new process or product when an existing one cannot meet requirements through improvement alone.
- Tollgate Review
- Related: DMAIC, Project Charter
A checkpoint at the end of each DMAIC phase where the team, sponsor, and belt review deliverables and evidence before approving progress or redirecting the project.
- Measurement System Analysis (MSA)
- Related: Gage R&R, Attribute Agreement Analysis, Process Capability
A set of studies quantifying how much variation in measured data comes from the measurement system itself, including repeatability, reproducibility, bias, linearity, and stability.
- Gage R&R
- Related: Measurement System Analysis (MSA), Attribute Agreement Analysis
A study separating measurement variation into repeatability (same operator, same part) and reproducibility (different operators). Results are expressed as a percentage of total or tolerance variation.
- Attribute Agreement Analysis
- Related: Measurement System Analysis (MSA), Gage R&R
An MSA method for pass/fail or categorical judgments, measuring agreement within raters, between raters, and against a known standard. Kappa statistics are commonly reported.
- Process Capability
- Related: Control Chart, Gage R&R, Specification Limits
A comparison of process spread and centering against specification limits, expressed as Cp, Cpk, Pp, or Ppk. Higher values mean fewer expected defects relative to tolerances.
- Specification Limits
- Related: Process Capability, Control Chart
The upper and lower bounds on a characteristic set by the customer or design, not by the process. They define acceptability and are independent of the process's natural variation.
- Data Stratification
- Related: Pareto Chart, Hypothesis Test
Breaking a dataset into subgroups by machine, shift, operator, lot, or other factor so patterns hidden in aggregate data become visible. It often reveals the true source of variation.
- Pareto Chart
- Related: Data Stratification, Fishbone Diagram
A bar chart of categories sorted from largest to smallest with a cumulative line, used to focus effort on the few causes producing most of the effect.
- Fishbone Diagram
- Related: 5 Whys, Pareto Chart
A cause-and-effect diagram organizing potential causes into branches such as people, machine, method, material, measurement, and environment. It structures brainstorming before data collection.
- 5 Whys
- Related: Fishbone Diagram, Root Cause
An iterative questioning technique that asks why repeatedly to move from a symptom to a root cause. Each answer becomes the subject of the next why, usually stopping at a controllable cause.
- Root Cause
- Related: 5 Whys, Fishbone Diagram
The underlying reason a problem occurs that, if removed, prevents recurrence. It is verified with data rather than assumed from opinion or a single observation.
- Hypothesis Test
- Related: Type I Error, Type II Error, Sample Size
A statistical procedure comparing sample evidence against a null hypothesis, yielding a p-value used to decide whether an observed difference or relationship is likely real rather than chance.
- Type I Error
- Related: Hypothesis Test, Type II Error
Rejecting a true null hypothesis, also called alpha or the producer's risk. In improvement work it means declaring a factor significant when it is not.
- Type II Error
- Related: Hypothesis Test, Sample Size
Failing to reject a false null hypothesis, also called beta or the consumer's risk. Its complement, power, is the probability of correctly detecting a real effect.
- Sample Size
- Related: Hypothesis Test, Type II Error
The number of observations needed to detect an effect of practical size with acceptable alpha and power. It depends on effect size, variability, and the test chosen.
- Design of Experiments (DOE)
- Related: Pilot Testing, Hypothesis Test
A structured set of runs that varies factors together so their individual and interacting effects on a response can be estimated efficiently, rather than changing one factor at a time.
- FMEA
- Related: Poka-Yoke, Control Plan
Failure Mode and Effects Analysis ranks potential failure modes by severity, occurrence, and detection to prioritize preventive action. It is used both to design solutions and to control risk.
- Pilot Testing
- Related: Design of Experiments (DOE), Standard Work
A limited trial of a proposed solution under realistic conditions to confirm it works, surface side effects, and build evidence before full-scale rollout.
- Control Chart
- Related: Process Capability, Standard Work, Control Plan
A time-ordered plot of a process metric with statistically derived control limits. It distinguishes common-cause variation from special-cause signals that require investigation.
- Control Plan
- Related: Control Chart, Standard Work
A document specifying which metrics are monitored, how and how often they are measured, who responds to out-of-control signals, and what corrective action is taken.
- Standard Work
- Related: Kaizen, Poka-Yoke, Control Plan
A documented, agreed method for a task that captures the current best sequence, timing, and quality checks. It is the baseline that makes deviations visible and improvement possible.
- Change Management
- Related: Stakeholder Analysis, RACI Matrix
The structured approach to moving people from current to future ways of working, addressing communication, resistance, training, and reinforcement so improvements persist.
- RACI Matrix
- Related: Change Management, Project Charter
A responsibility chart labeling each task or decision as responsible, accountable, consulted, or informed. It clarifies roles and prevents gaps or duplicated ownership on a project team.