- Ohm's law
- Voltage equals current multiplied by resistance (V = I × R). Combined with P = V × I, it allows any two known electrical quantities to determine the remaining ones in a DC or resistive circuit.
- Three-phase power formula
- For a balanced three-phase load, active power equals the square root of three multiplied by line voltage, line current and power factor: P = √3 × U × I × cos φ.
- Power factor correction
- Capacitor reactive power needed is Qc = P × (tan φ1 − tan φ2), where φ1 is the present angle and φ2 the target angle, usually chosen for a power factor near 0.95.
- MCB trip curves
- B curve trips magnetically at 3–5 times rated current, C at 5–10 times and D at 10–20 times. The choice depends on inrush current of the protected load.
- Insulation resistance test
- A DC test voltage, commonly 500 V or 1000 V, is applied between conductors and earth. A result below about 1 MΩ on a 400 V installation indicates degraded insulation.
- Torque and power relation
- Shaft torque in newton-metres equals 9550 times power in kilowatts divided by speed in revolutions per minute: T = 9550 × P / n.
- Bearing bore code
- In a bearing designation, the last two digits multiplied by five give the bore diameter in millimetres. For example, a 6205 bearing has a 25 mm bore.
- Vibration fault signatures
- A dominant 1× running speed component indicates unbalance, 2× indicates misalignment, and high-frequency broadband energy suggests rolling-element bearing defects.
- Soft foot check
- With a dial gauge on each foot, loosen one bolt at a time and read the movement. A value above about 0.05 mm is corrected with shims before shaft alignment.
- Hydraulic power formula
- Hydraulic power in kilowatts equals pressure in bar multiplied by flow in litres per minute, divided by 600. This gives the mechanical power delivered by the pump.
- Cylinder retraction force
- Retraction force equals pressure multiplied by the annulus area, which is the piston area minus the rod cross-section area. Extension force uses the full piston area.
- Relief valve setting rule
- The pressure relief valve is normally set 10 to 15 percent above the maximum working pressure of the circuit so it protects the pump without nuisance opening.
- FRL unit order
- In a pneumatic preparation unit, air passes through the filter first, then the pressure regulator, then the lubricator. The regulator sets downstream pressure.
- Commissioning sequence
- Mechanical completion, then alignment, then electrical insulation and continuity checks, then no-load run, then load test and finally performance acceptance against contractual values.
- Laser shaft alignment
- Two laser units and detectors measure offset and angularity between shafts. Correct soft foot first, then align within the manufacturer's tolerance, typically below 0.05 mm offset.
- Predictive maintenance
- Condition-based maintenance uses measured parameters such as vibration, temperature and oil analysis to schedule intervention before functional failure, instead of fixed time intervals.
- Torque-to-yield bolts
- These bolts are tightened past the elastic limit to a specified angle after reaching a torque value. They deform permanently and must be replaced, not reused.
- Root cause analysis
- The 5 Whys and Ishikawa fishbone methods separate symptoms from underlying causes. Corrective action must address the cause, otherwise the same failure recurs.
- Single phasing effect
- Loss of one supply phase to a three-phase motor leaves it running on two phases, drawing high current in the remaining windings and overheating rapidly, often tripping the overload.
- 4–20 mA live zero
- The 4 mA minimum represents 0 percent of range, while 20 mA represents 100 percent. A reading of 0 mA therefore signals a broken wire or lost supply.
- Three-wire RTD
- A Pt100 sensor with three leads compensates for the resistance of the connecting cable, which is the main error source in two-wire measurement. It is common in industrial installations.
- Calibration procedure
- Compare the instrument with a traceable reference at 0, 25, 50, 75 and 100 percent of span, upscale and downscale, and record error and hysteresis against the acceptance criterion.
- LOTO sequence
- Notify, identify all energy sources, shut down, isolate, apply personal locks and tags, release stored energy, verify zero energy, work, then remove locks in reverse order.
- Hierarchy of controls
- Controls are applied in order: elimination, substitution, engineering controls, administrative controls and finally personal protective equipment, which is the least effective alone.
- P&ID purpose
- A piping and instrumentation diagram shows process equipment, piping, instruments and control loops using standard symbols. Instrument bubbles carry tag, function and loop number.
- IP code meaning
- The first digit of an IP rating indicates protection against solid objects and dust, the second against water. IP65 means dust tight and protected against water jets.
- Work order content
- A work order records equipment identification, reported fault, diagnosis, actions taken, parts used, time spent, tests performed and any remaining recommendations for the customer.
- Objective fault reporting
- Reports state measured values and observed facts separately from interpretation. Blame is avoided because the document is a technical record used for future diagnosis.
- Cable sizing checks
- A cable is adequate only when ampacity covers the protective device rating, voltage drop stays within limits, short-circuit withstand is met and the protective conductor is correctly sized.
- Motor starting current
- Direct-on-line starting draws five to eight times rated current. Star-delta connection reduces starting current and torque to one third of their direct-on-line values.
- ISO 4406 cleanliness code
- The code gives particle counts per millilitre in three size ranges. Hydraulic systems commonly require ISO 18/16/13 or cleaner, achieved with absolute-rated filters.