Week 1

Massachusetts Building Code - Roofing and Reroofing Provisions

  • Map the structure of the Massachusetts building code as it applies to roofing: locate the chapters covering roof covering, reroofing, and re-covering, and write a one-page index of section numbers with a short note on what each governs.

  • Distinguish a repair, a re-cover, and a full tear-off replacement, and record the code triggers (deck condition, number of existing layers, ice barrier requirements) that force each path.

  • Extract the prescriptive requirements for roof covering application in the code and restate them as a checklist a crew could follow on site.

  • Identify the permit and inspection points the code and local practice create for a reroof, and note which items typically require inspection before concealment.

Your checkpoint

A one-page code index plus a re-cover-versus-tear-off decision table with at least six code-based decision rows, each citing a section number.

Week 2

Massachusetts Building Code - Roofing and Reroofing Provisions & Roof Deck, Underlayment, Flashing, and Waterproofing

  • Read the code provisions on roof deck substrate, underlayment, ice barrier, and flashing, and convert them into an installation sequence for a typical steep-slope assembly.

  • Compare the code minimums against manufacturer instructions for the same assembly and record every point where the manufacturer is stricter than the code.

  • Draft the flashing details the code requires at valleys, sidewalls, headwalls, chimneys, and penetrations, and state the minimum dimensions and lap requirements for each.

  • Explain in writing why ice-dam protection at the eaves is required in Massachusetts and where the membrane must terminate.

Your checkpoint

A written sequence-of-installation sheet for a steep-slope roof with code citations and a callout list of every place manufacturer instructions exceed code minimums.

Week 3

Roofing Materials, Systems, and Installation Methods & Roof Deck, Underlayment, Flashing, and Waterproofing

  • Build a comparison table of the major steep-slope and low-slope covering types by slope range, minimum slope, fastening method, and underlayment requirement.

  • Match each covering type to the correct low-slope or steep-slope waterproofing approach, and explain why a product cannot be substituted across the slope break.

  • Work through the code and manufacturer rules for fastening patterns, nail placement, and exposure, and write a field verification checklist.

  • Identify the common installation defects that lead to leaks (improper laps, fastener placement, valley weave errors) and describe the correct method for each.

Your checkpoint

A covering-selection matrix covering at least six product families with slope limits, fastening, and underlayment columns, plus a 12-item field verification checklist.

Week 4

Structural Loading, Framing, and Roof Geometry & Ventilation, Energy Code, and Moisture Control

  • Explain how dead load, live load, snow load, and wind uplift are determined and applied to a roof assembly, and identify which code chapters govern each.

  • Calculate the added load of a re-cover versus a tear-off and state the conditions under which an existing structure must be evaluated before adding layers.

  • Describe roof geometry terms (slope, pitch, span, ridge, hip, valley, eave) and convert between slope ratio, degrees, and rise over run for at least five examples.

  • Connect ventilation requirements to moisture control: state the code ventilation ratios, the intake-to-exhaust balance requirement, and the consequence of an unbalanced system.

  • Summarize the energy code requirements that affect roofing work, including insulation placement and roof assembly R-value compliance paths.

Your checkpoint

A worked load and geometry problem set of at least ten problems with solutions, plus a one-page ventilation and insulation summary with code citations.

Week 5

Fire Safety, Occupancy Separation, and Roof Covering Classifications & Massachusetts Licensing Law and Construction Supervisor Responsibilities

  • Classify roof coverings by fire rating and explain how class ratings are determined and where the code requires a specific class.

  • Describe how occupancy separation and building separation distances affect roof covering selection and roof assembly requirements.

  • State the Massachusetts licensing structure for roofing contractors, including who must hold a license, the role of the construction supervisor license, and the consequences of unlicensed practice.

  • List the supervisory responsibilities of a construction supervisor on a roofing jobsite, including permit posting, supervision of unlicensed workers, and recordkeeping.

Your checkpoint

A two-page summary pairing fire and occupancy classification rules with the licensing and supervisor duties that apply to the same job, each item traced to its governing source.

Week 6

Business Law, Contracting, and Consumer Protection & Safety, Fall Protection, and Jobsites Regulations

  • Draft a residential roofing contract that includes scope, materials, change-order procedure, payment schedule, warranty terms, and the required consumer notices.

  • Explain the Massachusetts consumer protection rules that apply to home improvement contracting, including written contract requirements, cancellation rights, and prohibited practices.

  • Identify the lien and payment rules a roofing contractor must follow, including notice requirements and the timeline for preserving lien rights.

  • Build a jobsite safety plan covering fall protection, ladder use, roof edge and opening protection, and material handling, and state the trigger thresholds for each control.

  • Describe OSHA-style fall protection duties for residential roofing and the recordkeeping and training obligations that accompany them.

Your checkpoint

A complete sample contract package (contract, change order form, cancellation notice) plus a one-page written fall protection plan for a two-story residential tear-off.

Week 7

Massachusetts Building Code - Roofing and Reroofing Provisions & Roofing Materials, Systems, and Installation Methods & Roof Deck, Underlayment, Flashing, and Waterproofing

  • Re-read the highest-yield code sections from weeks 1 through 3 and reduce them to a single condensed reference sheet organized by job phase.

  • Re-solve every missed practice question from earlier weeks and write the correct reasoning for each in one or two sentences.

  • Apply code, material, and waterproofing knowledge to three integrated scenarios (steep-slope re-cover, low-slope membrane replacement, complex flashing retrofit) and write the compliant approach for each.

  • Verify that your reference sheet contains no unverified claims: flag any item you cannot trace to a source and resolve or discard it.

Your checkpoint

A two-page condensed reference sheet covering domains 1 through 3, plus written solutions to three integrated scenarios.

Week 8

Structural Loading, Framing, and Roof Geometry & Fire Safety, Occupancy Separation, and Roof Covering Classifications & Ventilation, Energy Code, and Moisture Control & Business Law, Contracting, and Consumer Protection & Massachusetts Licensing Law and Construction Supervisor Responsibilities & Safety, Fall Protection, and Jobsites Regulations

  • Condense the lighter domains into a single one-page review sheet organized by domain, with the two or three highest-yield facts per domain.

  • Complete a full-length timed practice exam under exam conditions and score it by domain.

  • Analyze the score report to identify the two weakest domains and write a targeted remediation list for each.

  • Rehearse the calculation types (load, slope conversion, ventilation ratio) until each can be completed without reference material.

  • Finalize a test-day plan covering time allocation per domain based on the weighting.

Your checkpoint

A scored full-length practice exam with a per-domain breakdown and a written remediation list for the two weakest domains.

Milestones

Week 2: Can state the re-cover versus tear-off decision rules and the ice barrier and flashing requirements from memory, citing section numbers, without opening the code.

Week 4: Can complete a load, slope conversion, and ventilation ratio calculation correctly in under ten minutes total, and explain the energy code compliance path for a roof assembly.

Week 6: Can produce a compliant contract package and a fall protection plan for a standard residential job with no missing required elements on a self-check list.

Week 8: Scores at least 80 percent overall on the timed practice exam with no single domain below 70 percent, and has a written remediation plan for any domain that falls short.