MD Fire Sprinkler · Give each week a clear focus.
8 weeks · About 7 hours per week
Fire Sprinkler System Design
Identify the occupancy hazard classifications and explain how each drives sprinkler design density selection
Compute required design density, remote area size, and minimum operating pressure for a light hazard wet system from a given scenario
Diagram the four major sprinkler system types (wet, dry, preaction, deluge) and label when each is required or preferred
Define hydraulic terms-density, discharge, remote area, safety margin-in writing without referring to notes
Your checkpoint
A one-page design-density decision sheet plus three fully worked hydraulic sizing calculations with units shown at every step
Fire Sprinkler System Design
Calculate sprinkler spacing, coverage area per head, and branch line limits for a given ceiling configuration
Size pipe runs using the Hazen-Williams method and explain how C-factors change for steel, copper, and CPVC
Evaluate the effect of a 10% design safety margin and elevation/backflow losses on total system demand
Compare tree, loop, and grid piping layouts for pressure loss and reliability
Your checkpoint
A complete hand-calculated hydraulic worksheet for one 2,000 sq ft light-hazard space including pipe schedule, friction loss, and total demand
Fire Sprinkler System Installation
Sequence the installation of underground mains, risers, branch lines, and heads in correct order of operations
Explain spacing and obstruction rules for heads near joists, ducts, and walls
Select the correct hanger type, spacing, and bracing method for steel and CPVC pipe
Identify required components-check valves, flow switches, inspector's test valves, drain valves-and where each is installed
Your checkpoint
An annotated installation sequence checklist covering 20 steps from rough-in to final head install, each with the reason the step cannot be skipped
Fire Sprinkler System Installation & Fire Sprinkler System Inspection, Testing and Maintenance
Perform and document the hydrostatic test procedure including test pressure, duration, and pass criteria
Describe acceptance testing for dry and preaction systems including air pressure tests and trip tests
List the components inspected at each ITM interval (weekly, monthly, quarterly, annual) and the acceptance criteria for each
Explain the difference between an impairment and a deficiency and the required response for each
Your checkpoint
A completed mock ITM log for a two-riser building covering one full year of inspections with pass/fail entries and corrective actions noted
Fire Sprinkler System Inspection, Testing and Maintenance
Walk through the annual main drain flow test and calculate expected flow from the orifice and static pressure
Explain trip testing, alarm test, and valve status testing for dry-pipe and preaction systems
Diagnose common failure signatures: low pressure, slow trip, false alarms, and obstructed heads
Describe the process for restoring a system after an impairment and who must be notified
Your checkpoint
A troubleshooting decision tree for five common system failures with the test that confirms each diagnosis
Maryland Code, Licensing and Plan Review
Map Maryland's licensing structure for sprinkler contractors, designers, and fitters and identify which license covers which work
Outline the plan review and permit submission process including which authority has jurisdiction
Identify the state-adopted code edition and explain how local amendments affect design and installation
Explain contractor and individual continuing education and renewal requirements
Your checkpoint
A one-page Maryland licensing and plan review flowchart showing the path from design to permit to final inspection
Maryland Code, Licensing and Plan Review & Fire Sprinkler System Design
Apply Maryland-specific code provisions to two design scenarios and note where state rules tighten the model code
Explain the roles of the state fire marshal, local fire departments, and building officials in approvals and inspections
Review record-keeping, as-built, and documentation obligations after installation
Re-work two missed design calculations from week 1 using the code edition in force in Maryland
Your checkpoint
A written compliance summary for one hypothetical project listing every permit, approval, and inspection required in Maryland with the responsible party
Fire Sprinkler System Design & Fire Sprinkler System Installation & Fire Sprinkler System Inspection, Testing and Maintenance & Maryland Code, Licensing and Plan Review
Complete a full-length timed practice exam and score each domain separately
Review every missed question and write the underlying rule or calculation in your own words
Re-drill the two weakest domains with focused practice sets
Build a one-page formula and code-reference sheet from memory, then verify it against source material
Your checkpoint
A scored practice exam with a written error log identifying root cause for each miss and a verified final reference sheet
Milestones
Week 2: Can complete a hydraulic calculation for a light-hazard wet system unaided in under 30 minutes with correct units and safety margin
Week 4: Can list the weekly, monthly, quarterly, and annual ITM tasks from memory and state pass criteria for each
Week 6: Can describe Maryland's licensing tiers, the permit path, and the adopting authority without notes
Week 8: Scores at least 80% overall with no domain below 70% on a timed full-length practice exam