- ISA-95 Level 3
- The manufacturing operations management layer that includes MES functions such as scheduling, dispatching, execution, quality, and inventory tracking, sitting between ERP at Level 4 and control systems at Levels 0-2.
- MES versus ERP
- ERP plans orders, costs, and materials at the business level; MES receives released orders, dispatches work, records actual consumption and yield, and confirms results back to ERP.
- Work order release flow
- ERP releases a work order to MES, which converts it into sequenced operations, dispatches them to work centers and resources, captures execution events, and confirms completion back to ERP.
- Takt time
- Available production time divided by customer demand. It sets the required pace of production, and line balancing assigns tasks so no station's cycle time exceeds takt.
- Critical ratio
- (Due date minus current date) divided by remaining processing time. A value below 1 means the job is behind schedule; lower values indicate greater urgency.
- Little's Law
- Throughput equals work in process divided by cycle time. At constant throughput, reducing WIP proportionally shortens cycle time, which is the basis for pull and kanban design.
- Schedule adherence
- Orders completed on time divided by orders scheduled, multiplied by 100. It measures execution performance against the plan rather than the quality of the plan itself.
- Cp and Cpk
- Cp = (USL - LSL) / (6 sigma) measures potential capability. Cpk = min[(USL - mean), (mean - LSL)] / (3 sigma) penalizes processes that are off-center.
- Nelson control chart rules
- Signals of special-cause variation include one point beyond 3 sigma, two of three points beyond 2 sigma on the same side, and eight consecutive points on one side of the mean.
- Nonconformance disposition
- An authorized decision on nonconforming material: use-as-is, rework, scrap, or return to supplier. Systemic causes trigger a CAPA; MES holds block movement until disposition is recorded.
- Rolled throughput yield
- The product of first pass yield at each process step. It estimates the probability that a unit passes every step without rework or scrap, exposing hidden factory losses.
- FEFO versus FIFO
- FIFO issues the oldest stock first by receipt date. FEFO issues stock with the earliest expiration date first and is mandatory for perishable or shelf-life-controlled materials.
- Genealogy in MES
- The as-built record of parent-child material relationships, linking finished goods to components, lots, equipment, and operators so recalls can trace forward and backward.
- Backflush consumption
- Automatic component consumption based on BOM quantity when an operation completes. It reduces transactions but hides scrap and mis-consumption unless reconciled against actual usage.
- Cycle counting
- Counting a subset of inventory on a rotating schedule rather than a full physical inventory, targeting high-value or high-movement items more frequently to maintain accuracy.
- OEE formula
- Overall Equipment Effectiveness = Availability x Performance x Quality. Availability = run time / planned production time; Performance = (ideal cycle time x count) / run time; Quality = good count / total count.
- Six big losses
- Breakdowns, setup and adjustments, minor stops, reduced speed, process defects, and startup rejects. Each maps to availability, performance, or quality loss in the OEE waterfall.
- MTBF and MTTR
- Mean time between failures = operating time / number of failures. Mean time to repair = repair time / number of repairs. Availability from these equals MTBF / (MTBF + MTTR).
- Predictive maintenance
- Condition-based maintenance triggered by measured indicators such as vibration, thermography, or oil analysis, rather than by calendar intervals or usage counts as in preventive maintenance.
- OPC UA
- An interoperability standard for plant-floor data exchange that provides an information model, security, and TCP-based transport, commonly used to connect MES and SCADA to equipment.
- ISA-95 B2MML
- An XML schema implementing ISA-95 message definitions for exchanging schedules, work orders, material confirmations, and related transactions between ERP and MES.
- Idempotent interface
- An interface designed so that retrying the same message does not create duplicate transactions. Essential for reliable ERP-to-MES integration where network retries are expected.
- Time synchronization
- Aligning clocks across PLCs, MES servers, and historians using NTP or PTP so that events are ordered correctly in audit trails, genealogy, and downtime analysis.
- Configuration over customization
- Using configurable workflows and master data instead of custom code. This keeps upgrades feasible, bounds validation scope, and reduces long-term maintenance cost.
- MES environment promotion
- A controlled path from development to test/validation to production, with documented migration of configuration and master data and approval at each gate.
- Role-based access control
- Assigning permissions by job role, separating configuration, production execution, and quality disposition duties so no single user can both execute and approve critical records.
- 21 CFR Part 11
- FDA regulation for electronic records and signatures in regulated records, requiring audit trails, access control, signature integrity, and signatures linked to their records.
- ALCOA+ data integrity
- Records must be attributable, legible, contemporaneous, original, and accurate, plus complete, consistent, enduring, and available. The framework for GMP data integrity assessment.
- GAMP 5 software categories
- Category 3 covers configurable standard software, category 4 covers configured products, and category 5 covers custom code. Validation effort scales with category and risk.
- Validation lifecycle
- URS, risk assessment, installation qualification, operational qualification, performance qualification, traceability matrix, validation summary report, and periodic review after release.
- OEE waterfall
- A decomposition of losses from planned production time to run time to net run time to fully productive time, showing availability, performance, and quality losses separately.
- Pareto analysis
- Ranking downtime or defect causes by frequency or impact to identify the few causes responsible for most loss, prioritizing improvement work where it yields the greatest return.