MES key terms
MES · Get comfortable with the vocabulary.
- Manufacturing Execution System (MES)
- Related: ISA-95, Work Order, Electronic Batch Record
Software that directs, monitors, and records work as it happens on the shop floor, connecting enterprise planning systems to machines, operators, and materials in real time.
- ISA-95 (IEC 62264)
- Related: Manufacturing Execution System (MES), Enterprise Resource Planning (ERP) Integration, OPC UA
International standard defining the functional hierarchy and data models that separate enterprise business systems from manufacturing operations, giving MES vendors and integrators a common vocabulary for integration.
- Work Order
- Related: Routing, Dispatching, Production Yield
An authorization to produce a defined quantity of a product by a specified date, carrying routing, bill of material, and status information that MES uses to schedule, execute, and report production.
- Routing
- Related: Work Order, Work Center, Bill of Material (BOM)
The ordered sequence of operations, work centers, and required resources needed to manufacture a product, used by MES to sequence steps and collect data at each stage.
- Dispatching
- Related: Work Order, Finite Scheduling, Work Center
Releasing work orders or operations to the shop floor in a defined sequence so operators and equipment know exactly what to run next.
- Finite Scheduling
- Related: Dispatching, Work Center, Overall Equipment Effectiveness (OEE)
Planning that respects real capacity limits of machines and labor, so start and end times reflect actual availability rather than infinite-capacity assumptions.
- Bill of Material (BOM)
- Related: Material Genealogy, Backflushing, Work Order
A structured list of components, quantities, and relationships required to build a product, used by MES to issue materials, verify consumption, and backflush inventory.
- Work Center
- Related: Routing, Finite Scheduling, Overall Equipment Effectiveness (OEE)
A defined production resource, such as a line, cell, or machine group, where operations are performed and against which capacity, labor, and performance are measured.
- Production Yield
- Related: Scrap and Rework, Overall Equipment Effectiveness (OEE), Statistical Process Control (SPC)
The ratio of good, saleable output to total input or theoretical output for a process, a core MES performance measure used to detect losses and drive improvement.
- Scrap and Rework
- Related: Nonconformance, Production Yield, Corrective and Preventive Action (CAPA)
Scrap is material that cannot be sold or used; rework is product reprocessed to meet specification. Both are recorded in MES to explain yield loss and cost.
- Electronic Batch Record (EBR)
- Related: 21 CFR Part 11, Audit Trail, Electronic Signature
A validated electronic record of a production batch, capturing materials, equipment, steps, signatures, and results in place of a paper batch record.
- Master Batch Record (MBR)
- Related: Electronic Batch Record (EBR), Routing, Good Manufacturing Practice (GMP)
The approved master recipe and instructions from which each batch record is created; it defines required steps, materials, and in-process controls.
- Good Manufacturing Practice (GMP)
- Related: Master Batch Record (MBR), Validation (IQ/OQ/PQ), Electronic Batch Record (EBR)
Regulations and guidance requiring manufacturers to control facilities, processes, and records so products consistently meet quality standards.
- 21 CFR Part 11
- Related: Electronic Signature, Audit Trail, Electronic Batch Record (EBR)
US regulation setting criteria under which electronic records and electronic signatures are considered trustworthy, reliable, and equivalent to paper records.
- Electronic Signature
- Related: 21 CFR Part 11, Audit Trail, Electronic Batch Record (EBR)
A computer-based signature that identifies the signer and is linked to the signed record, typically requiring two distinct components such as user ID and password.
- Audit Trail
- Related: 21 CFR Part 11, Electronic Signature, Data Integrity (ALCOA+)
A secure, time-stamped record of who created, changed, or deleted data and why, which cannot be edited or disabled by ordinary users.
- Data Integrity (ALCOA+)
- Related: Audit Trail, Validation (IQ/OQ/PQ), Electronic Batch Record (EBR)
The property that records are attributable, legible, contemporaneous, original, accurate, complete, consistent, enduring, and available throughout their retention period.
- Validation (IQ/OQ/PQ)
- Related: Computer System Validation (CSV), Good Manufacturing Practice (GMP), Data Integrity (ALCOA+)
Documented evidence that a system consistently performs as intended, established through installation qualification, operational qualification, and performance qualification stages.
- Computer System Validation (CSV)
- Related: Validation (IQ/OQ/PQ), Change Control, Data Integrity (ALCOA+)
The overall lifecycle process of proving that a computerized system is fit for its intended use, including planning, risk assessment, testing, traceability, and change control.
- Change Control
- Related: Computer System Validation (CSV), Audit Trail, Corrective and Preventive Action (CAPA)
A formal process for proposing, reviewing, approving, testing, and documenting modifications to a validated system or process before implementation.
- Statistical Process Control (SPC)
- Related: Control Chart, Process Capability (Cpk), Nonconformance
Using control charts and statistical rules on process measurements to distinguish normal variation from special-cause shifts that require corrective action.
- Control Chart
- Related: Statistical Process Control (SPC), Process Capability (Cpk)
A time-ordered plot of a quality characteristic with statistically derived control limits, used to detect when a process has gone out of control.
- Process Capability (Cpk)
- Related: Statistical Process Control (SPC), Control Chart
A measure of how well a stable process fits within specification limits, comparing process spread and centering against the tolerance width.
- Nonconformance
- Related: Corrective and Preventive Action (CAPA), Scrap and Rework, Hold and Release
Any deviation from specification, procedure, or requirement, recorded in MES so it can be contained, dispositioned, and investigated.
- Corrective and Preventive Action (CAPA)
- Related: Nonconformance, Root Cause Analysis, Change Control
A structured process to eliminate the cause of detected problems and prevent potential ones, tracked from investigation through verified effectiveness.
- Root Cause Analysis
- Related: Corrective and Preventive Action (CAPA), Nonconformance
A systematic investigation method, such as the five whys or fishbone diagram, used to find the underlying reason a defect or failure occurred.
- Hold and Release
- Related: Nonconformance, Material Genealogy, Quarantine
A status control that blocks material or product from further processing or shipment until a qualified person reviews and formally releases it.
- Material Genealogy
- Related: Lot Traceability, Bill of Material (BOM), Hold and Release
The traceable record linking finished product to the specific lots of raw materials, components, and equipment used, supporting recalls and investigations.
- Lot Traceability
- Related: Material Genealogy, Quarantine, Serialization
The ability to follow a batch or lot forward to customers and backward to suppliers and production steps, using recorded lot identifiers.
- Backflushing
- Related: Bill of Material (BOM), Lot Traceability
Automatically deducting component quantities from inventory based on completed production rather than explicit manual issue transactions.
- Quarantine
- Related: Hold and Release, Lot Traceability, Nonconformance
A controlled inventory status that physically or logically isolates material pending inspection, testing, or disposition so it cannot be used unintentionally.
- Serialization
- Related: Lot Traceability, Material Genealogy
Assigning a unique identifier to each individual unit, enabling unit-level tracking, aggregation, and verification through the supply chain.
- Overall Equipment Effectiveness (OEE)
- Related: Downtime Tracking, Total Productive Maintenance (TPM), Production Yield
A composite metric multiplying availability, performance, and quality rates to show how much of a machine's planned production time produced good output.
- Downtime Tracking
- Related: Overall Equipment Effectiveness (OEE), Mean Time Between Failures (MTBF)
Recording and categorizing the reasons equipment is not running, providing the availability input to OEE and the basis for loss analysis.
- Mean Time Between Failures (MTBF)
- Related: Mean Time To Repair (MTTR), Preventive Maintenance, Downtime Tracking
The average operating time between equipment failures, a reliability indicator used to plan maintenance and judge improvement.
- Mean Time To Repair (MTTR)
- Related: Mean Time Between Failures (MTBF), Preventive Maintenance
The average time needed to restore equipment to working condition after a failure, reflecting maintainability and repair effectiveness.
- Preventive Maintenance
- Related: Total Productive Maintenance (TPM), Mean Time Between Failures (MTBF), Work Order
Scheduled servicing performed on a time or usage basis to reduce the likelihood of failure and keep equipment within validated operating condition.
- Total Productive Maintenance (TPM)
- Related: Preventive Maintenance, Overall Equipment Effectiveness (OEE)
A maintenance strategy engaging operators and technicians to maximize equipment effectiveness through autonomous care, planned maintenance, and continuous loss elimination.
- OPC UA
- Related: ISA-95, Historian, Programmable Logic Controller (PLC)
An open, platform-independent communication standard with built-in security and information modeling, widely used to exchange shop-floor data between equipment and MES.
- Programmable Logic Controller (PLC)
- Related: Supervisory Control and Data Acquisition (SCADA), OPC UA
An industrial controller that executes machine logic and exposes tag data used by MES to monitor equipment state, counts, and alarms.
- Supervisory Control and Data Acquisition (SCADA)
- Related: Programmable Logic Controller (PLC), Historian
A system that supervises and controls plant equipment, collecting real-time process values and alarms that MES can consume for execution and reporting.
- Historian
- Related: OPC UA, SCADA, Supervisory Control and Data Acquisition (SCADA)
A time-series database optimized for high-volume process data, used to trend, analyze, and retain equipment and sensor values.
- Enterprise Resource Planning (ERP) Integration
- Related: ISA-95, Work Order, Bill of Material (BOM)
Exchange of orders, inventory, and master data between ERP and MES so planning and execution stay synchronized through defined interfaces and message contracts.
- Middleware
- Related: Enterprise Service Bus (ESB), OPC UA
Software that connects disparate systems, translating protocols and routing messages so MES, ERP, and equipment can exchange data without tight coupling.
- Enterprise Service Bus (ESB)
- Related: Middleware, Enterprise Resource Planning (ERP) Integration
An integration layer that routes, transforms, and mediates messages among applications, often used to decouple MES from ERP and other plant systems.
- High Availability
- Related: Disaster Recovery, Middleware
A system design using redundancy, failover, and health monitoring so MES remains operational despite component failure, critical for continuous production.
- Disaster Recovery
- Related: High Availability, Audit Trail
Documented plans, backups, and restoration procedures that let an organization recover MES data and operations within a defined recovery time objective.
- Role-Based Access Control (RBAC)
- Related: Electronic Signature, Audit Trail
Assigning permissions to job roles rather than individuals, so users can only perform actions appropriate to their responsibilities and segregation requirements.
- Key Performance Indicator (KPI)
- Related: Overall Equipment Effectiveness (OEE), Production Yield, Statistical Process Control (SPC)
A quantifiable measure chosen to track progress toward an operational goal, such as OEE, first-pass yield, or schedule attainment.
- First Pass Yield (FPY)
- Related: Production Yield, Scrap and Rework, Overall Equipment Effectiveness (OEE)
The percentage of units that pass all process steps the first time without rework, scrap, or retest.
- Plan-Do-Check-Act (PDCA)
- Related: Root Cause Analysis, Key Performance Indicator (KPI), Corrective and Preventive Action (CAPA)
An iterative improvement cycle of planning a change, running it, checking results, and standardizing or adjusting, used to structure continuous improvement projects.