Week 1

Fire Sprinkler System Design and Installation Standards

  • Map the layout of NFPA 13 chapter by chapter and write a one-line purpose statement for each chapter so you can locate any requirement in under a minute

  • Define the occupancy hazard classifications (light, ordinary Group 1 and 2, extra Group 1 and 2) and list three real Michigan building examples for each

  • Distinguish pipe schedule design from hydraulic design and state in writing when each method is permitted

  • Build a one-page table of sprinkler temperature ratings, K-factors, and spacing maximums keyed to hazard class

Your checkpoint

A hand-written or typed 2-page standards map with chapter index, hazard class examples, and a sprinkler selection table, self-quizzed to 90% recall

Week 2

Fire Sprinkler System Design and Installation Standards & Water Supply Analysis and Hydraulic Calculations

  • Trace a complete waterflow path from supply main through riser, cross main, branch line, and head, labeling every component on a sketched riser diagram

  • Compute required starting pressure and flow for a simple 6-head tree system by hand using the density/area method

  • Explain the difference between design density, design area, and remote area and show how occupancy and construction affect each

  • Identify the four acceptable water supply sources and the flow test data needed to document each

Your checkpoint

A hand-calculated hydraulic worksheet for a 6-head tree system showing node flows, pipe friction, elevation, and total demand, checked against a second calculation

Week 3

Water Supply Analysis and Hydraulic Calculations

  • Calculate friction loss with the Hazen-Williams formula for at least five pipe sizes and flow rates and verify against a nomograph or software

  • Apply fitting equivalent-length and velocity-pressure allowances correctly in a worked example

  • Perform a flow test analysis including static, residual, and pitot readings and plot the supply curve against system demand

  • Explain how a backflow preventer, meter, and private service main each shift the supply curve

Your checkpoint

A one-page supply-versus-demand graph with a documented flow test and a written conclusion on whether the system is adequately supplied

Week 4

Michigan Fire Safety Rules and Administrative Code

  • Outline the Michigan Fire Prevention Code structure and locate the sections that adopt the sprinkler installation standards

  • List the state fire safety board and bureau roles that touch sprinkler plan approval and inspection authority

  • Summarize the administrative rule requirements for sprinkler system acceptance and periodic inspection reporting in Michigan

  • Compare state-adopted editions against the current national standard and note any Michigan amendments

Your checkpoint

A 1-page Michigan rule summary table listing citation, requirement, and who enforces it, with every citation verified against the current adopted text

Week 5

Contractor Licensing Law and Business Practices & Plans, Permits, and Plan Review Procedures

  • Explain Michigan contractor and fire protection licensing requirements, including the role of the state licensing board and the qualifying individual

  • Distinguish the responsibilities of the contractor, the responsible managing employee, and the property owner on a project

  • Sequence the plan submittal, review, approval, permit issuance, and inspection request workflow for a typical project

  • List the common plan review rejection reasons and the shop drawing elements a reviewer expects to see

  • Describe record-keeping, contract, and lien basics that affect a sprinkler contractor's business

Your checkpoint

A process flowchart from bid to final inspection with the licensing, permit, and plan review checkpoints labeled and the responsible party named at each step

Week 6

Inspection, Testing, and Maintenance of Sprinkler Systems

  • Build a maintenance calendar for weekly, monthly, quarterly, annual, and multi-year inspection and test tasks

  • Describe the main drain flow test procedure and the acceptance criteria for a passing result

  • Explain the difference between an inspection, a test, and maintenance and give a field example of each

  • List the impairment and impairment-coordinator procedures to follow when a system is out of service

Your checkpoint

A one-page ITM checklist covering at least 15 tasks with frequency, pass criteria, and documentation requirement for each

Week 7

Inspection, Testing, and Maintenance of Sprinkler Systems & Plans, Permits, and Plan Review Procedures

  • Walk through a final acceptance test sequence including hydrostatic, flushing, alarm, and trip tests

  • Identify the documentation package a contractor must deliver at turnover and what each document proves

  • Review a sample set of incomplete plans and write specific correction comments a reviewer would accept

  • Practice explaining a plan review deficiency to a contractor in clear, citation-based language

Your checkpoint

A written plan review of a sample drawing set with at least 10 specific, cited correction comments and a turnover document checklist

Week 8

Fire Sprinkler System Design and Installation Standards & Michigan Fire Safety Rules and Administrative Code & Contractor Licensing Law and Business Practices & Water Supply Analysis and Hydraulic Calculations & Inspection, Testing, and Maintenance of Sprinkler Systems & Plans, Permits, and Plan Review Procedures

  • Take a timed 100-question mixed practice exam and score each domain separately

  • Re-study the two weakest domains using the notes and worksheets built in weeks 1 through 7

  • Re-derive one hydraulic calculation from memory without reference material

  • Recite the key Michigan citations and licensing requirements aloud to confirm retention

Your checkpoint

A scored practice exam with a domain-by-domain error log and a one-page final review sheet of the 20 facts most often missed

Milestones

Week 2: Can sketch a full riser diagram from memory and explain density/area selection for three hazard classes without notes

Week 4: Can complete a hydraulic calculation and supply-versus-demand analysis and correctly state whether the system passes, with all steps shown

Week 5: Can list the Michigan licensing and permit steps in order and name the enforcing authority for each

Week 6: Can produce a complete ITM task list with frequencies and pass criteria from memory, scoring at least 80% on a self-made quiz

Week 8: Practice exam score of at least 80% overall with no domain below 70%, and every missed question logged with a corrected explanation