Site preparation, footing and foundation construction, and concrete placement are where Michigan's climate does the most damage. Items test grade and drainage, frost-depth footings, reinforcement and anchor placement, air entrainment, and cold-weather practice.
Core rules
- Grade: finish grade slopes away from the foundation, about 6 in. within the first 10 ft. Strip topsoil before footing excavation.
- Footings: minimum 6 in. thick, sized from the load and soil-bearing values, bearing on undisturbed soil below frost depth.
- Foundation walls: minimum 2,500 psi concrete; anchor bolts at least 1/2 in. diameter, spaced no more than 6 ft on center and within 12 in. of wall ends and corners.
- Drainage: footing drain tile, washed gravel, filter fabric, and damp-proofing or waterproofing before backfill. Backfill after the foundation inspection, in compacted lifts.
- Air entrainment: Michigan freeze-thaw exposure calls for roughly 5–7% entrained air, with a low water-cement ratio - not extra cement to compensate.
- Cold weather: protect fresh concrete once air temperature approaches 40°F and falling; maintain curing temperature and never place on frozen subgrade.
Worked example
A 24 ft x 30 ft garage slab at 4 in. thick: 720 sq ft x (4 ÷ 12) ft = 240 cu ft, and 240 ÷ 27 = 8.9 cu yd. Add 5% waste for grade variation and spillage: 8.9 x 1.05 = 9.3, so order 9.5 cu yd. Ordering 8.9 cu yd leaves the last third of the slab short.
Traps that cost marks
Using slab thickness in inches without converting to feet; backfilling before the foundation inspection; assuming 3,000 psi mix makes air entrainment unnecessary; setting anchor bolts after the pour; sloping grade toward the house to "drain the yard."