MI General Contractor study plan

MI General Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Michigan residential building code and construction standards

  • Map the Michigan Residential Code (MRC) chapter structure to the seven exam domains and mark which chapters feed Domains 1, 4, 5, and 6.

  • Read the MRC chapters on building planning (egress, ceiling height, light/ventilation, room dimensions) and write a one-line rule summary for each requirement you encounter.

  • Locate the Michigan-specific amendments to the IRC base code and list at least eight that change residential practice versus the model code.

  • Build a personal code index (chapter, section number, plain-English rule) that you will keep adding to all eight weeks.

Your checkpoint

A tabbed code index covering MRC building-planning chapters plus a written list of Michigan amendments, at least 40 indexed entries.

Week 2

Michigan residential building code and construction standards & Site work, foundations, and concrete

  • Work through MRC chapters on foundations and footings, converting each prescriptive table into a quick lookup note for footing width, depth, and reinforcement.

  • Cross-reference Domain 1 egress and stair requirements with the framing chapters so you can recall stair geometry, headroom, and guard rules without notes.

  • Solve at least 15 practice calculations on footing size, frost depth, and concrete volume by hand, then recheck them against the code tables.

  • Draft a one-page cheat sheet of the ten code numbers you forget most often (rise/run, guard height, handrail height, egress opening, etc.).

Your checkpoint

A completed calculation worksheet of 15 solved footing/concrete problems with the governing code section cited for each.

Week 3

Site work, foundations, and concrete

  • Sequence a residential foundation build from excavation through backfill and write the inspection checkpoints the local building department will look for at each stage.

  • Explain in writing how soil bearing capacity, frost-protected shallow foundations, and drainage detailing change footing design for Michigan freeze conditions.

  • Practice identifying concrete defects (honeycomb, cold joints, scaling, efflorescence, shrinkage cracks) and write the likely cause and corrective action for each.

  • Review MRC requirements for foundation drainage, dampproofing/waterproofing, and anchor bolt placement, and turn them into a field checklist.

Your checkpoint

A foundation phase checklist with inspection hold points, defect diagnosis table, and cited code sections.

Week 4

Framing, carpentry, and structural systems

  • Read the MRC wall-framing, floor-framing, and ceiling/roof-framing chapters and record prescriptive spans, notch and hole limits, and bearing requirements in your index.

  • Draw a labeled framing plan for a simple two-story house showing headers, jack/trimmer studs, blocking, and lateral bracing locations.

  • Work through at least 12 practice items on floor joist sizing, cantilevers, and beam spans using the code tables, showing your table lookup path.

  • Summarize the load path from roof to footing in one paragraph you can recite, naming each transfer point.

Your checkpoint

A hand-drawn framing plan with a legend plus 12 solved span/notch problems, each citing the table used.

Week 5

Business management, contracts, and Michigan licensing law & Estimating, plan reading, and project scheduling

  • Outline Michigan licensing law for residential builders: licensure thresholds, the residential builder and maintenance/alteration license classes, and what work requires a licensed contractor.

  • Summarize the contract and consumer-protection obligations that show up on exams, including written contract contents, right-to-cancel, deposit limits, and lien notice requirements.

  • Build a takeoff for one small project (a garage slab or a simple addition) covering excavation, concrete, framing lumber, sheathing, roofing, and insulation with waste factors.

  • Produce a simple critical-path schedule for that same project in a spreadsheet or on paper, identifying the inspection-driven predecessors.

Your checkpoint

A one-page project package: quantity takeoff with waste factors, cost summary, and a bar-chart schedule showing the critical path.

Week 6

Estimating, plan reading, and project scheduling & Roofing, insulation, and weatherproofing

  • Practice reading a full plan set: identify plan, elevation, section, and detail sheets and extract at least 20 dimensions or specifications from them without a legend.

  • Explain roof framing and waterproofing assemblies in writing: underlayment, ice dam protection, flashing at valleys and sidewalls, and venting.

  • Summarize MRC insulation and energy-envelope requirements for Michigan climate zone, including ceiling, wall, and slab R-values and air-sealing details.

  • Reconcile a material takeoff against a plan set to find at least three deliberate errors or omissions you plant in your own practice drawings.

Your checkpoint

A plan-reading exercise sheet: 20 extracted specs, a flashing/waterproofing detail sketch, an R-value table for the Michigan zone, and three discrepancies you found and corrected.

Week 7

Business management, contracts, and Michigan licensing law & Safety, lead and asbestos, and jobsite regulation

  • List the jobsite safety obligations that fall on a residential contractor: fall protection thresholds, scaffold and ladder rules, excavation cave-in protection, and housekeeping.

  • Summarize lead-safe renovation rules (RRP applicability, containment, cleaning verification) and asbestos handling limits for a contractor who is not a abatement specialist.

  • Draft the business-management items an exam will test: estimating markup versus margin, change orders, retainage, workers' compensation, and recordkeeping.

  • Write a 10-question self-quiz on licensing and safety law and score yourself, then re-study every item you missed.

Your checkpoint

A two-page safety and business-law summary sheet plus a scored 10-question self-quiz with corrections.

Week 8

Michigan residential building code and construction standards & Business management, contracts, and Michigan licensing law & Estimating, plan reading, and project scheduling & Site work, foundations, and concrete & Framing, carpentry, and structural systems & Roofing, insulation, and weatherproofing & Safety, lead and asbestos, and jobsite regulation

  • Take two full-length timed practice exams and record your percentage by domain to find remaining weak areas.

  • Re-study only the two lowest-scoring domains using your code index, and rewrite any index entry you could not recall under time pressure.

  • Drill 30 rapid-recall items on code numbers, licensing thresholds, and safety limits until you can answer in under 30 seconds each.

  • Finalize a one-page pre-exam review sheet you will read the morning of the test.

Your checkpoint

Two scored practice exams with a domain-by-domain score table and a finished one-page pre-exam review sheet.

Milestones

Week 2: Code index has at least 40 entries and you can state the MRC egress, stair, and guard dimensions from memory.

Week 4: You can complete a framing plan and solve a joist-span table lookup without referring to worked examples, scoring 80% or better on a self-made 12-item framing quiz.

Week 5: You can produce a takeoff and a critical-path schedule for a small project in under 90 minutes with no missing major cost line.

Week 6: You extract 20 plan specifications accurately and can explain roof flashing and Michigan insulation R-values without notes.

Week 7: You score 8 of 10 or better on the licensing and safety self-quiz.

Week 8: Both timed practice exams scored, with every domain at 75% or higher and a written list of remaining weak spots.