MI Land Surveyor flashcards
MI Land Surveyor · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Monument controls distance
- In boundary retracement, an original monument called for in a deed or plat generally prevails over a stated distance or area when the monument is identifiable and undisturbed.
- Lost corner
- A corner whose original position cannot be recovered from physical evidence or reliable testimony; it is restored by proportionate measurement between the nearest existing original corners using record distances.
- Meander line
- A survey line run along a water body to determine area, not a boundary; the legal water boundary is the ordinary high water mark or thread of the stream.
- Michigan adverse possession period
- Michigan's adverse possession statute generally requires 15 years of open, notorious, hostile, exclusive, and continuous possession; prescriptive easements also use a 15-year period without the exclusivity element.
- Riparian rights Great Lakes
- Upland owners bordering the Great Lakes have rights of access, wharfing, and reasonable use, but the state holds bottomlands in trust; the boundary is the ordinary high water mark.
- Prescriptive easement
- A right to use another's land arising after 15 years of open, notorious, adverse, and continuous use in Michigan, without permission; unlike adverse possession, exclusivity is not required.
- Practical location doctrine
- A boundary established by adjoining owners' long-standing treatment and agreement, recognized in Michigan even when it differs from the deed line, if the location was known and accepted.
- State plane combined factor
- Combined factor equals grid scale factor times elevation factor; grid distance equals ground distance times combined factor, and ground distance equals grid distance divided by combined factor.
- Geoid model
- A model of the geoid, such as GEOID18, used with GNSS ellipsoid heights to compute orthometric heights: H equals ellipsoid height h minus geoid undulation N.
- Differential leveling HI
- Height of instrument equals backsight elevation plus backsight rod reading; a new point elevation equals height of instrument minus the foresight rod reading.
- OPUS
- Online Positioning User Service, an NGS utility that post-processes submitted static GNSS observations against continuously operating reference stations and returns computed coordinates and a solution report.
- Real-time network
- A network of continuously operating GNSS reference stations that broadcasts corrections for RTK positioning; Michigan's MSRN is an example used for survey control.
- Angular traverse closure
- For a closed polygon, the sum of interior angles should equal (n minus 2) times 180 degrees; the difference is angular misclosure, distributed before computing coordinates.
- Compass rule
- A traverse adjustment that distributes latitude and departure misclosures in proportion to line lengths; each line correction equals total misclosure times line length divided by perimeter.
- Cut and fill
- The vertical difference between existing ground and design grade; cut occurs where ground is above design, fill where ground is below, and stakes show the difference at an offset.
- Horizontal curve tangent
- Tangent distance T equals radius R times tangent of half the central angle delta; it runs from the point of curvature or point of tangency to the point of intersection.
- Circular curve length
- Arc length L equals radius R times the central angle delta in radians, or pi times R times delta divided by 180 when delta is in degrees.
- Long chord
- The straight chord from the point of curvature to the point of tangency of a circular curve; its length equals 2R sin(delta/2).
- Vertical curve K value
- K equals curve length L divided by algebraic grade difference A in percent; L equals K times A, and K indicates curve length per one percent grade change.
- Pipe invert
- The inside bottom elevation of a pipe; crown equals invert plus diameter, and pipe slope equals invert drop divided by horizontal length between points.
- Michigan Land Division Act
- Michigan statute, MCL 560.101 et seq., that governs subdivision plats and land divisions; it sets approval, review, and recording requirements and is implemented through local ordinances.
- Preliminary plat
- A proposed subdivision layout submitted for local review before the final plat; approval may be conditioned and can expire if the final plat is not filed within the required period.
- Final plat recording
- After local approval and required certificates, including the treasurer's tax certificate, the final plat is recorded with the county register of deeds, creating lots and rights-of-way.
- Zoning setback
- The minimum required distance between a building or structure and a lot line, established by zoning ordinance; a setback is not an easement and does not transfer property rights.
- Detention basin
- A stormwater facility that temporarily stores runoff and releases it at a controlled rate to reduce peak downstream flows; design must meet local and Michigan EGLE requirements.
- Nonconforming use
- A use or structure that lawfully existed before a zoning ordinance but does not meet current standards; it generally may continue but cannot be expanded without approval.
- Professional surveyor seal
- A licensed surveyor's seal and signature certify that the work was performed by or under the licensee's responsible charge and meets applicable legal and technical standards.
- Standard of care
- The degree of care and skill ordinarily exercised by reputable surveyors under similar circumstances; a breach can support a negligence claim, usually established through expert testimony.
- Conflict of interest
- A financial or personal interest that could impair professional judgment; it must be disclosed and avoided, especially when a surveyor might benefit from a boundary determination.
- ALTA/NSPS survey
- A land title survey meeting the current ALTA/NSPS Minimum Standard Detail Requirements and negotiated Table A items; it supports title insurance but is not a title guarantee.
- Retention of field notes
- Surveyors should retain field notes, computations, and correspondence that document the basis of surveys; these records are evidence in boundary disputes and support defensible professional decisions.
- Unauthorized practice
- Offering or performing land surveying without a Michigan license; unlicensed staff must work under a licensed surveyor's responsible charge, and violations can lead to penalties.