MI Well Driller study materials
MI Well Driller study resources

MI Well Driller cheat sheet

MI Well Driller · Keep the key ideas within reach.

Quick reference

Well Siting and Geology

  • Setback rule of thumb for a new well: locate as far as practical and upgradient from septic systems, barnyards, fuel storage, and road salt storage; separation distances are measured horizontally from the wellhead to the nearest edge of the pollution source.

  • Michigan glacial geology controls yield: outwash sand and gravel and esker/kame deposits give the highest specific capacity; till and lacustrine clay give low yields and perched water; bedrock aquifers (Marshall, Saginaw, Traverse) vary widely by fracture density.

  • Confined aquifers sit beneath a low-permeability confining layer (clay till, shale) and produce artesian rise; unconfined aquifers respond quickly to precipitation and are more vulnerable to surface contamination.

  • Static water level is measured before pumping; pumping water level is measured during stabilized pumping; drawdown = pumping level minus static level.

  • Specific capacity = pumping rate (gpm) divided by drawdown (ft); a declining specific capacity over years signals plugging, encrustation, or regional decline.

  • A well sited in a floodplain must have the casing extended and the wellhead sealed so that floodwater cannot enter; finished grade must drain away from the wellhead.

  • Test-hole logs (driller's log of depth, material, and water strikes) are the primary siting tool; a nearby log is not a substitute for a test hole on the parcel.

  • Karst and fractured-bedrock settings require extra casing depth to seal off solution openings and shallow fracture zones that transmit surface water.

Quick reference

Well Construction and Casing

  • Casing must extend from the wellhead to a depth that seals off unconsolidated material and shallow contaminated water and reaches competent, low-permeability formation or bedrock.

  • Annular space must be large enough to place a tremie pipe and grout column; typical minimum is 2 in of annular clearance, and larger holes are needed for deep grout placement.

  • Well screen slot size is selected to retain the formation: use a sieve analysis of the aquifer sample; slot openings are commonly sized to pass 40-50% of the formation material.

  • A gravel pack is placed where the formation is fine or uniform; the pack grain size is typically 4-6 times the formation D50, and the screen slot retains the pack.

  • Centralizers keep the casing centered in the borehole so the grout seal has uniform thickness on all sides.

  • The wellhead must terminate above grade (commonly at least 12 in, and higher in flood-prone areas) with a sanitary, vermin-proof cap and a grout seal at the surface.

  • Drive shoe on the bottom of the casing protects the casing and provides a seal as it is driven into firm material.

  • Plumbness and alignment checks are made before setting the pump; excessive deviation can prevent pump installation and damage the pump assembly.

Quick reference

Grouting and Sealing

  • Neat cement grout is mixed at no more than 6 gallons of water per 94-lb sack of cement; bentonite-based grout is mixed per the manufacturer's ratio, and extra water weakens the seal and causes shrinkage.

  • Place grout by the tremie method from the bottom of the annular space upward so the grout displaces drilling fluid and does not bridge or channel.

  • Grout volume estimate: annular volume = 0.7854 x (hole diameter squared minus casing OD squared) x height; add 10-25% for lost circulation and washouts.

  • Bentonite grout shrinks slightly on curing and can crack; cement-bentonite or neat cement is preferred where a permanent, low-permeability seal is required.

  • Never grout through a casing that is full of drilling fluid without a tremie; dropping grout from the top causes segregation and voids.

  • Surface seal: a grout collar at the wellhead, typically at least 2 in thick and extending outward, sheds surface water and prevents annular entry.

  • Grouting a well that penetrates multiple aquifers must seal the annulus over the full length of casing so that aquifers are not cross-connected.

  • Verify grout returns at the surface where possible; missing returns indicate loss to a void or fracture and require additional grout.

Quick reference

Well Development and Pumping Equipment

  • Development removes drilling fluid, fines, and filter cake; methods include surging, jetting, air-lifting, and overpumping, and are continued until discharge runs clear.

  • Development is done before the pump is set and before the final disinfection; overpumping during development must not exceed the screen's collapse strength.

  • Pump setting depth must keep the pump submerged below the pumping water level by the manufacturer's minimum submergence (often 10-20 ft) to avoid cavitation and overheating.

  • Submersible pump sizing: match the pump curve to the well yield so the operating point falls in the efficient range and does not draw the well down below the pump intake.

  • Drop pipe, torque arrestor, and check valve installation: a check valve above the pump holds the column of water and prevents backspin on shutdown.

  • Pump capacity in gpm and total dynamic head (TDH) in ft determine motor horsepower; TDH = pumping lift + discharge head + friction losses.

  • Sanitary well cap and vented, screened vent allow air movement while keeping insects and surface water out; the conduit to the pitless adapter must be watertight.

  • Pitless adapter allows the discharge line to pass through the casing below frost depth while keeping the wellhead sealed.

Quick reference

Water Quality and Sampling

  • Sample before any treatment or softener, and preferably before the pressure tank, from a clean, disinfected sampling point; do not sample through a hose or an aerator.

  • Bacteriological sampling: use a sterile bottle with sodium thiosulfate, fill to the line, leave air space, chill, and submit within the holding time (commonly 24-30 hours).

  • Coliform presence indicates a pathway for surface contamination; E. coli presence indicates fecal contamination and requires investigation, disinfection, and retesting.

  • Common Michigan groundwater concerns: arsenic (especially in some bedrock and outwash areas), nitrate from septic and agriculture, iron and manganese staining, hardness, and radon.

  • Nitrate above 10 mg/L as N is the drinking-water standard; nitrate in a well often signals a failing septic system or fertilizer influence nearby.

  • Shock chlorination: calculate volume of water in the well and plumbing, add chlorine to reach roughly 50-200 mg/L, circulate, hold, then flush until chlorine is gone and retest.

  • Field meters need calibration before each sampling day; pH, temperature, and specific conductance are measured in a flow cell or in a clean container at the wellhead.

  • Chain of custody and proper labeling (site, date, time, sampler, analysis requested) are required for a defensible water-quality result.

Quick reference

Well Abandonment and Plugging

  • Abandonment is required when a well is no longer used, is unsafe, or cannot be repaired; a well that is not properly plugged is a direct pathway for contamination into the aquifer.

  • Remove the pump, drop pipe, and any obstructions first; then fill the well from the bottom up with an approved plugging material.

  • Approved plugging materials include neat cement grout, cement-bentonite, bentonite chips or pellets, and sand or gravel only where specified for the lower portion below the seal.

  • Placement by tremie is required so the material fills the full column without bridging; free-falling material can leave voids and channels.

  • Casing should be cut off below grade (commonly at least 3 ft below ground surface) and the remaining hole filled and capped so the site drains and the location is not a hazard.

  • A plugged well must be documented: depth, diameter, materials used, volumes, date, and method, and the record provided to the owner and the state.

  • Flowing artesian wells require a plugging material that sets under pressure and a seal deep enough to control the flow before the upper casing is cut.

  • Abandoned wells that penetrate multiple aquifers must be sealed across each aquifer so that cross-connection between aquifers does not occur.

Quick reference

Michigan Well Construction Regulations

  • Michigan regulates water well construction under the state's water well statute and administrative rules; a driller must hold the appropriate state-issued well drilling credential to construct, alter, or plug a well.

  • A well record (driller's log) must be completed for each well and filed with the state within the required time, listing depth, casing, screen, grout, and water-bearing zones.

  • Casing and grout requirements set minimum depths and wall thicknesses; the casing must be new, sound, and free of joints that leak.

  • Wells must be disinfected after construction and before being placed in service; a bacteriological sample is collected after disinfection clears.

  • Setbacks from sources of contamination (septic systems, sewers, fuel tanks, animal lots) are specified in rule and measured from the wellhead.

  • Plugging of abandoned wells must follow the state's approved methods and materials; a plugging record is filed with the state.

  • Changes to a well (deepening, re-casing, pump replacement that opens the seal) may require a permit or notification; check the local health department and state requirements before work.

  • Local health departments may impose additional requirements, so verify local rules in addition to state rules before siting or constructing.

Quick reference

Safety and Jobsite Practices

  • Before drilling, call 811 for utility locates and wait the required notice period; never assume a line is absent because the area looks clear.

  • Confined space entry (pit, vault, large-diameter well) requires air monitoring for oxygen and toxic gases, a permit, an attendant, and retrieval equipment.

  • Rigging and hoisting: know the load rating of cables, slings, and the derrick; keep personnel out from under suspended loads and never ride the traveling block.

  • Rotating equipment hazards: no loose clothing, jewelry, or long hair near the rotary table; lock out and tag out before servicing the rig or pump.

  • Electrical safety around submersible pumps: de-energize and verify at the panel before pulling a pump; use GFCI protection on jobsite circuits.

  • Silica dust from drilling and cutting is a respiratory hazard; use water or dust suppression and wear appropriate respiratory protection.

  • Chemical handling: store and mix grout, chlorine, and drilling fluids per the SDS; provide eye wash and spill containment, and keep chlorine away from acids.

  • Heat and cold stress, hearing protection near the rig, and a stocked first-aid kit are standard jobsite requirements; know the emergency address for the 911 call.