MI Well Driller study plan
MI Well Driller · Give each week a clear focus.
8 weeks · About 7 hours per week
Well Construction and Casing & Michigan Well Construction Regulations
Map every Michigan well construction rule (casing depth, casing material, annular space, well cap, pitless adapter, minimum setbacks) into a one-page checklist keyed to the regulation domain
Label a blank well cross-section diagram with each casing string, screen or open-hole interval, grout zone, and surface seal, and state the purpose of each component aloud
Compare single-casing, telescoped, and conductor-cased designs by listing two site conditions that force each choice
Compute required casing length for three sample wells given overburden depth, bedrock depth, and required seat depth into rock
Your checkpoint
One-page Michigan casing and construction compliance checklist plus a fully labeled well cross-section diagram
Well Construction and Casing & Grouting and Sealing
Sequence the construction steps from hole advancement through grout placement, cap installation, and development, and justify why grouting precedes development
Distinguish neat cement, bentonite, and cement-bentonite grouts by when each is appropriate and which conditions rule each out
Calculate grout volume for a given borehole diameter, casing outer diameter, and sealed interval, including a percent excess allowance
Explain positive-placement (tremie) grouting from the bottom up and identify three field errors that create voids or bridging
Your checkpoint
Grout volume worksheet with three worked calculations and a written rationale for each grout type selection
Well Siting and Geology & Grouting and Sealing
Read a topographic map and a geologic map of Michigan together to propose a well location and defend it against setback and drainage concerns
Classify glacial deposits (outwash, till, lacustrine clay, bedrock) and predict their effect on yield, sand production, and casing decisions
Identify contamination pathways (failed grout, unsealed annular space, poor surface drainage, nearby sources) and prescribe the sealing fix for each
Describe how aquifer confinement and static water level influence both grout design and screen or open-hole selection
Your checkpoint
Written site assessment for a hypothetical Michigan parcel: proposed location, expected geology, casing and grout plan, and risk list
Well Development and Pumping Equipment & Safety and Jobsite Practices
Compare development methods (surging, jetting, bailing, air lifting, overpumping) by mechanism, suitable formation, and risk of damage
Size a pump for a given yield, total dynamic head, and drawdown, and explain how pump setting depth relates to static and pumping levels
List jobsite hazards for drilling operations (rotating equipment, high-pressure air, electrical, confined spaces, rigging) and the control for each
Draft a pre-task safety brief covering utility locating, rig setup and stabilization, and spoil handling
Your checkpoint
Pump sizing calculation with a development-method selection table and a one-page jobsite safety brief
Water Quality and Sampling & Well Development and Pumping Equipment
Explain proper sampling procedure: purge volume, stabilization parameters, container and preservation requirements, holding times, and chain of custody
Interpret a lab report by matching each result to the likely source (arsenic and geology, nitrate and land use, coliform and well integrity, iron and manganese and aesthetic issues)
Distinguish sampling errors from real water quality problems and state the resampling step for each
Describe disinfection after construction or repair and how it interacts with development and with sampling timing
Your checkpoint
Completed sample collection and chain-of-custody protocol with a mock lab report interpretation write-up
Well Abandonment and Plugging & Michigan Well Construction Regulations
List the conditions that trigger well abandonment and the required notification and recordkeeping steps
Sequence plugging procedure: remove obstructions, disinfect, place plugging material by the approved method, seal the upper portion, restore the site, and file the record
Select plugging material and method for flowing wells, artesian conditions, wells with casing to be removed, and wells penetrating multiple aquifers
Cross-check the abandonment rules against construction rules to catch provisions that differ between active and abandoned wells
Your checkpoint
Abandonment plan for two contrasting scenarios (flowing artesian well and shallow screened well) with step-by-step procedure and materials
Michigan Well Construction Regulations & Well Siting and Geology
Recite the setback distances, casing requirements, and permit and reporting obligations from memory, then verify each against source material
Trace the regulatory path for a new well from permit application through final inspection and record submission
Identify the three regulation points you miss most often in practice and build a personal correction card for each
Revisit the week 1 siting exercise and revise it to satisfy every regulatory requirement
Your checkpoint
Closed-book regulation self-quiz scored and corrected, plus a personal correction card of weak provisions
Well Siting and Geology & Well Construction and Casing & Grouting and Sealing & Well Development and Pumping Equipment & Water Quality and Sampling & Well Abandonment and Plugging & Michigan Well Construction Regulations & Safety and Jobsite Practices
Take two full-length timed practice exams and log every missed item by domain
Re-study only the two lowest-scoring domains using your own notes and the correction cards
Explain aloud, without notes, the full life cycle of a well from siting through abandonment
Confirm exam-day logistics: identification, approved calculators, timing, and question strategy
Your checkpoint
Scored practice exam log with a written remediation summary for the two weakest domains
Milestones
Week 2: Can label a well cross-section and compute grout volume for a new borehole without reference material
Week 4: Can size a pump from yield and head data and state the development method for a given formation, scoring 80% or better on a self-made 20-question quiz covering domains 1-4 and 8
Week 6: Can write a compliant abandonment procedure from memory and list the regulatory differences between active and abandoned wells
Week 8: Score 80% or better on both timed practice exams with no single domain below 70%