MI Well Driller study materials
MI Well Driller study resources

MI Well Driller study plan

MI Well Driller · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Well Construction and Casing & Michigan Well Construction Regulations

  • Map every Michigan well construction rule (casing depth, casing material, annular space, well cap, pitless adapter, minimum setbacks) into a one-page checklist keyed to the regulation domain

  • Label a blank well cross-section diagram with each casing string, screen or open-hole interval, grout zone, and surface seal, and state the purpose of each component aloud

  • Compare single-casing, telescoped, and conductor-cased designs by listing two site conditions that force each choice

  • Compute required casing length for three sample wells given overburden depth, bedrock depth, and required seat depth into rock

Your checkpoint

One-page Michigan casing and construction compliance checklist plus a fully labeled well cross-section diagram

Week 2

Well Construction and Casing & Grouting and Sealing

  • Sequence the construction steps from hole advancement through grout placement, cap installation, and development, and justify why grouting precedes development

  • Distinguish neat cement, bentonite, and cement-bentonite grouts by when each is appropriate and which conditions rule each out

  • Calculate grout volume for a given borehole diameter, casing outer diameter, and sealed interval, including a percent excess allowance

  • Explain positive-placement (tremie) grouting from the bottom up and identify three field errors that create voids or bridging

Your checkpoint

Grout volume worksheet with three worked calculations and a written rationale for each grout type selection

Week 3

Well Siting and Geology & Grouting and Sealing

  • Read a topographic map and a geologic map of Michigan together to propose a well location and defend it against setback and drainage concerns

  • Classify glacial deposits (outwash, till, lacustrine clay, bedrock) and predict their effect on yield, sand production, and casing decisions

  • Identify contamination pathways (failed grout, unsealed annular space, poor surface drainage, nearby sources) and prescribe the sealing fix for each

  • Describe how aquifer confinement and static water level influence both grout design and screen or open-hole selection

Your checkpoint

Written site assessment for a hypothetical Michigan parcel: proposed location, expected geology, casing and grout plan, and risk list

Week 4

Well Development and Pumping Equipment & Safety and Jobsite Practices

  • Compare development methods (surging, jetting, bailing, air lifting, overpumping) by mechanism, suitable formation, and risk of damage

  • Size a pump for a given yield, total dynamic head, and drawdown, and explain how pump setting depth relates to static and pumping levels

  • List jobsite hazards for drilling operations (rotating equipment, high-pressure air, electrical, confined spaces, rigging) and the control for each

  • Draft a pre-task safety brief covering utility locating, rig setup and stabilization, and spoil handling

Your checkpoint

Pump sizing calculation with a development-method selection table and a one-page jobsite safety brief

Week 5

Water Quality and Sampling & Well Development and Pumping Equipment

  • Explain proper sampling procedure: purge volume, stabilization parameters, container and preservation requirements, holding times, and chain of custody

  • Interpret a lab report by matching each result to the likely source (arsenic and geology, nitrate and land use, coliform and well integrity, iron and manganese and aesthetic issues)

  • Distinguish sampling errors from real water quality problems and state the resampling step for each

  • Describe disinfection after construction or repair and how it interacts with development and with sampling timing

Your checkpoint

Completed sample collection and chain-of-custody protocol with a mock lab report interpretation write-up

Week 6

Well Abandonment and Plugging & Michigan Well Construction Regulations

  • List the conditions that trigger well abandonment and the required notification and recordkeeping steps

  • Sequence plugging procedure: remove obstructions, disinfect, place plugging material by the approved method, seal the upper portion, restore the site, and file the record

  • Select plugging material and method for flowing wells, artesian conditions, wells with casing to be removed, and wells penetrating multiple aquifers

  • Cross-check the abandonment rules against construction rules to catch provisions that differ between active and abandoned wells

Your checkpoint

Abandonment plan for two contrasting scenarios (flowing artesian well and shallow screened well) with step-by-step procedure and materials

Week 7

Michigan Well Construction Regulations & Well Siting and Geology

  • Recite the setback distances, casing requirements, and permit and reporting obligations from memory, then verify each against source material

  • Trace the regulatory path for a new well from permit application through final inspection and record submission

  • Identify the three regulation points you miss most often in practice and build a personal correction card for each

  • Revisit the week 1 siting exercise and revise it to satisfy every regulatory requirement

Your checkpoint

Closed-book regulation self-quiz scored and corrected, plus a personal correction card of weak provisions

Week 8

Well Siting and Geology & Well Construction and Casing & Grouting and Sealing & Well Development and Pumping Equipment & Water Quality and Sampling & Well Abandonment and Plugging & Michigan Well Construction Regulations & Safety and Jobsite Practices

  • Take two full-length timed practice exams and log every missed item by domain

  • Re-study only the two lowest-scoring domains using your own notes and the correction cards

  • Explain aloud, without notes, the full life cycle of a well from siting through abandonment

  • Confirm exam-day logistics: identification, approved calculators, timing, and question strategy

Your checkpoint

Scored practice exam log with a written remediation summary for the two weakest domains

Milestones

Week 2: Can label a well cross-section and compute grout volume for a new borehole without reference material

Week 4: Can size a pump from yield and head data and state the development method for a given formation, scoring 80% or better on a self-made 20-question quiz covering domains 1-4 and 8

Week 6: Can write a compliant abandonment procedure from memory and list the regulatory differences between active and abandoned wells

Week 8: Score 80% or better on both timed practice exams with no single domain below 70%