Myanmar Matriculation Geography study materials
Myanmar Matriculation Geography study resources

Myanmar Matriculation Geography case studies

Myanmar Matriculation Geography · Put your knowledge to work in context.

The Myanmar Matriculation Geography examination is the Geography paper taken at the end of Grade 12 under the national school system administered by the မြန်မာနိုင်ငံစာစစ်ဦးစီးဌာန (Myanmar Examinations Department), one of the departments listed under the Ministry of Education. It is intended for Grade-12 candidates completing upper secondary schooling who need a Geography result for university admission and for their final school record. The Myanmar Matriculation Geography case studies are 5 cases and about 3,942 words.

1

Siltation Risk and the Choice Between Upstream Treatment and Dredging

A catchment of 42 km² drains into a proposed irrigation reservoir at a gorge in Magway Region. Mean annual rainfall is 680 mm, about 80% of it falling between mid-July and mid-September, often in two or three intense storms.

756 words, about 4 min
2

Choosing One Capital Project for a Peri-Urban Ward

Ward 7 on the edge of Yangon Region grew from 21,000 to 28,400 residents between 2014 and 2019. A household survey found 31% of residents under 15, 29% aged 15–29, 34% aged 30–59 and 6% aged 60 and over.

738 words, about 4 min
3

Two Candidate Rural Roads and a Fixed Budget

A development fund can finance one rural road upgrade. Option A is 38 km of earth track in a township in the Chin Hills, serving about 9,000 people in 22 villages.

816 words, about 4 min
4

River Direction, Intervisibility and a School Site on a 1:50,000 Sheet

The extract covers a 10 km by 10 km area of hill country on a 1:50,000 sheet; each grid square is 2 cm and represents 1 km, and the contour interval is 20 m. A river enters the area at grid 4125 (380 m) and leaves at grid 4431 (340 m).

848 words, about 4 min
5

Testing a Fertiliser Subsidy Recommendation Built on a Choropleth and a Correlation

Three students compare rice yields across three townships to advise the regional government where to target a fertiliser subsidy. They shade each township on a choropleth by average yield per square kilometre of township area, obtaining A 3.1 t/ha, B 4.6 t/ha and C 4.2 t/ha, and conclude that A is the priority.

784 words, about 4 min