Boiler Construction, Design and Fittings

  • ASME Section I governs power boilers over 15 psi steam; Section IV governs heating boilers at or below 15 psi steam and 160 psi/250 °F water.

  • MAWP is limited by the weakest pressure part; safety valve setting may not exceed MAWP, and the valve must be set at or below the design pressure stamped on the nameplate.

  • Minimum required safety valve relieving capacity for a steam boiler is established from ASME capacity tables using burner input or heating surface, not by the valve vendor's preference.

  • A steam boiler needs at least one safety valve; boilers with more than 500 sq ft of heating surface require two or more, sized so one valve's failure to open does not prevent relief.

  • Water column and gauge glass: lowest visible water level must be at least 2 in above the highest fire line or heating surface, verified by try cocks and a documented level reference.

  • Gauge glass connections require top and bottom shutoff valves plus a drain cock; the lower connection must be blown clear periodically to prove the passage is open.

  • Steam drum internals: dry pipe or steam separator removes moisture, baffles direct steam away from the water surface, and feedwater enters away from the gauge glass connections.

  • Hydrostatic test pressure for new construction is 1.5 times MAWP; for existing boilers under repair, ASME allows testing at the stamped MAWP with jurisdiction approval.

  • Expansion and support: boiler must be free to move on its supports; fixed and sliding supports, expansion joints in piping, and anchor points must not restrain thermal growth.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Pre-start purge: prove forced draft and induced draft fans running, then purge the furnace and gas passages with at least 4 air changes before any ignition attempt.

  • Light-off sequence: purge, prove flame scanner on the igniter, open the fuel valve only after igniter flame is proven, then prove main flame within the trial-for-ignition time.

  • Warm-up a cold boiler slowly: bring pressure up over 1 to 4 hours depending on size, keep drum metal temperature rise under roughly 100 °F per hour, and open superheater drains until steam flow exists.

  • Bottom blowdown is done at low to moderate firing with the boiler under load, one valve at a time, short duration; never blow down a boiler with no water or during a low-water condition.

  • Low-water cutoff trip test: lower the water level by evaporation or drain to the cutoff line and confirm burner shutdown and lockout; the test is done at operating pressure with the boiler firing.

  • Normal shutdown: reduce firing, blow down gauge glass and low-water cutoff, secure the burner after a post-purge, then close the main steam stop and allow the boiler to cool naturally.

  • Emergency shutdown: trip the burner, close the fuel supply valve at the burner and the main fuel shutoff, then close the main steam stop; do not dump water from a hot boiler.

  • After a flame failure or safety trip, investigate the cause and correct it before reset; the programmer must complete a full purge before the next light-off.

  • Record operating data at fixed intervals: steam pressure, water level, stack temperature, O2 or CO2, and feedwater flow; trends reveal fouling and tube leaks before failure.

Quick reference

Combustion, Fuels, Burners and Draft

  • Theoretical air for natural gas is about 10 cubic feet of air per cubic foot of gas; for No. 2 oil it is about 1,450 lb of air per 100 lb of oil.

  • Stoichiometric combustion of methane: CH4 + 2O2 gives CO2 + 2H2O; excess air is required to complete combustion, typically 15 to 25 percent for gas and 20 to 30 percent for oil.

  • Excess air too low raises CO and smoke; excess air too high lowers efficiency by raising stack loss. Tune to the lowest excess air that gives no CO rise and no smoke.

  • Stack loss is the largest efficiency loss; each 40 °F rise in flue gas temperature above the boiler water or steam temperature costs roughly 1 percent efficiency.

  • Draft is measured in inches of water column; natural draft depends on stack height and temperature difference, forced draft uses a fan before the burner, induced draft uses a fan after the boiler.

  • Furnace draft is normally held slightly negative, about 0.05 to 0.10 in wc, to prevent hot gas leakage and to keep the flame in the furnace.

  • Flame scanner must see only the flame it is meant to supervise; adjust sighting so it does not see the igniter, refractory glow, or the opposite burner's flame.

  • Fuel oil requires atomization and heating to control viscosity; cold or poorly atomized oil produces smoke, carbon buildup, and unstable flame.

  • Gas train components in order include manual shutoff, strainer, regulator, low and high gas pressure switches, safety shutoff valves with proof of closure, and a leak test valve.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • Required safety devices: safety valves, low-water fuel cutoff with manual reset, high steam pressure limit, flame safeguard, high gas or oil pressure switches, and low water alarm.

  • Safety valve must be tested by popping it at operating pressure; a valve that does not reseat or leaks after the test must be repaired or replaced by a qualified valve shop.

  • Low-water cutoff and gauge glass are checked daily or per shift; the cutoff float chamber is blown down and the cutoff is tested to prove burner shutdown.

  • High pressure limit switch and operating limit must be set below the safety valve setting, with a gap large enough to prevent nuisance trips yet protect the boiler.

  • Minnesota requires boilers and pressure vessels to be inspected by a state or commissioned inspector at intervals set by rule; operating boilers generally require annual inspection, and the certificate must be posted.

  • Minnesota boiler operation requires a licensed operator for boilers above the threshold horsepower set by statute; the license class and required attendance depend on boiler size and type.

  • Maintenance schedule: daily log readings, weekly safety valve try lever test if permitted, monthly low-water cutoff test, annual internal and external inspection.

  • Inspection preparation: cool the boiler, drain and open handholes and manholes, remove scale and soot, and provide safe access and lighting for the inspector.

  • Repairs to pressure parts require ASME code procedures, qualified welders, and jurisdiction notification; records of repairs and inspections must be retained.

Quick reference

Boiler Construction, Design and Fittings

  • Firetube boilers pass hot gas through tubes surrounded by water; watertube boilers pass water through tubes surrounded by hot gas and are preferred for high pressure and large capacity.

  • A firetube boiler shell is limited in diameter by the code, so capacity is increased by adding length and tubes; watertube boilers scale to large capacity by furnace size and tube count.

  • Staybolts and stays support flat surfaces such as tube sheets and furnace sheets; broken or wasted stays reduce the allowable pressure and must be replaced.

  • Crown sheet of a firebox boiler is the most highly stressed area; low water exposes it to flame and can cause collapse, which is why low-water protection is critical.

  • Superheater raises steam temperature above saturation; it must have steam flow for cooling, so drains are opened during warm-up and the superheater is protected during light-off.

  • Economizer recovers heat from flue gas to preheat feedwater; it must have water flow before firing and a bypass for startup to prevent steaming in the economizer.

  • Air preheater recovers heat from flue gas to warm combustion air; it improves efficiency but can cause cold-end corrosion if metal temperature drops below the acid dew point.

  • Boiler fittings: pressure gauge with siphon and shutoff, water column, gauge glass, try cocks, safety valve, main steam stop, feedwater check and stop valves, and blowdown valves.

  • The pressure gauge must be connected to the highest part of the steam space, with a siphon coil to protect it from steam temperature, and it must read accurately at the working pressure.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Before lighting off, confirm the boiler is filled to the proper level, all drains and vents are positioned correctly, and the fuel supply is proven available at the required pressure.

  • Cold start with a warm-up burner or low fire; raise pressure slowly and check for leaks, unusual noise, and expansion movement at the supports.

  • When paralleling a boiler to a header, open the main steam stop slowly and warm the line; match pressure and open the stop only after the line is drained and warmed.

  • Water level control: maintain level at the normal operating line, use a three-element feedwater control for large boilers, and never rely on a single indication.

  • Foaming and carryover are caused by high dissolved solids, high alkalinity, or oil contamination; blow down and test boiler water, and treat as required.

  • Priming is a sudden carryover of water with steam; reduce firing, lower water level to normal, and investigate the cause before returning to full load.

  • Caustic embrittlement and corrosion are controlled by water chemistry: maintain pH, control dissolved oxygen with deaeration and oxygen scavenger, and limit dissolved solids.

  • Shutdown for inspection: cool slowly, drain after the boiler is below 200 °F, open to air, and clean waterside and fireside before the inspector arrives.

  • Layup: wet layup uses treated water with an oxygen scavenger and a nitrogen blanket; dry layup uses desiccant and sealed openings to prevent corrosion.

Quick reference

Combustion, Fuels, Burners and Draft

  • Combustion requires fuel, oxygen, heat, and a chain reaction; removing any one stops combustion, which is the basis of fuel shutoff and purging.

  • Air-fuel ratio control: the burner management system positions the fuel valve and air damper together; a cam or linkage mismatch causes smoke or high CO.

  • Natural gas is lighter than air and rises; propane is heavier than air and settles in low areas, so gas detection placement differs by fuel.

  • Fuel oil systems require a return line and a preheater; No. 6 oil needs heating to about 150 to 200 °F to reach the atomizing viscosity.

  • Burner turndown is the ratio of maximum to minimum firing rate; a 10:1 turndown allows stable low fire without cycling on and off.

  • Airflow proving: an air flow switch or differential pressure switch must prove combustion air before the fuel valve opens.

  • Draft loss or furnace pressurization can result from a blocked flue, a failed induced draft fan, or a closed damper; the burner must trip on loss of draft.

  • O2 trim adjusts excess air continuously; a reading of 3 percent O2 in flue gas corresponds to roughly 15 to 18 percent excess air for natural gas.

  • Flame failure response time must be fast enough to prevent fuel accumulation; the flame safeguard locks out the burner and requires a manual reset after a lockout.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • The safety valve is the final overpressure protection; it must be piped to a safe discharge point, with no valve or restriction between the boiler and the valve.

  • A safety valve that weeps or does not reseat must not be plugged, capped, or wired shut; it must be repaired or replaced.

  • Low-water fuel cutoff must be tested with the burner firing; the test proves the cutoff stops fuel and that the manual reset prevents restart until water is restored.

  • The flame safeguard programmer controls purge, trial for ignition, and lockout timing; never bypass it or jumper the flame scanner to keep a boiler running.

  • Combustion air and ventilation openings must be kept clear; a boiler room needs adequate combustion air and a high and low opening for ventilation.

  • Minnesota boiler inspection: the owner must have the boiler inspected and the certificate posted; operating without a valid certificate is prohibited.

  • Operator licensing in Minnesota is by class and boiler horsepower; a licensed operator must be on duty or available as required by the boiler's size and type.

  • Maintenance records and inspection reports must be retained and made available to the inspector on request.

  • Before returning a boiler to service after repair, the safety valve, low-water cutoff, and flame safeguard must be retested and the results documented.

Quick reference

Boiler Construction, Design and Fittings

  • Boiler horsepower: one boiler horsepower equals 33,475 Btu per hour, 34.5 lb of steam per hour from and at 212 °F, or about 9.8 square feet of heating surface.

  • Heating surface is the area of the fire side exposed to hot gas; it determines the boiler's capacity and is used in ASME safety valve sizing tables.

  • Water capacity and steam space: a small steam space with high firing rate promotes carryover; the steam drum must be large enough to separate moisture.

  • Tube sheets and furnaces are stayed flat surfaces; the pitch, diameter, and attachment of stays are code-defined and must not be altered in the field.

  • Refractory and insulation protect the shell from heat and reduce radiation loss; deteriorated refractory can cause hot spots and shell overheating.

  • Handhole and manhole gaskets must be rated for the pressure and temperature; a leaking gasket can cut the shell or the bolting and must be replaced.

  • The main steam stop valve is a nonreturn or stop-check valve on a multi-boiler header; it prevents backflow from the header into a boiler that has tripped.

  • Feedwater check valve prevents backflow from the boiler into the feedwater line; the feedwater stop valve is located between the check valve and the boiler.

  • Boiler nameplate data: manufacturer, serial number, MAWP, heating surface, capacity, and year built; the stamped MAWP governs all pressure settings.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Daily checks: water level, steam pressure, stack temperature, feedwater and fuel flow, burner flame appearance, and any abnormal noise or vibration.

  • Blowdown of the gauge glass proves the water level indication is true; if water does not return quickly, the connection is blocked and the boiler must be taken out of service.

  • When the water level disappears from the gauge glass, secure the burner immediately and do not add water until the boiler has cooled; adding water to an overheated boiler can cause a violent failure.

  • Carryover and high water level are corrected by reducing firing, blowing down, and checking the feedwater control; do not add cold water rapidly to a hot boiler.

  • Steam trap and drip leg maintenance keeps condensate out of the steam header; water hammer indicates trapped condensate or a slug of water in the line.

  • Shutdown for an extended period requires layup with corrosion protection; a boiler left wet and open will corrode rapidly on the waterside.

  • After a safety trip, the cause must be found and corrected before reset; repeated resets without investigation are a common cause of accidents.

  • Operating logs are legal records; entries must be made at the time of the reading and retained for the period required by the jurisdiction.

Quick reference

Combustion, Fuels, Burners and Draft

  • Complete combustion products are CO2, H2O, and excess O2; incomplete combustion adds CO, unburned hydrocarbons, and smoke.

  • A CO reading above about 100 ppm in flue gas indicates incomplete combustion and must be corrected before continuing operation.

  • Smoke from a gas burner indicates a mechanical problem such as a misadjusted air damper or a blocked burner; gas should burn clean with a blue flame.

  • A yellow, lazy gas flame indicates insufficient air or a dirty burner; a lifting flame indicates too much air or too high gas pressure.

  • Draft gauge readings: a positive furnace pressure can force hot gas out of the boiler casing; a negative reading that is too high can pull in cold air and reduce efficiency.

  • Air density changes with temperature and altitude; a burner tuned at sea level will run lean at altitude unless the air-fuel ratio is corrected.

  • Fuel gas specific gravity affects the regulator and orifice sizing; propane requires different orifice sizes and pressures than natural gas.

  • Purge air volume must be at least four times the furnace and gas passage volume; the purge timer is set from the fan capacity and the volume.

  • Combustion efficiency is highest at the lowest excess air that still gives complete combustion; use a flue gas analyzer to set the air-fuel ratio.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • The high steam pressure limit is a separate control from the operating pressure control; it must be set below the safety valve set pressure and must require manual reset.

  • Low water alarm sounds before the cutoff trips; the alarm and cutoff are separate devices and both must be tested.

  • The safety valve try lever test proves the valve opens; it is done at operating pressure and only where the valve design permits, and it does not replace a pop test.

  • Boiler room ventilation and combustion air openings must never be blocked by stored materials; the inspector checks for obstructions.

  • Minnesota rules require that a boiler not be operated if it is unsafe or if required safety devices are out of service; the inspector may order shutdown.

  • A commissioned inspector in Minnesota is authorized to inspect boilers and pressure vessels and to issue or deny certificates of inspection.

  • Internal inspection requires the waterside and fireside to be clean and the boiler cool enough for safe entry; the inspector looks for cracks, corrosion, and wasted stays.

  • A hydrostatic test may be required after major repairs; the test pressure and procedure must follow the code and be witnessed as required.

  • Operator training records and license renewal are part of compliance; an expired license is the same as no license for purposes of the rules.

Quick reference

Boiler Construction, Design and Fittings

  • The steam drum separates steam from water; the mud drum collects sludge and is blown down through the bottom blowdown valve.

  • Waterwall tubes in the furnace absorb radiant heat and protect the furnace walls; they are the highest heat-flux tubes and are prone to corrosion and overheating.

  • Superheater tubes operate at the highest metal temperature; loss of steam flow or high firing with low steam demand can overheat them.

  • The economizer is located in the flue gas path after the boiler; it must be protected from corrosion by keeping the feedwater temperature above the acid dew point.

  • Boiler casing and insulation must be gas-tight; leaks allow cold air in and reduce efficiency and can create a safety hazard.

  • Safety valve capacity must be at least the maximum burner input; if the burner is upgraded, the safety valve must be re-evaluated and possibly replaced.

  • A pressure gauge that does not return to zero when isolated is defective and must be replaced; a stuck gauge can mislead the operator.

  • The water column must be connected to the steam space and the water space with pipes of at least the code minimum size, and the connections must be kept clear.

  • Expansion joints and slip joints in the steam and feedwater piping must be free to move; a restrained pipe can crack the boiler connection.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Pre-start check of the flame safeguard: confirm the programmer is in the proper position, the scanner is clean, and the fuel valves are closed.

  • Light-off with a warm-up burner on a cold boiler; hold at low fire until the drum and tubes have expanded and the water level is stable.

  • When a boiler is on line with others, load sharing is set by the pressure controller; a boiler that is not carrying its share may have a control or firing problem.

  • Feedwater temperature changes must be gradual; cold feedwater into a hot boiler can cause thermal stress and leaks at the tube sheets.

  • Blowdown schedule is set by boiler water tests; too little blowdown causes carryover, too much wastes energy and chemicals.

  • A sudden drop in water level with the feedwater valve open indicates a tube leak; secure the boiler and investigate before adding more water.

  • A rising water level with the feedwater valve closed indicates a tube leak or a feedwater valve passing; isolate and investigate.

  • Shutdown for a short period keeps the boiler warm with the burner off and the main steam stop closed; monitor the water level and pressure.

  • After any emergency shutdown, the boiler must be inspected and the cause corrected before it is returned to service.

Quick reference

Combustion, Fuels, Burners and Draft

  • The burner management system enforces the light-off sequence and prevents fuel from entering the furnace without proven ignition and purge.

  • The igniter must be proven before the main fuel valve opens; a failed igniter causes a lockout and requires a full purge before retry.

  • Flame detection by ultraviolet scanner sees the flame's UV radiation; a dirty lens or a hot refractory can cause a false flame signal.

  • A false flame signal at startup prevents light-off and is a serious hazard; the scanner must be checked and the cause corrected.

  • Draft control on a balanced draft boiler coordinates the forced draft and induced draft fans to hold furnace pressure slightly negative.

  • A loss of induced draft fan trips the burner; the furnace must not be fired without proven draft.

  • Fuel oil atomization uses steam or air; a plugged atomizer causes a smoky flame and carbon buildup on the burner.

  • Gas pressure too low causes flame instability and possible flashback; gas pressure too high can cause flame lift and overfiring.

  • Combustion air temperature affects the flame temperature and NOx formation; preheated air raises efficiency but can increase NOx.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • Safety devices must be tested at the frequency required by the jurisdiction and the manufacturer; test results must be recorded.

  • The low-water cutoff must be tested by lowering the water level, not by opening the drain on the float chamber alone, unless the manufacturer's procedure allows it.

  • A safety valve that has been repaired must be retested and tagged with the set pressure and capacity.

  • Minnesota boiler rules set the inspection interval and the requirements for operator attendance; the owner is responsible for compliance.

  • The inspector may require the boiler to be opened for internal inspection; refusal or obstruction can result in loss of the certificate.

  • Maintenance of safety devices must use original or approved parts; substituting a non-approved valve or switch can void the certificate.

  • A boiler with a known defect that affects safety must be taken out of service until repaired and reinspected.

  • Records of inspections, repairs, and tests must be kept and made available; they are the evidence of compliance.

  • Operator licensing requires proof of experience and passing an examination; the license class determines the size of boiler that may be operated.

Quick reference

Boiler Construction, Design and Fittings

  • The furnace is the combustion chamber; its volume and shape determine the flame length and the heat release rate.

  • Heat release rate per cubic foot of furnace volume is limited to prevent overheating and to allow complete combustion.

  • The tube sheet of a firetube boiler is stayed to the shell; wasted staybolts reduce the allowable pressure and must be replaced.

  • A crown sheet or furnace sheet exposed to flame must be kept covered with water; low water is the most dangerous condition for a firebox boiler.

  • The boiler shell is a pressure vessel; any crack, groove, or corrosion pit reduces the allowable pressure and must be evaluated by an inspector.

  • Safety valve discharge piping must be supported independently so the valve is not stressed by the weight of the pipe.

  • The water column and gauge glass must be mounted vertically and protected from vibration; a tilted column gives a false level.

  • The main steam stop valve must be accessible and operable from a safe location; it is used to isolate the boiler in an emergency.

  • Boiler foundations and supports must allow for thermal expansion and must be inspected for cracking and movement.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Startup of a boiler that has been out of service requires a check of the waterside and fireside, the safety devices, and the fuel system before light-off.

  • A boiler that has been drained must be refilled with treated water and vented before firing; air in the boiler can cause corrosion and uneven heating.

  • Warm-up of the steam header must be done slowly with drains open; water hammer during warm-up indicates condensate in the line.

  • When shutting down, reduce load gradually; a sudden load drop can cause the safety valve to lift and the water level to swell.

  • After shutdown, the boiler should be cooled slowly; rapid cooling causes thermal stress and can crack tube sheets.

  • Blowdown after shutdown removes sludge while the boiler is still warm; the boiler must be below the safe temperature for the procedure.

  • A boiler left in wet layup must be checked for water level and chemistry; a boiler left in dry layup must be checked for moisture.

  • Operating records must include any abnormal condition, the action taken, and the result; this supports later investigation and compliance.

  • Before returning to service after layup, the safety devices must be retested and the boiler inspected for corrosion.

Quick reference

Combustion, Fuels, Burners and Draft

  • The stoichiometric air-fuel ratio is the minimum air for complete combustion; excess air is added to ensure complete combustion in practice.

  • A flue gas analyzer measures O2, CO, and stack temperature; these are used to calculate combustion efficiency.

  • A high CO reading with normal O2 indicates incomplete combustion, often from a cold furnace, poor atomization, or a flame impinging on a cold surface.

  • A low O2 reading with high CO indicates insufficient air; increase air and recheck CO.

  • A high O2 reading with low CO indicates excess air; reduce air to improve efficiency while keeping CO low.

  • Stack temperature above the design value indicates fouling on the fireside; clean the tubes to restore efficiency.

  • Draft loss across the boiler indicates a blockage or a fan problem; the pressure drop must be monitored.

  • A flame that impinges on the furnace wall causes carbon buildup and hot spots; adjust the burner position and air pattern.

  • Fuel analysis (heating value, sulfur, ash) affects the air requirement and the emissions; the burner must be set for the actual fuel.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • The safety valve is set and sealed by a qualified valve repair facility; the set pressure must not be changed in the field.

  • The low-water cutoff must be tested at the frequency required; a common failure is a stuck float or a plugged equalizing line.

  • The high pressure limit and operating pressure control must be tested by raising pressure or by simulating the signal, per the manufacturer's procedure.

  • The flame safeguard must be tested for lockout and for the purge timing; a jumper on the scanner is a serious violation.

  • Minnesota requires that boilers be inspected and certified; the certificate must be posted in the boiler room.

  • An inspector may require a hydrostatic test or an internal inspection after a repair; the owner must provide access and assistance.

  • The owner must maintain a file of the manufacturer's data report, inspection reports, and repair records.

  • A boiler that has been repaired by welding on pressure parts requires a code stamp or a repair report and reinspection.

  • Operator licensing in Minnesota is by class, and the license must be available for inspection.

Quick reference

Boiler Construction, Design and Fittings

  • The steam separating equipment in the drum includes baffles, screens, and dry pipes; its purpose is to deliver dry steam and prevent carryover.

  • The feedwater inlet is located away from the gauge glass and the steam outlet to avoid false level readings and carryover.

  • The blowdown connection is at the lowest point of the boiler; the mud drum blowdown removes sludge, and the surface blowdown removes dissolved solids.

  • A surface blowdown line is located at the water level and is used to control dissolved solids; it is not a substitute for bottom blowdown.

  • The safety valve must be mounted directly on the boiler or on a nozzle with no intervening valve; the discharge must be piped to a safe location.

  • The pressure gauge must be connected to the steam space and must have a siphon and a shutoff valve; a gauge that is isolated must be tagged.

  • The water column must be provided with a drain and a connection to the gauge glass; the connections must be at least the code minimum size.

  • Handholes and manholes must be provided for inspection and cleaning; their covers and gaskets must be rated for the pressure.

  • The boiler nameplate must be attached and legible; it is the reference for the MAWP and the capacity.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Startup sequence: check water level, open vents and drains, start fans and purge, prove ignition, open fuel valve, prove main flame, and bring up pressure slowly.

  • During warm-up, check the gauge glass and try cocks; a false level can lead to a low-water trip or overfilling.

  • When the boiler reaches operating pressure, test the safety valve and the low-water cutoff before placing it on line.

  • Paralleling: warm the header, match pressure, open the main steam stop slowly, and then close the drains.

  • Load changes must be made gradually; a sudden increase in firing can cause carryover and a sudden decrease can cause the safety valve to lift.

  • Feedwater control must be set to maintain level; a three-element control uses steam flow, feedwater flow, and water level.

  • Blowdown must be done with the boiler under load and at low fire; blowing down at high fire can cause a low-water trip.

  • Shutdown: reduce firing, blow down the gauge glass and low-water cutoff, secure the burner, close the main steam stop, and allow the boiler to cool.

  • Emergency shutdown: trip the burner, close the fuel valves, close the main steam stop, and do not add water to a hot boiler that has lost water.

Quick reference

Combustion, Fuels, Burners and Draft

  • The four elements of combustion are fuel, oxygen, heat, and the chain reaction; the burner must supply fuel and air in the right proportions and ignite them.

  • The air-fuel ratio is controlled by the burner linkage; the fuel valve and air damper must move together and be set by a combustion test.

  • The purge cycle removes unburned fuel from the furnace before ignition; the purge time is set to give at least four air changes.

  • The trial for ignition time is the period the fuel valve is open before the flame must be proven; if the flame is not proven, the valve closes and the burner locks out.

  • The flame safeguard locks out on flame failure; a manual reset is required, and the cause must be found before resetting.

  • Draft is the pressure difference that moves air and flue gas; it is measured in inches of water column.

  • Natural draft depends on stack height and temperature; a taller, hotter stack gives more draft.

  • Forced draft supplies air to the burner; induced draft pulls flue gas from the boiler; balanced draft uses both.

  • A blocked flue or a closed damper causes a loss of draft and a burner trip; the cause must be found before resetting.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • The safety valve must be tested at the set pressure; the popping point and the reseating point must be recorded.

  • The low-water cutoff must be tested by lowering the water level; the burner must stop and the reset must be manual.

  • The high pressure limit must be tested by raising pressure or simulating the signal; the burner must stop and the reset must be manual.

  • The flame safeguard must be tested for flame failure and for lockout; the scanner must be clean and properly sighted.

  • Minnesota boiler rules require that the boiler be inspected at the interval set by rule and that the certificate be posted.

  • The inspector must be given access to the boiler and to the records; the owner must correct any defects found.

  • A boiler that is unsafe must be taken out of service; the inspector may order the boiler shut down.

  • Repairs to pressure parts must follow the code and be documented; the inspector may require a hydrostatic test after repair.

  • Operator licensing and training records must be kept and available for inspection.

Quick reference

Boiler Construction, Design and Fittings

  • Boiler horsepower is a measure of capacity, not of pressure; a 100 hp boiler can be built for different pressures.

  • The heating surface is the area exposed to hot gas on the fire side; it is used in the ASME safety valve capacity tables.

  • The water content of a firetube boiler is large, so it responds slowly to load changes; a watertube boiler has less water and responds faster.

  • The furnace volume and the heat release rate determine the flame length and the combustion efficiency.

  • The superheater and economizer are heat recovery surfaces; they must be protected during startup and low load.

  • The safety valve capacity must match the maximum burner input; a burner upgrade requires a safety valve review.

  • The pressure gauge and the water column must be connected to the steam space; the gauge glass must show the water level at all times.

  • The main steam stop and the feedwater check valves isolate the boiler; they must be operable and accessible.

  • The boiler supports must allow expansion; a restrained boiler can crack at the connections.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Pre-start: confirm the boiler is filled to the proper level, the vents are open, the drains are positioned, and the fuel supply is available.

  • Purge the furnace and gas passages before ignition; the purge must be completed before the fuel valve can open.

  • Light-off: prove the igniter, open the fuel valve, prove the main flame, and then increase firing gradually.

  • Warm-up: raise pressure slowly, check for leaks and expansion, and test the safety devices before placing the boiler on line.

  • On line: maintain water level, steam pressure, and combustion; log the readings and investigate any trend.

  • Blowdown: bottom blowdown at low fire with the boiler under load; surface blowdown to control dissolved solids.

  • Shutdown: reduce firing, secure the burner, close the main steam stop, and allow the boiler to cool slowly.

  • Emergency: trip the burner, close the fuel valves, close the main steam stop, and do not add water to a hot boiler that has lost water.

  • After a trip, find and correct the cause before resetting; a full purge is required before the next light-off.

Quick reference

Combustion, Fuels, Burners and Draft

  • Theoretical air for natural gas is about 10 cubic feet per cubic foot of gas; excess air of 15 to 25 percent is typical.

  • Theoretical air for No. 2 oil is about 1,450 pounds per 100 pounds of oil; excess air of 20 to 30 percent is typical.

  • Excess air too low causes CO and smoke; excess air too high reduces efficiency by raising the stack loss.

  • Stack loss is the largest efficiency loss; a 40 °F rise in stack temperature costs about 1 percent efficiency.

  • Draft is measured in inches of water column; furnace draft is normally slightly negative.

  • Natural draft depends on stack height and temperature; forced and induced draft use fans.

  • A flame scanner must see only its own flame; a false signal is a serious hazard.

  • Fuel oil must be atomized and heated to the proper viscosity; cold oil causes smoke and carbon buildup.

  • The gas train includes a manual shutoff, regulator, pressure switches, safety shutoff valves, and a leak test valve.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • The safety valve is the final overpressure protection; it must be piped to a safe discharge and must not be restricted.

  • The low-water cutoff must be tested with the burner firing; the test proves the fuel stops and the reset is manual.

  • The high pressure limit must be set below the safety valve and must require manual reset.

  • The flame safeguard must be tested for lockout; a jumper on the scanner is a serious violation.

  • Minnesota requires inspection and certification; the certificate must be posted and the boiler must not be operated if unsafe.

  • The inspector must have access to the boiler and the records; defects must be corrected.

  • Repairs to pressure parts must follow the code and be documented; a hydrostatic test may be required.

  • Operator licensing is by class and must be available for inspection.

  • Records of inspections, repairs, and tests must be kept and made available.

Quick reference

Boiler Construction, Design and Fittings

  • The steam drum separates steam from water; the mud drum collects sludge and is blown down.

  • Waterwall tubes absorb radiant heat and protect the furnace walls; they are prone to corrosion and overheating.

  • The superheater operates at the highest metal temperature and must have steam flow for cooling.

  • The economizer recovers heat from flue gas and must be protected from corrosion by keeping the feedwater above the acid dew point.

  • The air preheater recovers heat and improves efficiency but can cause cold-end corrosion.

  • The boiler casing must be gas-tight; leaks reduce efficiency and create hazards.

  • The safety valve capacity must match the maximum burner input.

  • The pressure gauge must be connected to the steam space with a siphon and a shutoff.

  • The water column must be connected to the steam and water spaces with code-size pipes.

Quick reference

Boiler Operation, Startup and Shutdown Procedures

  • Daily checks: water level, steam pressure, stack temperature, feedwater and fuel flow, flame appearance, and abnormal noise.

  • Gauge glass blowdown proves the level indication; if water does not return, the connection is blocked and the boiler must be taken out of service.

  • If the water level disappears, secure the burner and do not add water until the boiler has cooled.

  • Carryover is corrected by reducing firing, blowing down, and checking the feedwater control.

  • Water hammer indicates condensate in the line; drain the line and check the traps.

  • Layup requires corrosion protection; wet layup uses treated water and an oxygen scavenger, dry layup uses desiccant.

  • After a safety trip, find and correct the cause before resetting.

  • Operating logs are legal records and must be retained.

  • Before returning to service after layup, retest the safety devices and inspect for corrosion.

Quick reference

Combustion, Fuels, Burners and Draft

  • Complete combustion produces CO2, H2O, and excess O2; incomplete combustion adds CO and smoke.

  • A CO reading above about 100 ppm indicates incomplete combustion and must be corrected.

  • A yellow gas flame indicates insufficient air or a dirty burner; a lifting flame indicates too much air or high gas pressure.

  • A positive furnace pressure can force hot gas out of the casing; a negative reading that is too high pulls in cold air.

  • Air density changes with temperature and altitude; a burner tuned at sea level runs lean at altitude.

  • Fuel gas specific gravity affects regulator and orifice sizing; propane differs from natural gas.

  • Purge air volume must be at least four times the furnace volume.

  • Combustion efficiency is highest at the lowest excess air that gives complete combustion.

  • A flue gas analyzer is used to set the air-fuel ratio.

Quick reference

Safety Devices, Maintenance, Inspection and Minnesota Boiler Rules

  • The high pressure limit is separate from the operating pressure control and must require manual reset.

  • The low water alarm sounds before the cutoff trips; both must be tested.

  • The safety valve try lever test proves the valve opens; it does not replace a pop test.

  • Boiler room ventilation and combustion air openings must never be blocked.

  • Minnesota rules prohibit operating an unsafe boiler or one with required safety devices out of service.

  • A commissioned inspector is authorized to inspect and to issue or deny certificates.

  • Internal inspection requires a clean, cool boiler and safe access.

  • A hydrostatic test may be required after major repairs and must follow the code.

  • Operator training and license renewal are part of compliance.