- Original monument
- A monument set by the original surveyor that is accepted as the best evidence of a boundary corner, controlling over later measurements and deed distances.
- Priority of evidence
- The hierarchy in boundary retracement: natural monuments, then artificial monuments, then courses and distances, then area, used to resolve conflicts in deed descriptions.
- Adverse possession period
- In Missouri, the statutory period for adverse possession is typically 10 years under Mo. Rev. Stat. § 516.010, requiring actual, open, notorious, exclusive, hostile, and continuous possession.
- Accretion vs avulsion
- Accretion is gradual deposit of soil that changes a river boundary and belongs to the riparian owner; avulsion is a sudden change that does not alter the boundary.
- Proportionate measurement
- A method to reestablish a lost corner by proportioning the record distances between known corners along the line, used when original evidence is insufficient.
- 20 CSR 2030-16
- The Missouri regulation containing the minimum standards for property boundary surveys, including requirements for contracts, plats, and monumentation.
- Missouri survey plat
- A document prepared by a licensed surveyor showing the boundary, monuments, basis of bearings, area, and the surveyor's seal, signature, and date.
- Monumentation requirement
- Missouri minimum standards require setting monuments at all property corners unless impractical, in which case the reason must be stated on the plat.
- Continuing professional competency
- Missouri license renewal requires continuing education hours as set by the Board in 20 CSR 2030-13.010, covering technical and ethical topics.
- NAD83
- The North American Datum of 1983, based on the GRS80 ellipsoid, is the current horizontal datum for Missouri and the basis for the State Plane Coordinate System.
- Missouri State Plane zones
- Missouri has two State Plane zones, East and West, both using the Lambert Conformal Conic projection, with coordinates defined in Mo. Rev. Stat. § 60.401 et seq.
- Combined factor
- The product of the grid scale factor and the elevation factor, used to convert between grid distances and ground distances in State Plane coordinates.
- Geoid undulation
- The separation between the ellipsoid and the geoid, denoted N, used to convert GNSS ellipsoid heights to orthometric heights: h = H + N.
- Map projection scale factor
- The ratio of grid distance to ellipsoid distance at a point; for Lambert Conformal Conic, it is exact on the standard parallels and varies elsewhere.
- Traverse linear misclosure
- The distance between the computed and known endpoint of a traverse, calculated as the square root of the sum of the squares of the latitude and departure misclosures.
- EDM accuracy specification
- Expressed as ±(a mm + b ppm), the error in distance measurement increases with distance; for example, ±(2 mm + 2 ppm) at 1 km gives ±4 mm.
- Prism constant
- A systematic offset in EDM distances due to the prism design; it must be set correctly on the total station, with common values of 0 mm or -30 mm.
- Temperature correction
- A tape correction applied for thermal expansion: L × α × (T - T0), where α is the coefficient of thermal expansion for steel, about 0.00000645 per °F.
- GNSS RTK accuracy
- Real-Time Kinematic GNSS typically provides horizontal accuracy of 1-2 cm and vertical accuracy of 2-5 cm, depending on baseline length and satellite geometry.
- PLSS township
- A public land survey unit nominally 6 miles square, containing 36 sections of 1 square mile each, numbered in a boustrophedon pattern.
- Fifth Principal Meridian
- The principal meridian that governs most of the Public Land Survey System in Missouri, running north from the baseline near the Arkansas border.
- Section subdivision
- The division of a PLSS section into quarter sections (160 acres), quarter-quarter sections (40 acres), and smaller aliquot parts for legal descriptions.
- Missouri Plat Act
- Chapter 445, RSMo, which requires subdivision plats to be prepared by a registered land surveyor and approved and recorded by the governing body.
- Lost corner reestablishment
- The process of restoring a lost PLSS corner using proportionate measurement and the rules in the Manual of Surveying Instructions (2009).
- Contour interval
- The vertical distance between adjacent contour lines on a topographic map; index contours are heavier and labeled with elevation.
- Cut and fill
- The difference between design elevation and existing ground elevation; cut is positive when ground is above design, fill is negative when ground is below design.
- Average end area method
- A volume computation method using the formula V = L × (A1 + A2)/2, where A1 and A2 are cross-sectional areas at the ends of length L.
- Breakline
- A line collected in topographic surveying that marks a change in slope or surface, such as the top or bottom of a slope, used to build an accurate terrain model.
- As-built survey
- A survey performed after construction to document the actual horizontal and vertical locations of improvements and compare them to design plans.
- Missouri Code of Ethics
- The ethical rules for Missouri land surveyors in 20 CSR 2030-4.020, covering obligations to the public, clients, and the profession, including competence and conflict of interest.
- Responsible charge
- The direct supervision and control of professional surveying work by a licensed surveyor, who must seal and sign the final documents.
- Contingent fee
- A fee based on the outcome of a survey, such as a percentage of the value of the land; this is generally considered unethical for professional surveyors.