MO Land Surveyor study materials
MO Land Surveyor study resources

MO Land Surveyor study plan

MO Land Surveyor · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Boundary Surveying and Retracement & Missouri Minimum Standards and State Statutes

  • Map the Missouri boundary retracement decision tree: identify the controlling elements for original government corners, lost corners, and ambiguous evidence under Missouri case law.

  • Compare the statutory definition of practice and minimum standards (20 CSR 2030-6) against boundary retracement procedures, listing where they intersect.

  • Create a one-page checklist for field evidence collection that satisfies both retracement principles and Missouri minimum standards.

  • Solve 15 boundary retracement scenarios (paper problems) applying the hierarchy of evidence and document the reasoning for each.

Your checkpoint

A 2-page synthesis document with the decision tree, checklist, and 15 solved scenarios with citations to Missouri statutes and standards.

Week 2

Boundary Surveying and Retracement & Cadastral Systems, PLSS, and Subdivision

  • Analyze 10 PLSS retracement problems focusing on proportioning, single and double proportion, and meander line issues.

  • Explain how Missouri treats federal land grants and the PLSS within its boundaries, including the role of the original surveys.

  • Draft a retracement report for a hypothetical subdivision lot that addresses original corners, occupation, and unwritten rights.

  • Compare PLSS corner restoration methods (e.g., BLM manual) with Missouri-specific case law and statutory requirements.

Your checkpoint

A 3-page retracement report for the hypothetical lot, including a corner restoration plan and legal rationale.

Week 3

Cadastral Systems, PLSS, and Subdivision & Missouri Minimum Standards and State Statutes

  • Outline the Missouri subdivision platting process from pre-application to recording, noting statutory deadlines and approval authorities.

  • Identify the minimum standards for plat content and survey accuracy in Missouri and apply them to a sample plat.

  • Review the Missouri statutes on corner perpetuation and monumentation, and list the requirements for filing corner records.

  • Create a compliance checklist for a subdivision plat that integrates PLSS, statutory, and local requirements.

Your checkpoint

A completed compliance checklist for a sample subdivision plat, with annotations of any deficiencies.

Week 4

Geodesy and Coordinate Systems & Measurement and Instrumentation

  • Solve 10 coordinate transformation problems between NAD27, NAD83, and Missouri State Plane Coordinate System (SPCS) zones.

  • Explain the Missouri SPCS zones (East, Central, West) and the projection parameters, including scale factors and convergence.

  • Compare total station, GNSS, and digital level performance for typical Missouri survey tasks, listing accuracy and limitations.

  • Calibrate a total station and a GNSS receiver (simulated or real) and document the procedure and results.

Your checkpoint

A lab report with 10 solved transformation problems and a calibration record for two instruments, including error analysis.

Week 5

Geodesy and Coordinate Systems & Measurement and Instrumentation

  • Design a control survey for a 40-acre parcel that meets Missouri minimum standards for horizontal and vertical accuracy.

  • Perform a least-squares adjustment of a small network (simulated data) and interpret residuals and error ellipses.

  • Evaluate the impact of atmospheric corrections and instrument errors on GNSS-derived coordinates in Missouri.

  • Prepare a field procedure for GNSS static and RTK surveys that addresses Missouri-specific issues (e.g., tree cover, multipath).

Your checkpoint

A control survey design package including network diagram, adjustment results, and field procedures.

Week 6

Topographic Mapping and Construction Surveying & Boundary Surveying and Retracement

  • Generate a topographic map from a point cloud or total station data, ensuring compliance with Missouri minimum standards for mapping.

  • Compute earthwork volumes for a small site using both average end-area and prismoidal methods, and compare results.

  • Set out a horizontal curve and a vertical curve for a hypothetical road, documenting the calculations and field checks.

  • Integrate boundary evidence into a topographic survey, showing how to depict encroachments and easements.

Your checkpoint

A topographic map and earthwork report for a 5-acre site, including curve stakeout calculations and a boundary overlay.

Week 7

Business, Ethics, and Professional Practice & Missouri Minimum Standards and State Statutes

  • Analyze 10 ethics case studies relevant to Missouri surveyors, applying the NCEES Model Rules and Missouri statutes.

  • Draft a written response to a hypothetical complaint about professional negligence, including preventive recommendations.

  • Review Missouri statutes and rules on licensure, continuing education, and professional conduct, and summarize key obligations.

  • Create a business risk management plan for a small surveying firm, covering contracts, liability, and quality control.

Your checkpoint

A 2-page ethics and risk management guide with case study analyses and a sample contract clause.

Week 8

Boundary Surveying and Retracement & Missouri Minimum Standards and State Statutes & Geodesy and Coordinate Systems & Measurement and Instrumentation & Cadastral Systems, PLSS, and Subdivision & Topographic Mapping and Construction Surveying & Business, Ethics, and Professional Practice

  • Complete a full-length practice exam under timed conditions, simulating the Missouri PLS exam format.

  • Review all incorrect answers and create a personalized list of weak topics with references for further study.

  • Revisit the highest-weight domains (1, 2, 5) by solving 20 mixed problems from those areas.

  • Finalize a one-page quick-reference sheet of key formulas, statutes, and standards for last-minute review.

Your checkpoint

A practice exam score report with a remediation plan and a quick-reference sheet.

Milestones

Week 2: Score at least 80% on a 20-question quiz covering boundary retracement and PLSS, with explanations for each answer.

Week 4: Successfully complete a timed coordinate transformation exercise (10 problems in 60 minutes) with 90% accuracy.

Week 6: Produce a topographic map and earthwork report that passes a self-assessment checklist based on Missouri minimum standards.

Week 8: Achieve a score of 75% or higher on the full-length practice exam, with no domain scoring below 60%.