MS Landscape study materials
MS Landscape study resources

MS Landscape cheat sheet

MS Landscape · Keep the key ideas within reach.

Quick reference

Landscape Design and Planning

  • Scale formula: scale = drawing distance ÷ real distance; a 1:100 plan means 1 mm on paper equals 100 mm (0.1 m) on site.

  • Slope percentage = (rise ÷ run) × 100. A 2% cross-slope on a 3 m walk drops 60 mm across its width.

  • Universal access ramp rule (ADA-style): maximum running slope 1:12 (8.33%), maximum cross slope 1:48 (2.08%), landing required every 9.1 m of run and at direction changes.

  • Outdoor stair riser/tread rule of thumb: riser 100–180 mm with tread 280–400 mm; keep riser + tread between roughly 550 and 700 mm for comfortable gait.

  • Bubble diagram to schematic: adjacency matrix ranks desired relationships, then zoning separates public, private, and service zones before hardline layout.

  • Sightline check: eye height 1.5–1.7 m standing; a 1 m high obstruction blocks view beyond it at a ratio of obstruction height ÷ viewer height.

  • Planting plan symbols: canopy circle diameter should equal mature spread at scale, not nursery size, so spacing conflicts surface at design stage.

  • Sun angle for shadow studies: shadow length = object height ÷ tan(solar altitude); at 45° altitude shadow equals height.

Quick reference

Plant Selection and Horticulture

  • USDA hardiness zones map average annual extreme minimum temperature in 5.6 °C (10 °F) bands; zone 7 spans −17.8 to −12.2 °C.

  • AHS heat zones rate average days above 30 °C (1 = under 1 day, 12 = over 210 days); use both cold and heat zone for reliable selection.

  • Right plant, right place: match mature size, light (full sun ≥6 h direct), soil drainage, pH, and moisture before ornamental criteria.

  • Soil pH availability: iron and manganese lock up above pH 7.0 (chlorosis risk); phosphorus locks up below pH 5.5 and above 7.5.

  • Balled-and-burlapped stock: root ball diameter roughly 10–12 times trunk caliper for deciduous trees; planting hole 2–3 times root ball width, same depth.

  • Tree planting depth: root flare at or slightly above grade; buried flare causes girdling roots and slow decline over 5–10 years.

  • Hydrozoning groups plants by water demand (high, moderate, low, very low) so irrigation zones match plant needs rather than bed geometry.

  • Natives vs. cultivars: local ecotypes support more insect herbivores; double-flowered cultivars often produce little nectar or pollen.

Quick reference

Site Construction and Materials

  • Concrete mix by volume for general landscape flatwork: 1 part cement : 2 sand : 3 coarse aggregate; 28-day compressive strength target typically 20–25 MPa.

  • Concrete slab thickness rules of thumb: 100 mm for pedestrian only, 125–150 mm for light vehicle, 200 mm+ with reinforcement for heavy loads.

  • Expansion joints every 2.4–3.0 m in flatwork and at every abutting structure; control joints at intervals of 24–30 times slab thickness.

  • Base aggregate depth: 100–150 mm compacted crushed stone under pedestrian pavers, 200–300 mm under vehicle pavers; compact in 75–100 mm lifts.

  • Segmental paver bedding sand: 25–40 mm screeded layer, 6–10 mm joints, edge restraint required on all open edges.

  • Retaining wall drainage: washed stone backfill 300 mm wide plus perforated pipe at footing and filter fabric; hydrostatic pressure is the leading cause of wall failure.

  • Timber decay: ground-contact rated material required within 150 mm of grade; air gap and capillary break extend service life.

  • Deck footing depth must extend below local frost line; frost heave lifts shallow footings and racks framing.

Quick reference

Landscape Maintenance and Management

  • Mowing rule (one-third rule): never remove more than one-third of blade height per cut; cool-season turf maintained 50–75 mm, warm-season 25–50 mm.

  • Turf fertilization: cool-season grasses fertilize mainly in fall; warm-season in late spring through summer; avoid high nitrogen before dormancy.

  • Pruning timing: prune spring-flowering shrubs right after bloom (they flower on old wood); summer-flowering shrubs prune in late winter or early spring (new wood).

  • Structural pruning: remove no more than 25% of live canopy in one year; never top trees - flush-cut and topping wounds invite decay.

  • IPM hierarchy: cultural, mechanical, biological, then chemical controls; monitor with thresholds before treating.

  • Mulch depth 50–75 mm, kept 50–100 mm away from trunks; deeper mulch or volcano mulching reduces oxygen and promotes stem rot.

  • Tree risk assessment: evaluate likelihood of failure and consequence of failure; targets include people, structures, and utilities.

  • Snow and ice: avoid sodium chloride near planting beds; use calcium magnesium acetate or sand where plant and water sensitivity matters.

Quick reference

Irrigation and Water Management

  • Precipitation rate (mm/h) = (flow per emitter or head in L/h × number of heads) ÷ area covered in m²; match PR across a zone to avoid wet/dry patterns.

  • Distribution uniformity below about 70% signals maintenance or design problems; catch-can tests measure DU on site.

  • Scheduling: plant water use = reference evapotranspiration (ETo) × crop coefficient (Kc); replace a fraction of ETo based on species and season.

  • Run time (min) = (ETo × Kc × area × interval) ÷ (system flow × efficiency); convert units consistently to litres and millimetres.

  • Pressure: drip systems typically operate 100–200 kPa; most spray heads are rated near 200–300 kPa; excessive pressure causes misting and runoff.

  • Zone by hydrozone and by hardware: never mix drip and spray on one valve; matched-precipitation heads simplify scheduling.

  • Check valve and backflow protection are required where irrigation connects to potable supply; air gap or reduced-pressure device per local code.

  • Rain sensor or smart controller with soil moisture override saves water; seasonal adjust from 100% in peak summer to 50% or less in shoulder seasons.

Quick reference

Business Practices and Project Management

  • Overhead recovery: overhead % = total annual overhead ÷ total annual direct cost; apply it to every estimate or the business loses margin silently.

  • Bid price = direct costs (labor, materials, equipment, subcontract) + overhead + profit; never bury overhead inside the profit line.

  • Labor burden (taxes, insurance, benefits) commonly adds 25–45% to base wage; use burdened rate, not hourly wage, in estimates.

  • Change order discipline: written, priced, and signed before work proceeds; verbal changes are the top source of disputes and lost profit.

  • Retainage commonly 5–10% withheld until substantial completion; track it as receivable, not as cash available.

  • Contract essentials: scope, schedule, price and payment terms, change procedure, warranty, insurance and indemnity, termination clause.

  • Cash flow: bill progress monthly, keep 60–90 days of operating reserve, and match material purchases to payment cycles.

  • Warranty and aftercare: plants often carry a one-year warranty conditioned on proper watering and maintenance by the owner.