MS Landscape study plan
MS Landscape · Give each week a clear focus.
8 weeks · About 7 hours per week
Landscape Design and Planning
Map the design-process sequence from client interview through schematic, design development, and construction documents, and state the purpose and typical output of each stage
Interpret a site plan's graphic conventions-north arrow, scale bar, contour lines, spot elevations, setback lines, and utility easements-without a legend
Compute slope between two spot elevations and flag gradients that fail accessible-route or drainage thresholds
Draft a written program of requirements from a hypothetical residential client brief, separating must-haves from preferences
Your checkpoint
A one-page annotated site-analysis sheet for a single-family lot: existing conditions, three constraints, three opportunities, and a written program of requirements
Landscape Design and Planning
Apply circulation and spatial-hierarchy principles to organize a residential plan into public, private, and service zones
Select hardscape layout patterns (linear, courtyard, mews) and justify each against site geometry and use intensity
Compare planting-design frameworks-layering, massing versus specimen, repetition and rhythm-and apply one to a planting-bed sketch
Explain how grading, drainage, and stormwater-management concepts (swales, rain gardens, detention) shape the layout before planting begins
Your checkpoint
A scaled schematic plan for a 1,500-square-foot residential rear yard showing zones, circulation, hardscape, and a labeled planting concept
Landscape Design and Planning & Site Construction and Materials
Translate a schematic plan into dimensioned layout lines, and identify which dimensions govern construction versus which are reference-only
Write construction notes and a legend that specify materials, finishes, and installation sequence for a patio and low retaining wall
Identify the plan, section, elevation, and detail drawings needed to communicate a design package, and explain what each resolves
Review a set of drawings for coordination gaps-missing dimensions, conflicting elevations, unclear callouts-and log the errors
Your checkpoint
A dimensioned layout and detail package for the patio and retaining wall from Week 2, plus a written coordination-review log of at least five issues
Site Construction and Materials
Compare segmental retaining-wall, poured-in-place concrete, and timber wall systems by structural behavior, drainage requirements, and typical height limits
Specify base, subbase, and bedding requirements for unit pavers and flagstone, and explain why compaction and edge restraint determine long-term performance
Evaluate concrete mix, reinforcement, and jointing practices, and describe how freeze-thaw exposure and soil conditions affect durability
Explain the role of geotextiles, drainage aggregate, and weep points in below-grade and retaining applications
Your checkpoint
A materials specification sheet for three hardscape assemblies (paver patio, concrete walk, retaining wall) with layer thicknesses, compaction, and drainage details
Plant Selection and Horticulture
Classify plants by light, moisture, and soil-pH tolerance, and match ten species to defined site microclimates
Read a USDA hardiness zone map and a plant label to judge whether a species is appropriate for a given site, including heat-zone and exposure caveats
Apply right-plant-right-place criteria-mature size, root behavior, maintenance demand, and invasive potential-to screen out unsuitable selections
Distinguish native, adapted, and invasive species, and justify native or pollinator-supporting selections in a planting plan
Your checkpoint
A 12-species planting schedule with botanical name, common name, size at maturity, light and moisture needs, hardiness zone, and a one-line justification per species
Plant Selection and Horticulture & Landscape Maintenance and Management
Build a seasonal maintenance calendar that sequences pruning, fertilizing, mulching, mowing, and irrigation adjustments across the year
Apply correct pruning technique-timing by flowering habit, cut placement, and removal limits-and identify common pruning errors
Diagnose five common plant problems (chlorosis, drought stress, root rot, pest damage, sunscald) from symptom descriptions and prescribe corrective action
Write a soil-management approach covering aeration, organic matter, pH adjustment, and mulch depth
Your checkpoint
A 12-month maintenance calendar for the Week 5 planting plan, plus a one-page diagnostic guide linking five symptoms to causes and corrective actions
Irrigation and Water Management & Landscape Maintenance and Management
Explain how soil type, plant water need, and climate determine irrigation scheduling, and calculate a weekly run time from a given precipitation rate and target application depth
Compare drip, spray, and rotor systems by efficiency, application uniformity, and appropriate use, and identify common design faults such as head-to-head spacing errors and mixed-zone planting
Describe water-conservation strategies-hydrozoning, mulching, rain harvesting, smart controllers-and their measurable effect on use
Outline a seasonal start-up and winterization procedure, including backflow protection and freeze-damage precautions
Your checkpoint
A hydrozone map for the Week 5 planting plan with a calculated irrigation schedule (zone, precipitation rate, run time, frequency) and a winterization checklist
Business Practices and Project Management & Landscape Design and Planning
Draft a project budget covering labor, materials, equipment, subcontractors, overhead, and contingency, and set a defensible markup
Build a proposal and scope-of-work document that defines deliverables, exclusions, payment schedule, and change-order procedure
Sequence a project schedule using task dependencies and identify the critical path for a small residential install
Apply contract, liability, and risk-management fundamentals-insurance, lien waivers, warranty terms-to a sample project scenario
Integrate all prior deliverables into a portfolio and self-test against the domain weightings to target remaining weak areas
Your checkpoint
A complete project package for one residential project: budget with markup, scope and proposal, task schedule with critical path, and risk register
Milestones
Week 2: Can produce a scaled schematic plan with clearly defined zones and circulation, and defend each layout decision in writing without consulting notes
Week 4: Can specify three hardscape assemblies from memory-layer thicknesses, compaction, and drainage-and catch at least four coordination errors in a sample drawing set
Week 6: Can build a 12-month maintenance calendar and correctly diagnose five plant problems from symptom descriptions alone
Week 8: Can complete a full project package-budget, scope, schedule, risk register-within a timed 90-minute self-test and score 75% or higher on a mixed-domain practice set