MS Landscape study materials
MS Landscape study resources

MS Landscape study plan

MS Landscape · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Landscape Design and Planning

  • Map the design-process sequence from client interview through schematic, design development, and construction documents, and state the purpose and typical output of each stage

  • Interpret a site plan's graphic conventions-north arrow, scale bar, contour lines, spot elevations, setback lines, and utility easements-without a legend

  • Compute slope between two spot elevations and flag gradients that fail accessible-route or drainage thresholds

  • Draft a written program of requirements from a hypothetical residential client brief, separating must-haves from preferences

Your checkpoint

A one-page annotated site-analysis sheet for a single-family lot: existing conditions, three constraints, three opportunities, and a written program of requirements

Week 2

Landscape Design and Planning

  • Apply circulation and spatial-hierarchy principles to organize a residential plan into public, private, and service zones

  • Select hardscape layout patterns (linear, courtyard, mews) and justify each against site geometry and use intensity

  • Compare planting-design frameworks-layering, massing versus specimen, repetition and rhythm-and apply one to a planting-bed sketch

  • Explain how grading, drainage, and stormwater-management concepts (swales, rain gardens, detention) shape the layout before planting begins

Your checkpoint

A scaled schematic plan for a 1,500-square-foot residential rear yard showing zones, circulation, hardscape, and a labeled planting concept

Week 3

Landscape Design and Planning & Site Construction and Materials

  • Translate a schematic plan into dimensioned layout lines, and identify which dimensions govern construction versus which are reference-only

  • Write construction notes and a legend that specify materials, finishes, and installation sequence for a patio and low retaining wall

  • Identify the plan, section, elevation, and detail drawings needed to communicate a design package, and explain what each resolves

  • Review a set of drawings for coordination gaps-missing dimensions, conflicting elevations, unclear callouts-and log the errors

Your checkpoint

A dimensioned layout and detail package for the patio and retaining wall from Week 2, plus a written coordination-review log of at least five issues

Week 4

Site Construction and Materials

  • Compare segmental retaining-wall, poured-in-place concrete, and timber wall systems by structural behavior, drainage requirements, and typical height limits

  • Specify base, subbase, and bedding requirements for unit pavers and flagstone, and explain why compaction and edge restraint determine long-term performance

  • Evaluate concrete mix, reinforcement, and jointing practices, and describe how freeze-thaw exposure and soil conditions affect durability

  • Explain the role of geotextiles, drainage aggregate, and weep points in below-grade and retaining applications

Your checkpoint

A materials specification sheet for three hardscape assemblies (paver patio, concrete walk, retaining wall) with layer thicknesses, compaction, and drainage details

Week 5

Plant Selection and Horticulture

  • Classify plants by light, moisture, and soil-pH tolerance, and match ten species to defined site microclimates

  • Read a USDA hardiness zone map and a plant label to judge whether a species is appropriate for a given site, including heat-zone and exposure caveats

  • Apply right-plant-right-place criteria-mature size, root behavior, maintenance demand, and invasive potential-to screen out unsuitable selections

  • Distinguish native, adapted, and invasive species, and justify native or pollinator-supporting selections in a planting plan

Your checkpoint

A 12-species planting schedule with botanical name, common name, size at maturity, light and moisture needs, hardiness zone, and a one-line justification per species

Week 6

Plant Selection and Horticulture & Landscape Maintenance and Management

  • Build a seasonal maintenance calendar that sequences pruning, fertilizing, mulching, mowing, and irrigation adjustments across the year

  • Apply correct pruning technique-timing by flowering habit, cut placement, and removal limits-and identify common pruning errors

  • Diagnose five common plant problems (chlorosis, drought stress, root rot, pest damage, sunscald) from symptom descriptions and prescribe corrective action

  • Write a soil-management approach covering aeration, organic matter, pH adjustment, and mulch depth

Your checkpoint

A 12-month maintenance calendar for the Week 5 planting plan, plus a one-page diagnostic guide linking five symptoms to causes and corrective actions

Week 7

Irrigation and Water Management & Landscape Maintenance and Management

  • Explain how soil type, plant water need, and climate determine irrigation scheduling, and calculate a weekly run time from a given precipitation rate and target application depth

  • Compare drip, spray, and rotor systems by efficiency, application uniformity, and appropriate use, and identify common design faults such as head-to-head spacing errors and mixed-zone planting

  • Describe water-conservation strategies-hydrozoning, mulching, rain harvesting, smart controllers-and their measurable effect on use

  • Outline a seasonal start-up and winterization procedure, including backflow protection and freeze-damage precautions

Your checkpoint

A hydrozone map for the Week 5 planting plan with a calculated irrigation schedule (zone, precipitation rate, run time, frequency) and a winterization checklist

Week 8

Business Practices and Project Management & Landscape Design and Planning

  • Draft a project budget covering labor, materials, equipment, subcontractors, overhead, and contingency, and set a defensible markup

  • Build a proposal and scope-of-work document that defines deliverables, exclusions, payment schedule, and change-order procedure

  • Sequence a project schedule using task dependencies and identify the critical path for a small residential install

  • Apply contract, liability, and risk-management fundamentals-insurance, lien waivers, warranty terms-to a sample project scenario

  • Integrate all prior deliverables into a portfolio and self-test against the domain weightings to target remaining weak areas

Your checkpoint

A complete project package for one residential project: budget with markup, scope and proposal, task schedule with critical path, and risk register

Milestones

Week 2: Can produce a scaled schematic plan with clearly defined zones and circulation, and defend each layout decision in writing without consulting notes

Week 4: Can specify three hardscape assemblies from memory-layer thicknesses, compaction, and drainage-and catch at least four coordination errors in a sample drawing set

Week 6: Can build a 12-month maintenance calendar and correctly diagnose five plant problems from symptom descriptions alone

Week 8: Can complete a full project package-budget, scope, schedule, risk register-within a timed 90-minute self-test and score 75% or higher on a mixed-domain practice set