Authority Having Jurisdiction (AHJ)

The official or agency that enforces a plumbing code and has final say on compliance, including approving materials, methods, and interpretations where the code is silent or ambiguous.

Related: Permit, Code Interpretation
Permit

A written authorization issued by the AHJ allowing specified plumbing work to proceed; work done without one is typically a violation subject to stop-work orders, fees, or removal.

Related: Authority Having Jurisdiction (AHJ), Inspection
Inspection

The AHJ's on-site verification that installed work matches the approved plans and code, commonly required at stages such as rough-in, underground, and final before systems are covered or used.

Related: Permit, Rough-In
Rough-In

The stage of plumbing work completed before walls, floors, or fixtures are finished, including installed piping, fittings, and supports that must be inspected before concealment.

Related: Inspection, Fixture Unit
Code Interpretation

A formal or informal written opinion from the AHJ resolving how a code section applies to a specific installation, often requested when a design is unusual or the text is unclear.

Related: Authority Having Jurisdiction (AHJ)
Fixture Unit

A dimensionless number expressing the probable load a fixture places on the drainage or water supply system, based on its flow rate, use frequency, and drain size.

Related: Drainage Fixture Unit, Water Supply Fixture Unit, Sizing Table
Drainage Fixture Unit (DFU)

A value assigned to each fixture reflecting its probable discharge into the sanitary drainage system; fixture units are summed to size branches, stacks, and building drains.

Related: Fixture Unit, Building Drain, Stack
Water Supply Fixture Unit (WSFU)

A value reflecting the probable demand a fixture places on the water distribution system, accounting for supply flow rate and simultaneous use; used with demand curves to size piping.

Related: Fixture Unit, Sizing Table, Pressure Loss
Trap Seal

The water layer held in a trap's dip that blocks sewer gas from entering a building; its depth is regulated, typically between two and four inches.

Related: P-Trap, Trap Arm, Vent
P-Trap

A U-shaped fitting that holds a water seal to prevent sewer gas entry while allowing wastewater to pass; it must be self-cleaning and installed level.

Related: Trap Seal, Trap Arm, Fixture Drain
Trap Arm

The pipe section between a trap's outlet and its connection to a drain or stack; its length and slope are limited to protect the trap seal from siphonage.

Related: P-Trap, Vent, Developed Length
Vent

A pipe that admits air to the drainage system or releases gas, protecting trap seals from siphonage and allowing smooth flow; every trap must be vented except where exceptions apply.

Related: Trap Seal, Vent Stack, Air Admittance Valve (AAV)
Vent Stack

A vertical vent pipe extending through the roof that serves one or more drainage stacks, equalizing pressure and discharging sewer gas above the building.

Related: Vent, Stack, Roof Termination
Air Admittance Valve (AAV)

A one-way mechanical valve that opens to admit air into a drain line and closes to prevent gas escape, permitted only under specific conditions and locations set by code.

Related: Vent, Trap Seal
Stack

A vertical pipe carrying wastewater or vent air through multiple floors; soil stacks carry sewage and vent stacks handle air, and both require proper support and cleanouts.

Related: Vent Stack, Building Drain, Cleanout
Building Drain

The lowest horizontal pipe of the drainage system that receives waste from all interior fixtures and conveys it to the building sewer, usually just inside the foundation wall.

Related: Building Sewer, Stack, Cleanout
Building Sewer

The pipe outside the building that carries wastewater from the building drain to the public sewer, private disposal system, or other point of disposal.

Related: Building Drain, Backwater Valve
Cleanout

An accessible fitting with a removable cap that allows a drain line to be rodded or inspected; code sets required locations, spacing, and sizing.

Related: Building Drain, Stack
Slope

The downward pitch of a horizontal drain pipe, expressed as fall per unit length, that keeps solids moving; too little causes clogs and too much can leave liquids behind.

Related: Building Drain, Trap Arm
Backwater Valve

A one-way device installed on a drain to prevent sewage from reversing into a building during surcharge or flooding; required where fixtures are below the upstream manhole.

Related: Building Sewer, Cross-Connection
Cross-Connection

Any actual or potential link between a potable water supply and a source of contamination or pollution, which must be eliminated or protected by an approved backflow preventer.

Related: Backflow, Air Gap, Backflow Preventer
Backflow

The unwanted reversal of water flow in a piping system, caused by backpressure or backsiphonage, that can draw contaminants into the potable supply.

Related: Cross-Connection, Backflow Preventer, Air Gap
Air Gap

The unobstructed vertical distance between a water supply outlet and the flood-level rim of a receiving fixture; it is the most reliable form of backflow protection.

Related: Backflow, Flood-Level Rim, Cross-Connection
Backflow Preventer

A testable or non-testable assembly, such as a reduced-pressure zone device or double check valve, installed to stop reverse flow; many types require annual testing by a certified tester.

Related: Backflow, Cross-Connection, Air Gap
Flood-Level Rim

The top edge of a fixture or receptacle from which water would overflow onto the floor; it sets the height for air gaps and the minimum elevation for certain fixtures.

Related: Air Gap, Fixture
Fixture

A receptacle or device that receives water or waste and discharges it to the drainage system, such as a sink, water closet, or tub; each has code-set clearances and connections.

Related: Flood-Level Rim, Fixture Unit, Water Closet
Water Closet

A toilet fixture that receives waste and discharges through a trap; code regulates its flush volume, rough-in dimensions, and clearance from walls and other fixtures.

Related: Fixture, Trap Seal, Fixture Unit
Water Heater Temperature and Pressure Relief Valve

A safety device that opens to release excess pressure or temperature from a water heater, preventing tank rupture; it must be piped to a safe discharge point.

Related: Thermal Expansion, Water Hammer
Thermal Expansion

The increase in water volume as it is heated in a closed system, which raises pressure and can damage components unless absorbed by an expansion tank or relieved by a valve.

Related: Water Heater Temperature and Pressure Relief Valve, Backflow Preventer
Water Hammer

A pressure surge caused by a sudden stop in water flow, producing banging and stress on piping; arrested by air chambers, water hammer arrestors, or proper pipe sizing.

Related: Pressure Loss, Thermal Expansion
Pressure Loss

The drop in water pressure as water moves through pipe, fittings, and valves due to friction and elevation; it must be calculated to ensure adequate pressure at the farthest fixture.

Related: Water Supply Fixture Unit (WSFU), Water Hammer
Developed Length

The total measured length of a pipe run including fittings and offsets, used in sizing and pressure-loss calculations rather than straight-line distance alone.

Related: Pressure Loss, Trap Arm
Sizing Table

A code-provided chart that converts fixture units or drainage area into required pipe diameter, accounting for slope, building type, and allowable load.

Related: Fixture Unit, Drainage Fixture Unit (DFU), Water Supply Fixture Unit (WSFU)
Storm Drainage

The system that collects and conveys rainwater and other clear water from roofs, yards, and paved areas to a disposal point, kept separate from sanitary drainage.

Related: Roof Drain, Primary and Secondary Roof Drainage
Primary and Secondary Roof Drainage

A two-part roof system where primary drains handle design rainfall while secondary drains or scuppers provide a backup path when primary drains are blocked or overloaded.

Related: Storm Drainage, Roof Drain
Roof Drain

A fitting installed at a roof low point that admits rainwater into the storm system, often with a strainer and a sump to limit debris entry.

Related: Storm Drainage, Primary and Secondary Roof Drainage
Joining Method

The approved technique for connecting pipe and fittings, such as solvent cement, soldering, brazing, press, or threaded joints; each material has code-listed methods and restrictions.

Related: Solvent Cementing, Dielectric Union
Solvent Cementing

A joining method for plastic pipe where cement softens surfaces so they fuse; requires clean, square cuts, proper primer and cement, and adequate cure time before pressure testing.

Related: Joining Method, Pressure Test
Dielectric Union

A fitting that separates dissimilar metals, such as copper and steel, to break electrical continuity and reduce galvanic corrosion at the joint.

Related: Joining Method
Pressure Test

A required check that piping holds specified pressure for a set time without leaks before it is covered or placed in service, often witnessed by the inspector.

Related: Inspection, Solvent Cementing
Roof Termination

The required height and location where a vent stack exits the roof, set to prevent snow blockage and keep gases away from windows, doors, and air intakes.

Related: Vent Stack
Lockout/Tagout

A safety procedure that isolates energy sources and applies tags and locks so equipment cannot be energized during service, protecting workers from shock, burns, or sudden startup.

Related: Personal Protective Equipment (PPE), Confined Space
Confined Space

A space with limited entry or exit that is not designed for continuous occupancy, such as a vault or pit; entry may require testing, ventilation, an attendant, and a permit.

Related: Lockout/Tagout, Personal Protective Equipment (PPE)
Personal Protective Equipment (PPE)

Gear worn to reduce injury risk, including eye protection, gloves, respirators, and hearing protection, selected for the hazards present at the jobsite.

Related: Lockout/Tagout, Confined Space