MS Plumber study materials
MS Plumber study resources

MS Plumber study plan

MS Plumber · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Sanitary Drainage, Vents, and Traps

  • Define and distinguish soil stack, waste stack, vent stack, stack vent, and relief vent per code.

  • Calculate correct trap arm length and vent distance for common fixtures using code tables.

  • Explain the purpose and installation requirements of each trap type (P-trap, drum trap, grease trap).

  • List the six prohibited trap designs and explain why each is disallowed.

Your checkpoint

Create a one-page reference sheet listing all vent types with their code-defined functions, maximum distances, and a sketch of a typical DWV system.

Week 2

Sanitary Drainage, Vents, and Traps

  • Size a building drain and building sewer given total fixture units and slope using code tables.

  • Determine when and where cleanouts are required, including spacing and access requirements.

  • Identify the requirements for horizontal drainage piping support and slope.

  • Explain the difference between a combination waste and vent system and a conventional system.

Your checkpoint

Complete a practice problem set of 10 DWV sizing scenarios (given fixture units and slope, determine pipe size) with at least 80% accuracy.

Week 3

Water Supply and Distribution

  • Calculate minimum pipe size for a water service and building supply using fixture unit counts and pressure requirements.

  • Determine developed length and apply friction loss and elevation changes to size a water distribution system.

  • Explain the requirements for water pressure, flow rate, and pipe sizing for common fixtures.

  • Identify the minimum and maximum allowable pressures in a water distribution system.

Your checkpoint

Produce a water supply sizing worksheet for a two-story single-family dwelling, showing fixture units, developed length, and selected pipe sizes for each section.

Week 4

Plumbing Definitions, Fixtures, and Fixture Fittings & Plumbing Math, Sizing, and Fixture Units

  • Compute total fixture units for a given building layout using standard fixture unit values.

  • Determine minimum fixture clearances and installation requirements for water closets, lavatories, and bathtubs.

  • Calculate the required number of fixtures for a commercial occupancy based on occupant load and code ratios.

  • Solve plumbing math problems involving pipe volume, capacity, and conversion between units.

Your checkpoint

Complete a comprehensive fixture unit calculation and fixture count for a small commercial building (e.g., office with restrooms) and verify against code minimums.

Week 5

Joining Methods, Materials, and Piping Installation & Backflow Prevention, Cross-Connection Control, and Potable Water Protection

  • Select the correct joining method for copper, PEX, CPVC, PVC, and cast iron based on application and code.

  • Describe the installation requirements for backflow prevention assemblies (RPZ, DCVA, PVB, AVB) and when each is required.

  • Identify the five types of backflow prevention devices and their testing requirements.

  • Explain the concept of cross-connection and list at least five common cross-connection hazards.

Your checkpoint

Create a comparison table of joining methods for five piping materials, including appropriate applications, code restrictions, and a list of backflow prevention devices with their typical uses.

Week 6

Storm Drainage and Special Plumbing Systems & General Regulations, Licensing, and Code Administration

  • Size a storm drainage system for a flat roof given rainfall intensity and roof area.

  • Explain the requirements for secondary (emergency) roof drains and scuppers.

  • Describe the licensing and permit process for plumbing work in your jurisdiction.

  • Identify the key differences between the plumbing code and local amendments that may affect your work.

Your checkpoint

Complete a storm drainage sizing problem for a 5,000 sq ft roof with a given rainfall rate, and write a one-page summary of the permit and inspection process for a typical residential plumbing project.

Week 7

Safety, Tools, and Jobsite Practices & Backflow Prevention, Cross-Connection Control, and Potable Water Protection

  • List the personal protective equipment required for common plumbing tasks and explain when each is necessary.

  • Identify safety hazards associated with trenching, soldering, and working with chemicals, and describe mitigation steps.

  • Explain the testing and maintenance requirements for backflow prevention assemblies.

  • Describe the procedure for conducting a cross-connection survey of a commercial building.

Your checkpoint

Develop a jobsite safety checklist for a plumbing installation project, covering PPE, tool use, and hazard communication, and outline a cross-connection survey plan for a restaurant.

Week 8

General Regulations, Licensing, and Code Administration & Plumbing Definitions, Fixtures, and Fixture Fittings & Water Supply and Distribution & Sanitary Drainage, Vents, and Traps & Storm Drainage and Special Plumbing Systems & Joining Methods, Materials, and Piping Installation & Plumbing Math, Sizing, and Fixture Units & Backflow Prevention, Cross-Connection Control, and Potable Water Protection & Safety, Tools, and Jobsite Practices

  • Review and summarize key code sections from all domains, focusing on frequently tested requirements.

  • Complete a full-length practice exam under timed conditions and score at least 75%.

  • Review incorrect answers and create flashcards for weak areas.

  • Verify exam-day logistics: test center location, required identification, and permitted reference materials.

Your checkpoint

Achieve a passing score on a timed 100-question practice exam and compile a list of 20 code sections to review again before exam day.

Milestones

Week 4: Score at least 70% on a 30-question quiz covering DWV and water supply sizing, and correctly complete the fixture unit calculation deliverable without errors.

Week 6: Score at least 75% on a 50-question mixed quiz covering all domains studied so far, with particular attention to storm drainage and regulations.

Week 8: Achieve a score of 75% or higher on a full-length timed practice exam and demonstrate mastery of backflow prevention and safety by scoring at least 80% on those sections.