MT General Contractor flashcards
MT General Contractor · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Sole Proprietorship Liability
- A business owned by one person with no separate legal identity; the owner reports business income on a personal tax return and is personally liable for all business debts and judgments.
- Qualifying Party Requirement
- The individual who passed the contractor licensing exam and is actively engaged in the business; if that person leaves, the firm must designate a replacement within the state's deadline or the license lapses.
- Limited Liability Company
- An entity whose members generally are not personally liable for business debts beyond their investment; commingling funds or ignoring formalities can allow creditors to pierce that protection.
- Contract Formation Elements
- An enforceable contract requires an offer, acceptance, consideration, and legal purpose, plus mutual intent to be bound rather than a mere agreement to agree in the future.
- Contract Document Priority
- The order of precedence among contract documents; typically the agreement controls, specifications control over drawings for quality, and drawings control for quantity and location.
- Differing Site Conditions
- Type I is a condition materially different from the contract documents; Type II is an unknown physical condition of unusual nature. Both usually require written notice before the work is disturbed.
- Pay-If-Paid Clause
- A subcontract clause making owner payment a condition precedent to the contractor's duty to pay the subcontractor; many states void or restrict it, unlike the pay-when-paid timing clause.
- Notice and Claim Deadlines
- Contract clauses requiring written notice of a claim within a short period, often 7 to 21 days after the event, with a detailed claim to follow; missing the deadline usually waives the claim.
- Contingency in Estimates
- A percentage added to the base estimate for unknowns; commonly 5 to 10 percent for well-defined design-bid-build work and 10 to 20 percent at schematic design.
- Unbalanced Bid
- A bid that prices some unit items above and others below actual cost, often front-loading early work or inflating quantities likely to increase; may be rejected as materially unbalanced.
- Bid Responsiveness Versus Responsibility
- Responsiveness is whether the bid conforms to the invitation, including forms, bonds, and addenda; responsibility is the bidder's capacity, experience, and financial fitness to perform.
- Addendum Acknowledgment
- Each addendum issued during bidding becomes part of the contract documents; the bidder must acknowledge every addendum on the bid form or the bid may be rejected as nonresponsive.
- Critical Path Definition
- The longest path through the schedule network, having zero total float; any delay to an activity on this path delays project completion by the same amount.
- Total Float Formula
- Total float equals late start minus early start, or late finish minus early finish; free float is the time an activity can slip without delaying any successor's early start.
- Schedule Compression Methods
- Crashing adds resources to critical activities at higher cost; fast-tracking overlaps activities that were sequential, saving time but increasing coordination and rework risk.
- Earned Value Indexes
- CPI equals earned value divided by actual cost; SPI equals earned value divided by planned value. Values below 1.0 indicate cost overrun or schedule slippage respectively.
- Excusable Versus Compensable Delay
- Excusable delay is owner-caused or force majeure and justifies time only; compensable delay is owner-caused and justifies time and money; contractor-caused delay justifies neither.
- Fall Protection Threshold
- In construction, employees exposed to falls of 6 feet or more must be protected by guardrails, safety nets, personal fall arrest, or an approved fall protection plan where permitted.
- Competent Person Definition
- A person capable of identifying existing and predictable hazards and authorized to take prompt corrective action; required for trench inspections, scaffold erection, and similar high-hazard tasks.
- Trench Protective System Depth
- A competent person must inspect excavations daily and after rain; protective systems such as sloping, shoring, or shielding are required at 5 feet deep and at any depth where a hazard exists.
- OSHA Fatality Reporting
- Work-related fatalities must be reported to OSHA within 8 hours; in-patient hospitalizations, amputations, and losses of an eye must be reported within 24 hours.
- Water-Cementitious Ratio
- The ratio of water to cementitious material in a concrete mix; lowering it increases compressive strength and reduces permeability, while raising it improves workability but weakens the concrete.
- Concrete Slump Test
- A measure of fresh concrete workability; structural concrete commonly falls in a 4 to 6 inch range, and admixtures such as superplasticizers can increase slump without adding water.
- High-Strength Bolted Connections
- Structural steel connections using A325 or A490 bolts tensioned to a specified pretension; installation is verified by turn-of-nut, calibrated wrench, or direct tension indicator methods.
- Soil Swell and Shrinkage
- Excavated bank soil expands when loosened, called swell, and compacted fill occupies less than its original bank volume, called shrinkage; both factors convert volumes for haul and pricing.
- OSHA Excavation Slope Ratios
- Maximum allowable slopes in the OSHA tables are 3/4:1 horizontal to vertical for Type A soil, 1:1 for Type B, and 1 1/2:1 for Type C; spoil and equipment stay 2 feet back.
- Concrete Free-Fall Limit
- Concrete should not be dropped freely more than about 3 to 4 feet; greater drops cause segregation of aggregates, so use a tremie or drop chute for deeper placements.
- Mechanics Lien Right
- A statutory claim against improved real property by a contractor, subcontractor, or supplier who furnished labor or materials; the claimant must record the lien within the state's deadline after last furnishing.
- Preliminary Lien Notice
- A pre-lien notice sent to the owner and lender within a set period after first furnishing labor or materials; failing to send it can forfeit the claimant's lien rights in many states.
- Surety Bond Types
- A bid bond guarantees the bidder will sign the contract; a performance bond guarantees completion; a payment bond guarantees subcontractors and suppliers are paid on the project.
- NPDES Construction Permit
- Required for construction disturbing 1 acre or more, or less than 1 acre as part of a larger common plan; the permit requires a Stormwater Pollution Prevention Plan and best management practices.
- SPCC Plan Threshold
- A Spill Prevention, Control, and Countermeasure plan is generally required for facilities storing more than 1,320 gallons of oil aboveground, subject to aggregation rules, with secondary containment and inspections.