MT General Contractor study plan
MT General Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Business Organization and Licensing & Contracting Law and Contracts
Map each business-entity type (sole proprietorship, general partnership, LLC, corporation, joint venture) to its liability, taxation, and licensing consequences, and write a one-page comparison table from memory
Trace the contractor-licensing pathway in your state: application, qualifying party/qualifier exam, classification limits, renewal, and disciplinary grounds, and list each step with the agency that controls it
Distinguish the elements of a valid contract (offer, acceptance, consideration, capacity, legality) and identify at least three contract defenses that void or voidable agreements
Classify the standard contract types (lump sum, unit price, cost-plus, GMP, T&M, design-build) by how risk and quantity uncertainty shift between owner and contractor
Summarize the effect of the key clauses found in most construction contracts: scope, changes, differing site conditions, time, payment, indemnity, and termination
Your checkpoint
A two-page written summary containing the entity comparison table, the state licensing pathway, and a clause-by-clause risk matrix for the six contract types
Contracting Law and Contracts & Business Organization and Licensing
Analyze how change orders, constructive changes, and cardinal changes affect contract price and time, and draft sample language for a change-order clause
Explain the doctrine of substantial performance and how it interacts with progress payments, retainage, and final acceptance
Identify the remedies for breach (damages, specific performance, termination) and distinguish direct, consequential, and liquidated damages with a numeric example of each
Describe the subcontractor relationship: flow-down clauses, pay-when-paid versus pay-if-paid, pass-through claims, and back-charge procedures
Review a sample AIA-style agreement and a sample subcontract to locate where risk allocation differs between them
Your checkpoint
A one-page risk-allocation memo comparing prime contract and subcontract terms, plus three original change-order clause drafts
Estimating and Bidding & Project Management and Scheduling
Build a quantity takeoff for a small hypothetical project (footings, slab, walls, roofing) using dimensioned descriptions and show the arithmetic for each line item
Apply the standard estimating structure: direct labor, material, equipment, subcontractor, indirect costs, overhead, contingency, and profit, and compute a bid price from a cost buildup
Compute unit costs and productivity rates from crew-hour data, and adjust labor rates for burden and overtime
Differentiate bid-shopping, bid-shopping protection, addenda handling, bid bonds, and the rules governing withdrawal or modification of a bid before opening
Construct a basic critical path method network from an activity list, identify the critical path, and compute total float for at least three activities
Your checkpoint
A complete bid package for the hypothetical project: takeoff sheets, cost buildup to a bid price, and a CPM network with the critical path and float values marked
Project Management and Scheduling & Estimating and Bidding
Distinguish the schedule types (bar chart, CPM, linear/LOB) and select the appropriate one for three different project scenarios with justification
Perform a forward and backward pass on a 15-activity network and verify early start, early finish, late start, late finish, and float for each activity
Explain resource leveling versus resource smoothing and describe how each affects the critical path
Interpret schedule performance using earned value: compute BCWS, BCWP, ACWP, SPI, and CPI from a sample dataset and state what each result signals
Prepare a short schedule-update narrative that documents delay events, fragnet insertion, and time-extension justification
Your checkpoint
A 15-activity CPM schedule with full forward/backward pass calculations plus a one-page earned-value analysis with SPI and CPI interpreted
Safety and Occupational Health (OSHA) & Construction Materials and Methods
Identify the OSHA standards most frequently cited in construction (fall protection, scaffolding, ladders, excavation, PPE, hazard communication, silica) and state the trigger threshold or requirement for each
Explain the multi-employer worksite doctrine and the duties of creating, exposing, correcting, and controlling employers
Outline the components of a site-specific safety plan: hazard assessment, competent-person designations, training records, incident investigation, and emergency response
Match common construction materials (concrete, masonry, steel, wood, gypsum, roofing, insulation) to their structural role, installation sequence, and typical failure modes
Describe the inspection and testing methods applied to those materials and the point in the sequence at which each test occurs
Your checkpoint
A safety and materials reference sheet: a table of at least 12 OSHA requirements with thresholds and a table of at least 10 materials with role, sequence, and test method
Site Work, Excavation, and Concrete & Construction Materials and Methods
Sequence a site-development operation from clearing and grubbing through rough grading, utility installation, and finish grading, naming the equipment used at each step
Classify soils by the Unified Soil Classification System and explain how classification drives excavation support, dewatering, and bearing capacity decisions
Compute cut-and-fill volumes using the average-end-area or prismoidal method on a sample cross-section set, and state how shrinkage and swell factors adjust the numbers
Explain OSHA excavation requirements: protective systems by depth and soil type, spoil placement, access/egress, and daily competent-person inspection
Describe concrete mixture design, batching, placement, consolidation, curing, and testing (slump, air content, compressive cylinders), and identify the defects caused by poor practice in each step
Your checkpoint
A site-work and concrete plan for a hypothetical building pad: cut/fill calculations with swell/shrinkage adjustments, a soil classification summary, and a concrete placement and testing checklist
Lien Law, Payment, and Risk Management & Environmental and Regulatory Compliance
Trace the mechanics of a mechanics lien from preliminary notice through recording, perfection, and enforcement, and identify the deadlines that apply to owners, primes, and subs
Explain how payment bonds, lien waivers (conditional and unconditional, progress and final), and joint-check arrangements protect or expose each party
Describe the risk-management cycle: identify, assess, transfer, retain, and monitor, and place insurance (GL, builders risk, workers comp, umbrella) and surety products within it
Identify the environmental permits and approvals commonly triggered by construction (NPDES/stormwater, air, wetlands, endangered species, historical preservation) and the activity that triggers each
Outline stormwater pollution prevention plan contents, erosion and sediment controls, and hazardous-waste and asbestos/lead handling obligations during renovation
Your checkpoint
A lien-and-compliance timeline that plots every notice and recording deadline on a project calendar, paired with a permit matrix listing trigger activity, issuing agency, and required control measures
Business Organization and Licensing & Contracting Law and Contracts & Estimating and Bidding & Project Management and Scheduling & Safety and Occupational Health (OSHA) & Construction Materials and Methods & Site Work, Excavation, and Concrete & Lien Law, Payment, and Risk Management & Environmental and Regulatory Compliance
Complete a timed full-length practice set under exam conditions and record the score by domain to expose weak areas
Re-teach the three lowest-scoring domains by rewriting each key concept in your own words without reference material, then verify against your notes
Drill the numerical skills that recur across domains: cost buildup, float, earned value, cut/fill, and concrete yield, until each is completed accurately without notes
Build a one-page formula and deadline sheet covering the computations and statutory time limits you must recall on exam day
Simulate the exam-day routine: confirm testing logistics, permitted reference materials, and a pacing plan for the item count and time limit
Your checkpoint
A scored practice-exam report by domain plus a one-page formula and deadline sheet that you can reproduce from memory
Milestones
Week 2: Score at least 80% on a self-written 20-question quiz covering business organization and contract law, and explain each wrong answer aloud without notes
Week 4: Produce a correct forward/backward pass and bid buildup for a fresh problem set with no reference material, scoring at least 75%
Week 6: Score at least 75% on a mixed set drawn from safety, materials, and site-work/concrete, and correctly compute one cut/fill volume with swell adjustment
Week 8: Achieve a full-length practice score at or above your target passing margin, with no single domain below 60%