- Presupuesto de ejecución material (PEM)
- Related: Medición, Presupuesto de ejecución por contrata (PEC), Precio descompuesto
The net cost of executing the works, calculated from measured quantities, unit prices and labour, without general expenses, contractor profit, taxes or professional fees. It is the base figure from which the contractor's tender price and the client's budget are built up.
- Medición
- Related: Presupuesto de ejecución material (PEM), Certificación de obra
The systematic counting and measuring of each construction unit from the drawings and specifications to obtain quantities. Results are tabulated by chapter and code so that they can be priced, compared with site records and certified for payment.
- Precio descompuesto
- Related: Presupuesto de ejecución material (PEM), Certificación de obra
A unit price broken down into its components: labour hours and cost, materials with waste allowance, machinery, and small auxiliary means. The breakdown justifies the price, allows review when conditions change and supports the analysis of variations.
- Presupuesto de ejecución por contrata (PEC)
- Related: Presupuesto de ejecución material (PEM), Certificación de obra
The PEM increased by general expenses and the contractor's industrial profit, expressed as percentages. It represents the price the developer pays the builder and is the basis for comparing tenders before taxes and professional fees are added.
- Certificación de obra
- Related: Medición, Precio descompuesto, Modificado de obra
A periodic statement issued by the site professional certifying quantities actually executed in a period and their value. It triggers interim payment, records progress against programme and becomes the documentary basis for the final settlement.
- Modificado de obra
- Related: Certificación de obra, Contrato de obra
A formal amendment to the contract covering changes in scope, quantities, units or timing ordered during construction. It must be justified, priced with agreed or approved rates and approved in writing before execution to preserve the right to payment.
- Contrato de obra
- Related: Modificado de obra, Garantía decenal, Revisión de precios
The agreement that defines scope, price, schedule, payment terms, guarantees and the allocation of risk between developer and contractor. Its clauses determine which party bears cost overruns, delays, ground conditions and price revision.
- Revisión de precios
- Related: Contrato de obra, Certificación de obra
A contractual mechanism adjusting the contract price during long works to reflect changes in input costs, usually through agreed indices or formulas. It requires an express clause and legal basis; without it the price normally stays fixed.
- Garantía decenal
- Related: Contrato de obra, Responsabilidad civil del profesional, Recepción de obra
A statutory liability period, commonly ten years, during which the builder and other participants answer for material damage to the building caused by defects affecting structure, foundations or habitability. It runs from acceptance of the completed works.
- Recepción de obra
- Related: Garantía decenal, Responsabilidad civil del profesional
The formal act by which the client accepts completed works, with or without reservations, starting the guarantee periods and the limitation period for claims. A record is signed listing any defects to be corrected.
- Responsabilidad civil del profesional
- Related: Garantía decenal, Recepción de obra, Visado colegial
The duty of the architect or engineer to compensate damage caused by negligent or defective professional services. It may arise from design errors, supervision failures or breach of statutory duties and is usually covered by liability insurance.
- Visado colegial
- Related: Responsabilidad civil del profesional, Licencia de obras
The compulsory or voluntary check of a project by the professional association before works begin, verifying the practitioner's standing and the formal completeness of documents. It does not certify technical correctness or replace the designer's responsibility.
- Licencia de obras
- Related: Planeamiento urbanístico, Visado colegial
The municipal authorisation required before construction, alteration or demolition. It verifies that the proposal conforms to planning rules, and building without it is an infringement that can lead to stoppage, fines or demolition orders.
- Planeamiento urbanístico
- Related: Licencia de obras, Edificabilidad, Coeficiente de ocupación
The hierarchy of plans - general and detailed - that classify land, fix buildable area, uses and densities, and reserve public space. Each project must demonstrate conformity with the applicable plan and its detailed determinations.
- Edificabilidad
- Related: Planeamiento urbanístico, Coeficiente de ocupación, Retranqueo
The ratio of permitted built floor area to plot area, expressed as square metres buildable per square metre of land. It caps the total area that may be constructed and thus drives massing, unit count and project value.
- Coeficiente de ocupación
- Related: Edificabilidad, Retranqueo
The fraction of a plot that may be covered by the building footprint. Together with height limits and setbacks it controls building form and open space, and it is checked at both planning and licensing stage.
- Retranqueo
- Related: Coeficiente de ocupación, Edificabilidad
The minimum distance a building must be set back from plot boundaries, streets or other buildings. It ensures daylight, privacy, fire separation and public space, and constrains the footprint used in design and measurement.
- Acción sísmica
- Related: Coeficiente de seguridad, Ductilidad, Estado límite último
The dynamic load imposed on a structure by ground motion during an earthquake, represented in codes by design spectra and equivalent static forces. Its magnitude depends on site seismicity, soil type, ductility and building importance.
- Estado límite último
- Related: Coeficiente de seguridad, Estado límite de servicio, Acción sísmica
A design condition beyond which the structure fails or becomes unsafe, such as collapse, buckling, fatigue or loss of equilibrium. Ultimate limit states are checked with factored loads and reduced material strengths to achieve a defined reliability.
- Estado límite de servicio
- Related: Estado límite último, Coeficiente de seguridad
A design condition in which the structure no longer performs acceptably in normal use, for example excessive deflection, cracking or vibration. Serviceability checks use unfactored loads and protect finishes, drainage and comfort.
- Coeficiente de seguridad
- Related: Estado límite último, Acción sísmica
A multiplier applied to loads or a divisor applied to resistance so that the design keeps a margin against unfavourable outcomes. Partial factors, applied separately to actions and materials, replace the single global factor in modern codes.
- Ductilidad
- Related: Acción sísmica, Estado límite último
The capacity of a structural element to deform beyond yield without losing strength, dissipating energy. It is essential for seismic behaviour and is achieved through detailing: confinement, anchorage lengths and limited reinforcement ratios.
- Hormigón armado
- Related: Recubrimiento de armaduras, Curado del hormigón, Ductilidad
A composite material in which steel bars resist tension and shear while concrete resists compression. Performance depends on adequate cover, correct bar spacing, compaction and curing, and on the bond between steel and concrete.
- Recubrimiento de armaduras
- Related: Hormigón armado, Curado del hormigón
The thickness of concrete between the outer steel bar and the exposed surface. It protects reinforcement from corrosion and fire, ensures bond, and must respect minimum values set for exposure class and fire resistance.
- Curado del hormigón
- Related: Hormigón armado, Recubrimiento de armaduras
The controlled retention of moisture and temperature in fresh concrete so that cement hydration continues. Inadequate curing reduces strength, durability and surface resistance, and is a frequent cause of early-age cracking.
- Aislamiento térmico
- Related: Puente térmico, Transmitancia térmica, Demanda energética
Material or system that reduces heat flow through the building envelope by its low thermal conductivity. Its performance depends on thickness, continuity, absence of thermal bridges and protection from moisture.
- Transmitancia térmica
- Related: Aislamiento térmico, Puente térmico, Demanda energética
The rate of heat flow through one square metre of an element per kelvin of temperature difference, measured in W/(m²·K). Lower values mean better insulation; limits are set by energy codes for walls, roofs, floors and glazing.
- Puente térmico
- Related: Aislamiento térmico, Transmitancia térmica
A localised zone where the envelope conducts heat much faster than the surrounding area, such as a slab edge or window lintel. It causes heat loss, surface condensation and mould, and must be corrected by continuity of insulation.
- Demanda energética
- Related: Transmitancia térmica, Aislamiento térmico
The amount of energy a building needs to maintain comfort conditions, calculated before accounting for system efficiency. Reducing demand through envelope, shading and ventilation is the first step in the energy hierarchy.
- Instalación de fontanería
- Related: Evacuación de aguas, Ventilación
The network of supply pipes, fittings, valves and storage that delivers potable water at adequate pressure and quality to fixtures. Design covers flow rates, pressure loss, protection against backflow and separation from drainage.
- Evacuación de aguas
- Related: Instalación de fontanería, Ventilación
The system of drains, stacks, traps and vents that removes wastewater and rainwater from a building. It relies on water seals, adequate slopes and venting to prevent odours and sewer gases entering occupied spaces.
- Ventilación
- Related: Evacuación de aguas, Instalación de fontanería
The controlled supply and extraction of air to remove pollutants, moisture and heat and to support combustion appliances. It may be natural or mechanical, and must be balanced to avoid pressure reversal and back-draughting.
- Plan de seguridad y salud
- Related: Coordinador de seguridad y salud, Planificación de obra
The site-specific document that identifies hazards, defines preventive measures, protective equipment and emergency procedures, and assigns responsibilities. It is mandatory before work starts and is updated as the works evolve.
- Coordinador de seguridad y salud
- Related: Plan de seguridad y salud, Planificación de obra
The professional appointed to coordinate safety measures among the various contractors and self-employed workers on site. The role includes approving safety plans, organising access and shared facilities, and stopping unsafe work.
- Planificación de obra
- Related: Camino crítico, Plan de seguridad y salud
The sequencing of activities, durations, resources and dependencies to deliver the project by the required date. Tools include the Gantt chart and the critical path method, which identifies activities whose delay postpones completion.
- Camino crítico
- Related: Planificación de obra, Certificación de obra
The longest chain of dependent activities through a network, fixing the shortest possible project duration. Any delay on a critical activity delays completion unless float elsewhere is used or the logic is changed.
- Dirección facultativa
- Related: Certificación de obra, Responsabilidad civil del profesional
The technical team, typically architect and engineer, responsible for interpreting the design, issuing instructions, controlling quality and certifying the works on behalf of the client. It is distinct from the contractor's own site management.