Perit Warrant Exam study materials
Perit Warrant Exam study resources

Perit Warrant Exam: Energy Efficiency and Sustainability

Perit Warrant Exam · Work through your exam, one topic at a time.

All guide sections

Energy Efficiency and Sustainability

Energy Efficiency and Sustainability tests CTE DB-HE, the certificado de eficiencia energética and the design choices that reduce demand and consumption.

DB-HE 2019

HE0 limits energy consumption; HE1 limits demand through envelope and glazing; HE2 covers thermal installations (with RITE); HE3 covers lighting efficiency; HE4 requires solar thermal for domestic hot water; HE5 requires photovoltaic generation in larger buildings. The CEE follows RD 390/2021.

Envelope first

Insulation, glazing and solar control reduce demand before renewables are sized. Thermal bridges and airtightness often dominate real consumption, so a good U-value on paper can still fail in practice.

Worked example

A dwelling for 4 people with HE4 demand of 28 litres/person/day at 60 °C, cold water at 15 °C. Annual volume = 28 × 4 × 365 = 40,880 litres. Energy = 40,880 × 4.18 × 45 / 3600 ≈ 2,136 kWh. A 60% solar fraction supplies about 1,282 kWh, leaving about 854 kWh from the backup system.

Traps

  • Mixing demand (kWh/m²·year) with installed power.
  • Forgetting the 60 °C reference temperature.
  • Claiming a solar fraction without checking shading.
  • Ignoring thermal bridges and airtightness, which dominate real demand.