Friday Night Overflow to a Creek Tributary

MT Water/Wastewater Operator · Put your knowledge to work in context.

All case studies

Friday Night Overflow to a Creek Tributary

At 21:40 on a Friday a homeowner reports sewage surfacing in a backyard. The crew finds sewage escaping from a manhole at roughly 40 gpm into a grass swale that runs 600 ft to a creek; the creek is a quarter mile downstream of the swale's outfall. Upstream is 3 miles of 10-inch vitrified clay gravity main serving about 1,200 connections, and a lift station discharges into the top of that line. The upstream manhole is holding at a high level. A grease ring is visible on the manhole wall, and rainfall in the last 24 hours was 0.2 inch.

The nearest downstream manhole is 350 ft away. The vactor is 25 minutes out, and a second crew can be called in. Two portable pumps and 300 ft of discharge hose are on the truck. The state requires telephone notice within 24 hours for any sanitary sewer overflow reaching surface water, with written follow-up within five days, and the city's overflow response plan assigns the utility the duty to contain, recover, and estimate volume.

1. Give your action sequence for the first 60 minutes and explain why each step sits where it does.

Read the worked answer

1. Protect people. Barricade the area, keep children and pets out, and tell the homeowner what is happening. Untreated sewage in a yard is a direct exposure risk, and this takes two minutes.

2. Contain before you clear. Build a berm or sandbag dam across the swale and block any storm inlets between the spill and the creek. Whether the spill reaches surface water drives the reporting tier and the environmental damage, and a few hundred feet of swale is the cheapest place you will ever stop it.

3. Stop the source. Once containment is in place, work the blockage: hydraulic flushing from the downstream manhole toward the blockage, and rodding or vactor work from the upstream manhole. Do not spend the first hour on cleanup while 40 gpm keeps running.

4. Manage flow. Throttle or cycle the lift station if wet well storage allows, to cut the discharge rate while the line is being cleared.

5. Recover. Pump standing sewage from the yard back into the downstream manhole with the portable pumps; do not wash it into the swale. Lime or disinfect the affected ground after recovery.

6. Notify and document as you go. Call the state early in the event rather than at the deadline, start the volume estimate, photograph everything, and log times. Contemporaneous notes are what the written report is built from.

2. How do you estimate the spill volume and meet the notification requirements?

Read the worked answer

Volume. Volume equals flow rate times duration. At 40 gpm you are discharging 2,400 gallons per hour. The start time is the unknown, so bound it: check the lift station SCADA for pump run time and totalized flow to see when the wet well stopped keeping up, check the upstream manhole level history, and use the homeowner's report. If the lift station began running continuously around 18:20, then 3.3 hours to 21:40 gives roughly 8,000 gallons, plus whatever discharges until the blockage is cleared. Present the number as a range with its derivation and revise it after cleanup. Regulators accept an honest estimate with a stated method; they do not accept a guess with no basis.

Notification. Make the telephone report to the state well inside the 24-hour window, as soon as you have a credible volume range, and include location, receiving water, cause, estimated volume, and corrective action. Follow with the written report within five days, adding sampling results and photos. Notify the county health department and consider downstream property owners if the creek is used for recreation. Check the NPDES permit for a bypass reporting condition and follow it.

Sampling. Collect upstream, downstream, and outfall samples if the spill reaches the creek, and hold them per the lab's instructions. Document the grease ring and the CCTV result, because the root cause belongs in the report too.

3. The crew wants to rod from the upstream manhole, which is surcharged, to find the blockage faster. What are the hazards and how do you control them?

Read the worked answer

Opening a surcharged manhole is a category of work that injures and kills people.

  • Sudden release. The cover may be under head. When it breaks free, sewage and debris can come out under pressure. Break the seal with a pick while standing to the side, never over the cover, and keep your face and body clear of the opening.
  • Atmosphere. A surcharged sewer is a confined space with little air exchange. Hydrogen sulfide and methane can be present and the sewage surface is near the rim. Test before leaning over, and do not enter.
  • Surge when the blockage clears. Once the line opens, a slug of backed-up sewage moves downstream fast. Anyone near the downstream manhole must be warned and clear before you break the blockage.
  • Contact and contamination. Full PPE, including gloves, eye protection, boots, and a change of clothing; wash before eating or leaving the site.
  • Traffic and public. Cones and barricades, and keep the homeowner and neighbors away from the spill area.

Work from the surface with the vactor and rods wherever possible. If the upstream manhole must be opened to rod, treat it as a confined space decision with testing and ventilation, not a quick chore.