MT Water/Wastewater Operator study materials
MT Water/Wastewater Operator study resources

MT Water/Wastewater Operator study plan

MT Water/Wastewater Operator · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Drinking Water Treatment & Regulations, Safety, and Administration

  • Map the full drinking water treatment train from source to finished water, naming the purpose of each unit process (coagulation, flocculation, sedimentation, filtration, disinfection) and the contaminant each one targets

  • Calculate chemical feed rates in mg/L and lb/day for alum, chlorine, and fluoride using the lb/day = mg/L x MGD x 8.34 relationship, working at least 15 problems without a formula sheet

  • Explain the difference between primary and secondary drinking water standards and list the regulated contaminant groups (microbial, disinfection byproducts, disinfectants, inorganic, organic, radionuclides) with one example each

  • Describe the surface water treatment rule concepts of CT (concentration x contact time), log inactivation credits, and turbidity limits for filtered systems

  • Build a one-page formula and unit-conversion reference card you will use all eight weeks

Your checkpoint

A one-page formula card plus a scored 20-problem calculation set (feed rate, detention time, filter loading rate) with every wrong answer reworked by hand

Week 2

Drinking Water Treatment & Drinking Water Distribution

  • Compare conventional, direct filtration, slow sand, and membrane treatment trains and state which raw water conditions favor each

  • Work through jar testing interpretation: read a jar test result sheet and select the coagulant dose and pH that best meets a target finished turbidity

  • Calculate filter loading rate in gpm/ft2 and backwash rate, and identify the signs of filter breakthrough, mudball formation, and air binding

  • Trace finished water from the clearwell through high-service pumping and storage, and explain how storage tank turnover and water age affect disinfectant residual

  • Explain disinfection byproduct formation tradeoffs between chlorine, chloramine, ozone, and UV, including when each is chosen

Your checkpoint

A written treatment-train comparison table (five processes x raw water quality, residuals, byproducts, operator control points) plus a 10-question self-quiz scored at 80% or better

Week 3

Drinking Water Distribution & Regulations, Safety, and Administration

  • Identify the components of a distribution system (mains, service lines, hydrants, valves, meters, storage, booster stations) and state the function and typical failure mode of each

  • Calculate head loss using the Hazen-Williams concept, convert between pressure in psi and head in feet (psi x 2.31), and solve flow-through-orifice and fire-flow problems

  • Explain cross-connection control: identify backflow hazards, distinguish backpressure from backsiphonage, and match the correct device (air gap, RPZ, double check, vacuum breaker) to each hazard

  • Describe main flushing, valve exercising, and hydrant maintenance programs and the recordkeeping each requires

  • Summarize distribution sampling requirements for total coliform and chlorine residual, including sample siting, frequency, and repeat sampling triggers

Your checkpoint

A distribution system diagram of your own utility or a hypothetical system, annotated with pressure zones, storage, backflow devices, and sampling locations, plus five solved hydraulic problems

Week 4

Wastewater Treatment & Regulations, Safety, and Administration

  • Draw the wastewater treatment train from influent through preliminary, primary, secondary, and disinfection to outfall, and state the removal mechanism at each stage

  • Calculate BOD and TSS removal efficiency, food-to-microorganism ratio, mean cell residence time (sludge age), and solids loading rate

  • Explain the activated sludge process control levers (return activated sludge rate, waste rate, dissolved oxygen, mixed liquor suspended solids) and what each does to effluent quality

  • Interpret a set of lab results (BOD, TSS, ammonia, dissolved oxygen, pH, settleability/SVI) and write a short diagnosis of the likely process problem

  • State the National Pollutant Discharge Elimination System permit structure: effluent limits, monitoring frequency, reporting deadlines, and bypass/upset reporting duties

Your checkpoint

A completed process-control worksheet using one week of realistic plant data, including calculated F/M, MCRT, and SVI with a one-paragraph written diagnosis

Week 5

Wastewater Treatment & Wastewater Collection

  • Describe collection system components (gravity mains, manholes, lift stations, force mains, laterals) and the design slope and velocity ranges that keep solids moving

  • Calculate pipe slope, flow velocity, and detention time in a wet well, and size a pump cycle using wet well volume and pump rate

  • Explain infiltration and inflow, how each is detected, and the rehabilitation methods (lining, grouting, replacement, root control) used to reduce them

  • Identify the hazards and procedures for confined space entry in manholes and wet wells, including atmospheric testing order, ventilation, attendant duties, and retrieval systems

  • Describe lift station operation and maintenance: pump alternating, alarm response, odor and corrosion control (H2S), and emergency bypass planning

Your checkpoint

A lift station operating and emergency response checklist covering alarms, wet well levels, confined space entry, and power-failure bypass, plus five solved slope/velocity problems

Week 6

Wastewater Collection & Regulations, Safety, and Administration

  • Explain the major collection system capacity assessment tools (flow monitoring, smoke testing, dye testing, CCTV inspection, I/I modeling) and what each reveals

  • Describe gravity sewer cleaning methods (rodding, jetting, bucket machines) and match the method to the obstruction type

  • Summarize the safety program elements a utility must maintain: hazard communication, lockout/tagout, personal protective equipment, respiratory protection, fall protection, and emergency action plans

  • Apply chemical safety rules for chlorine, sulfur dioxide, sodium hypochlorite, and treatment polymers, including storage separation and leak response

  • Describe recordkeeping and reporting obligations for collection system overflows, including immediate notification and follow-up written reports

Your checkpoint

A one-page overflow response and reporting flowchart plus a 15-question safety and regulations quiz scored at 80% or better

Week 7

Drinking Water Treatment & Wastewater Treatment

  • Re-derive and apply the ten highest-yield calculations across both treatment domains (feed rate, detention time, loading rate, solids production, efficiency, MCRT, SVI, chlorine demand, CT, dose) from memory

  • Explain the drinking water and wastewater monitoring and reporting chain: who samples, how often, where results go, and what triggers a violation or exceedance

  • Describe emergency response for treatment plants: loss of power, loss of disinfection, chemical spill, and flood, and the notification order for each

  • Review operational math for laboratory quality control, including dilution, percent solution, and standard solution preparation

  • Diagnose five short scenario questions that each describe a treatment problem and ask for the most likely cause and first corrective action

Your checkpoint

A timed 40-question mixed-domain practice test with a written error log categorizing each miss as knowledge gap, calculation error, or misread question

Week 8

Regulations, Safety, and Administration & Drinking Water Treatment & Drinking Water Distribution & Wastewater Treatment & Wastewater Collection

  • Review all five domains using your error log, reworking every missed question until you can explain the correct reasoning aloud

  • Recite the key regulatory numbers, limits, and reporting deadlines for drinking water and wastewater without notes

  • Complete two full-length timed practice exams under exam conditions and score each

  • Rehearse the safety and confined space decision points that appear as scenario questions, stating the correct action and the reason

  • Build a final one-page summary sheet of formulas, limits, and process control targets to review in the 24 hours before the exam

Your checkpoint

Two scored full-length practice exams with a final summary sheet and a written list of the five weakest areas plus the specific action you will take on each before test day

Milestones

Week 2: You can draw the complete drinking water treatment train from memory and solve feed rate, detention time, and filter loading problems correctly on the first attempt without a formula sheet

Week 4: You can calculate F/M, MCRT, SVI, and removal efficiency from raw lab data and explain what each result says about plant performance, scoring 80% or better on a self-made 20-question treatment quiz

Week 6: You can state the confined space entry sequence, the overflow notification chain, and the correct backflow device for three described hazards, all without notes

Week 7: Your timed mixed-domain practice test score is at or above 75%, and your error log shows calculation errors are fewer than knowledge gaps

Week 8: Both full-length practice exams scored at or above 80%, with no domain below 70%, and your summary sheet fits on one page