MT Water/Wastewater Operator study plan
MT Water/Wastewater Operator · Give each week a clear focus.
8 weeks · About 6 hours per week
Drinking Water Treatment & Regulations, Safety, and Administration
Map the full drinking water treatment train from source to finished water, naming the purpose of each unit process (coagulation, flocculation, sedimentation, filtration, disinfection) and the contaminant each one targets
Calculate chemical feed rates in mg/L and lb/day for alum, chlorine, and fluoride using the lb/day = mg/L x MGD x 8.34 relationship, working at least 15 problems without a formula sheet
Explain the difference between primary and secondary drinking water standards and list the regulated contaminant groups (microbial, disinfection byproducts, disinfectants, inorganic, organic, radionuclides) with one example each
Describe the surface water treatment rule concepts of CT (concentration x contact time), log inactivation credits, and turbidity limits for filtered systems
Build a one-page formula and unit-conversion reference card you will use all eight weeks
Your checkpoint
A one-page formula card plus a scored 20-problem calculation set (feed rate, detention time, filter loading rate) with every wrong answer reworked by hand
Drinking Water Treatment & Drinking Water Distribution
Compare conventional, direct filtration, slow sand, and membrane treatment trains and state which raw water conditions favor each
Work through jar testing interpretation: read a jar test result sheet and select the coagulant dose and pH that best meets a target finished turbidity
Calculate filter loading rate in gpm/ft2 and backwash rate, and identify the signs of filter breakthrough, mudball formation, and air binding
Trace finished water from the clearwell through high-service pumping and storage, and explain how storage tank turnover and water age affect disinfectant residual
Explain disinfection byproduct formation tradeoffs between chlorine, chloramine, ozone, and UV, including when each is chosen
Your checkpoint
A written treatment-train comparison table (five processes x raw water quality, residuals, byproducts, operator control points) plus a 10-question self-quiz scored at 80% or better
Drinking Water Distribution & Regulations, Safety, and Administration
Identify the components of a distribution system (mains, service lines, hydrants, valves, meters, storage, booster stations) and state the function and typical failure mode of each
Calculate head loss using the Hazen-Williams concept, convert between pressure in psi and head in feet (psi x 2.31), and solve flow-through-orifice and fire-flow problems
Explain cross-connection control: identify backflow hazards, distinguish backpressure from backsiphonage, and match the correct device (air gap, RPZ, double check, vacuum breaker) to each hazard
Describe main flushing, valve exercising, and hydrant maintenance programs and the recordkeeping each requires
Summarize distribution sampling requirements for total coliform and chlorine residual, including sample siting, frequency, and repeat sampling triggers
Your checkpoint
A distribution system diagram of your own utility or a hypothetical system, annotated with pressure zones, storage, backflow devices, and sampling locations, plus five solved hydraulic problems
Wastewater Treatment & Regulations, Safety, and Administration
Draw the wastewater treatment train from influent through preliminary, primary, secondary, and disinfection to outfall, and state the removal mechanism at each stage
Calculate BOD and TSS removal efficiency, food-to-microorganism ratio, mean cell residence time (sludge age), and solids loading rate
Explain the activated sludge process control levers (return activated sludge rate, waste rate, dissolved oxygen, mixed liquor suspended solids) and what each does to effluent quality
Interpret a set of lab results (BOD, TSS, ammonia, dissolved oxygen, pH, settleability/SVI) and write a short diagnosis of the likely process problem
State the National Pollutant Discharge Elimination System permit structure: effluent limits, monitoring frequency, reporting deadlines, and bypass/upset reporting duties
Your checkpoint
A completed process-control worksheet using one week of realistic plant data, including calculated F/M, MCRT, and SVI with a one-paragraph written diagnosis
Wastewater Treatment & Wastewater Collection
Describe collection system components (gravity mains, manholes, lift stations, force mains, laterals) and the design slope and velocity ranges that keep solids moving
Calculate pipe slope, flow velocity, and detention time in a wet well, and size a pump cycle using wet well volume and pump rate
Explain infiltration and inflow, how each is detected, and the rehabilitation methods (lining, grouting, replacement, root control) used to reduce them
Identify the hazards and procedures for confined space entry in manholes and wet wells, including atmospheric testing order, ventilation, attendant duties, and retrieval systems
Describe lift station operation and maintenance: pump alternating, alarm response, odor and corrosion control (H2S), and emergency bypass planning
Your checkpoint
A lift station operating and emergency response checklist covering alarms, wet well levels, confined space entry, and power-failure bypass, plus five solved slope/velocity problems
Wastewater Collection & Regulations, Safety, and Administration
Explain the major collection system capacity assessment tools (flow monitoring, smoke testing, dye testing, CCTV inspection, I/I modeling) and what each reveals
Describe gravity sewer cleaning methods (rodding, jetting, bucket machines) and match the method to the obstruction type
Summarize the safety program elements a utility must maintain: hazard communication, lockout/tagout, personal protective equipment, respiratory protection, fall protection, and emergency action plans
Apply chemical safety rules for chlorine, sulfur dioxide, sodium hypochlorite, and treatment polymers, including storage separation and leak response
Describe recordkeeping and reporting obligations for collection system overflows, including immediate notification and follow-up written reports
Your checkpoint
A one-page overflow response and reporting flowchart plus a 15-question safety and regulations quiz scored at 80% or better
Drinking Water Treatment & Wastewater Treatment
Re-derive and apply the ten highest-yield calculations across both treatment domains (feed rate, detention time, loading rate, solids production, efficiency, MCRT, SVI, chlorine demand, CT, dose) from memory
Explain the drinking water and wastewater monitoring and reporting chain: who samples, how often, where results go, and what triggers a violation or exceedance
Describe emergency response for treatment plants: loss of power, loss of disinfection, chemical spill, and flood, and the notification order for each
Review operational math for laboratory quality control, including dilution, percent solution, and standard solution preparation
Diagnose five short scenario questions that each describe a treatment problem and ask for the most likely cause and first corrective action
Your checkpoint
A timed 40-question mixed-domain practice test with a written error log categorizing each miss as knowledge gap, calculation error, or misread question
Regulations, Safety, and Administration & Drinking Water Treatment & Drinking Water Distribution & Wastewater Treatment & Wastewater Collection
Review all five domains using your error log, reworking every missed question until you can explain the correct reasoning aloud
Recite the key regulatory numbers, limits, and reporting deadlines for drinking water and wastewater without notes
Complete two full-length timed practice exams under exam conditions and score each
Rehearse the safety and confined space decision points that appear as scenario questions, stating the correct action and the reason
Build a final one-page summary sheet of formulas, limits, and process control targets to review in the 24 hours before the exam
Your checkpoint
Two scored full-length practice exams with a final summary sheet and a written list of the five weakest areas plus the specific action you will take on each before test day
Milestones
Week 2: You can draw the complete drinking water treatment train from memory and solve feed rate, detention time, and filter loading problems correctly on the first attempt without a formula sheet
Week 4: You can calculate F/M, MCRT, SVI, and removal efficiency from raw lab data and explain what each result says about plant performance, scoring 80% or better on a self-made 20-question treatment quiz
Week 6: You can state the confined space entry sequence, the overflow notification chain, and the correct backflow device for three described hazards, all without notes
Week 7: Your timed mixed-domain practice test score is at or above 75%, and your error log shows calculation errors are fewer than knowledge gaps
Week 8: Both full-length practice exams scored at or above 80%, with no domain below 70%, and your summary sheet fits on one page