Quick reference

Safety and Regulatory Knowledge

  • Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, PPE.

  • A hazard is any potential source of harm; risk is the combination of likelihood and severity of that harm occurring.

  • ALARP principle: risks must be reduced so far as is reasonably practicable, balancing cost against risk reduction.

  • Permit-to-work systems apply to hot work, confined space entry, lockout/tagout, and excavation near buried services.

  • Lockout/tagout sequence: notify, shut down, isolate energy, apply locks and tags, verify zero energy, then work.

  • Confined space entry requires atmospheric testing before entry and continuous monitoring for oxygen, flammables, and toxics.

  • Regulatory inspection powers typically include right of entry, sampling, photographing, interviewing, and issuing notices or prohibition orders.

  • Reportable incidents usually include fatalities, serious injuries, dangerous occurrences, and specified occupational diseases within set timeframes.

  • A prohibition notice stops an activity posing imminent serious personal injury; a improvement notice sets a deadline to remedy a contravention.

Quick reference

Inspection and Testing Procedures

  • Calibration traceability requires an unbroken chain of comparisons to a national or international standard.

  • Measurement uncertainty must be reported with test results; a pass/fail decision accounts for uncertainty at the specification limit.

  • Non-destructive testing methods include visual, dye penetrant, magnetic particle, ultrasonic, and radiographic inspection.

  • Pressure test pressure is typically 1.5 times the design pressure for hydrostatic tests, held for a defined duration.

  • Electrical insulation resistance testing uses a DC voltage and measures resistance in megohms; values are temperature-corrected.

  • Sampling plans define lot size, sample size, acceptance number, and rejection number per a standard such as an AQL table.

  • Test equipment must be within its calibration interval; out-of-calibration instruments invalidate prior results and trigger impact assessment.

  • Witness and hold points in an inspection and test plan require the inspector's presence before the activity proceeds.

Quick reference

Equipment and System Fundamentals

  • Pressure relief valves protect against overpressure; set pressure, reseat pressure, and lift are key performance parameters.

  • A centrifugal pump's flow varies with system resistance along its pump curve; a positive displacement pump delivers near-constant flow.

  • Fail-safe design means a component failure results in a safe state, such as a valve failing closed or open as specified.

  • Instrument loop components: sensor, transmitter, signal path, controller, and final control element.

  • A 4-20 mA current loop uses 4 mA as live zero, allowing broken-wire detection below 4 mA.

  • Corrosion types include uniform, galvanic, pitting, crevice, stress corrosion cracking, and erosion-corrosion.

  • Heat exchanger effectiveness compares actual heat transfer to the maximum thermodynamically possible for the flow rates.

  • Grounding and bonding protect against static ignition and electrical fault currents; resistance limits are specified per installation standard.

Quick reference

Documentation and Recordkeeping

  • A controlled document has an identified revision, approval, issue date, and distribution list; superseded copies are withdrawn.

  • Records are evidence of results achieved; documents state requirements. Records are retained, not revised.

  • The inspection and test plan links each inspection activity to the applicable standard, acceptance criteria, and record.

  • Non-conformance reports document the requirement breached, the objective evidence, disposition, and corrective action.

  • Traceability links material or product to certificates, test results, and batch or serial numbers.

  • Retention periods are set by regulation, contract, or the quality management system, whichever is longest.

  • Corrections to records must be legible, signed or initialled, dated, and preserve the original entry.

  • An audit trail records who changed a document or record, when, and what changed.

Quick reference

Professional Conduct and Ethics

  • Independence: an inspector must not inspect work they designed, performed, or supervised.

  • Confidentiality obligations cover client data, proprietary processes, and inspection findings not yet public.

  • Conflicts of interest must be declared and managed; undisclosed financial interest in the inspected party is a breach.

  • Falsifying, backdating, or signing for tests not performed is fraud and grounds for decertification.

  • Competence limits: decline or refer work outside your qualification, training, or authorised scope.

  • Bribery and facilitation payments are prohibited; gifts and hospitality must follow a declared policy threshold.

  • Whistleblowing duties: report safety-critical wrongdoing through defined channels even when it conflicts with employer interests.

  • Objectivity requires reporting findings as evidence shows, without pressure from the client, employer, or commercial targets.