SKM Automotive Aftersales L2 key terms
SKM Automotive Aftersales L2 · Get comfortable with the vocabulary.
- Job Card
- Related: Work Order Authorisation, Service History Record
The written or digital record opened for each vehicle visit that lists the customer's complaint, approved work, parts needed, technician assigned, and time spent. It authorises work and supports later invoicing and warranty claims.
- Work Order Authorisation
- Related: Job Card, Estimate vs Final Invoice
The customer's explicit approval, usually signed or digitally confirmed, for the work and estimated cost on a job card. Work done without it can be disputed and may not be chargeable.
- Estimate vs Final Invoice
- Related: Work Order Authorisation, Supplementary Authorisation
An estimate is the predicted cost given before work starts; the final invoice is the actual amount charged. Any significant increase over the estimate should be approved by the customer before extra work proceeds.
- Supplementary Authorisation
- Related: Estimate vs Final Invoice, Job Card
Additional customer approval obtained mid-job when inspection reveals extra faults or costs beyond the original estimate. It records what was added, the new price, and the customer's consent before technicians continue.
- Service History Record
- Related: Job Card, Warranty Claim
The chronological log of maintenance and repairs for a vehicle, kept by the dealer and often stamped in the service booklet. It supports resale value, scheduled maintenance planning, and warranty eligibility decisions.
- Vehicle Reception Inspection
- Related: Vehicle Handover, Customer Complaint Capture
The check performed with the customer when the vehicle arrives, recording mileage, fuel level, visible damage, and accessories left inside. Signed findings protect both parties against later damage disputes.
- Customer Complaint Capture
- Related: Vehicle Reception Inspection, Repeat Repair
The process of recording the customer's description of the fault in their own words, plus conditions such as when it occurs. Accurate capture helps technicians reproduce the problem and reduces repeat visits.
- Vehicle Handover
- Related: Vehicle Reception Inspection, Final Inspection Sign-off
The final step where the completed vehicle, keys, and paperwork are returned to the customer with an explanation of work done and charges. It closes the job and is a key point for confirming satisfaction.
- Appointment Scheduling
- Related: Workshop Loading, Labour Time Guide
Allocating workshop time slots to jobs based on required labour hours, technician availability, parts lead time, and bay capacity. Good scheduling balances workshop load and keeps promised collection times realistic.
- Workshop Loading
- Related: Appointment Scheduling, Bay Utilisation
The measure of how much booked work is assigned against available technician hours in a given period. Overloading causes delays and rushed work; underloading wastes capacity and revenue.
- Bay Utilisation
- Related: Workshop Loading, Throughput Time
The percentage of available workshop bays or lifts actually in use during working hours. Tracking it reveals bottlenecks such as waiting for parts or slow handovers between jobs.
- Labour Time Guide
- Related: Flat Rate, Appointment Scheduling
The manufacturer's reference times for standard repair and maintenance operations, used to quote and invoice labour. Technicians compare actual time against the guide to spot inefficiency or unexpected faults.
- Flat Rate
- Related: Labour Time Guide, Estimate vs Final Invoice
A fixed labour charge for a defined operation regardless of how long it actually takes. It makes quoting predictable for customers and simplifies invoicing, but requires accurate standard times.
- Pre-Delivery Inspection (PDI)
- Related: Final Inspection Sign-off, Quality Gate
The checklist completed on a new or used vehicle before handover to confirm it is undamaged, correctly equipped, and functioning. Faults found at PDI are corrected before the customer sees the vehicle.
- Final Inspection Sign-off
- Related: Pre-Delivery Inspection (PDI), Road Test Verification
The technician's or supervisor's confirmation that all work on the job card is complete, tested, and meets quality standards before the vehicle is released. It is the last control before handover.
- Road Test Verification
- Related: Repeat Repair, Final Inspection Sign-off
A controlled drive after repair to confirm the reported fault is resolved and no new issues appear. Results, including mileage driven, should be recorded on the job card.
- Repeat Repair
- Related: Customer Complaint Capture, Road Test Verification
A vehicle returning for the same fault shortly after a previous repair. Repeat repairs signal diagnosis or workmanship problems and are tracked as a quality indicator in aftersales performance.
- Quality Gate
- Related: Final Inspection Sign-off, Pre-Delivery Inspection (PDI)
A defined checkpoint in the service process where work must meet set criteria before moving to the next stage. Examples include parts verification before fitting and inspection before handover.
- Parts Availability Check
- Related: Parts Reservation, Backorder
Confirming whether required parts are in stock, on order, or need sourcing before committing to a repair date. It prevents vehicles sitting idle in bays waiting for components.
- Parts Reservation
- Related: Parts Availability Check, Stock Reconciliation
Allocating specific stock items to a particular job so they cannot be sold or used elsewhere. Reservations link parts to the job card and support accurate costing and stock control.
- Backorder
- Related: Parts Availability Check, Lead Time
A part that is not in stock but has been ordered from the supplier against confirmed demand. Backorders must be tracked and communicated to customers because they affect promised completion dates.
- Lead Time
- Related: Backorder, Appointment Scheduling
The period between placing an order for a part and receiving it ready for use. It drives appointment promises and should be checked before quoting a completion date.
- Stock Reconciliation
- Related: Parts Reservation, Parts Return Credit
Comparing physical parts counts with system records to find and correct discrepancies. Regular reconciliation catches mis-issued parts, unrecorded returns, and shrinkage before they distort ordering decisions.
- Parts Return Credit
- Related: Stock Reconciliation, Genuine vs Aftermarket Parts
The process of returning unused or incorrectly supplied parts to the supplier or stock and recovering the cost. It requires correct documentation and adherence to supplier return conditions and deadlines.
- Genuine vs Aftermarket Parts
- Related: Warranty Claim, Parts Return Credit
Genuine parts are supplied or approved by the vehicle manufacturer; aftermarket parts come from third parties. The difference affects warranty coverage, fit, and customer disclosure obligations.
- Warranty Claim
- Related: Warranty Eligibility, Service History Record
A request submitted to the manufacturer for reimbursement of a repair covered under warranty. It requires proof of fault, correct labour operation codes, and evidence the vehicle was maintained as required.
- Warranty Eligibility
- Related: Warranty Claim, Goodwill Repair
The determination of whether a fault is covered by the manufacturer's warranty based on age, mileage, maintenance history, and cause. It must be checked before promising a free repair.
- Goodwill Repair
- Related: Warranty Eligibility, Warranty Claim
A repair performed free or at reduced cost outside strict warranty terms as a customer retention gesture. It usually needs management approval and should be documented with the reason.
- Pre-Job Safety Briefing
- Related: Personal Protective Equipment (PPE), Hazard Identification
A short talk before starting work that identifies hazards, required protective equipment, and emergency procedures for the tasks planned. It ensures everyone knows the risks before entering the work area.
- Personal Protective Equipment (PPE)
- Related: Pre-Job Safety Briefing, Hazard Identification
Items such as gloves, safety glasses, hearing protection, and safety footwear worn to reduce exposure to workplace hazards. PPE is the last line of defence after eliminating or controlling the risk.
- Hazard Identification
- Related: Pre-Job Safety Briefing, Risk Assessment
The systematic spotting of conditions or actions that could cause harm, such as oil spills, faulty lifts, or unguarded rotating equipment. Identified hazards are reported and controlled before work continues.
- Risk Assessment
- Related: Hazard Identification, Personal Protective Equipment (PPE)
Evaluating the likelihood and severity of harm from an identified hazard and deciding what controls are needed. It is documented and reviewed when tasks, equipment, or conditions change.
- Waste Segregation
- Related: Hazard Identification, Safety Data Sheet (SDS)
Separating waste streams such as used oil, coolant, batteries, and general rubbish into correct containers. It prevents contamination, supports recycling, and keeps the workshop compliant with environmental rules.
- Safety Data Sheet (SDS)
- Related: Waste Segregation, Risk Assessment
A document providing hazard, handling, storage, and first-aid information for a chemical product. It must be accessible to staff who use the substance and is referenced in risk assessments.
- Throughput Time
- Related: Bay Utilisation, Appointment Scheduling
The total elapsed time from vehicle arrival to handover, including waiting, diagnosis, repair, and cleaning. Reducing it improves customer satisfaction and frees workshop capacity.
- Upsell and Cross-Sell
- Related: Customer Complaint Capture, Estimate vs Final Invoice
Recommending additional needed services or accessories based on inspection findings or vehicle needs. Recommendations must be honest, explained clearly, and never pressure the customer into unnecessary work.
- Customer Satisfaction (CSI)
- Related: Vehicle Handover, Complaint Handling
A measure of how satisfied customers are with the service experience, often collected through surveys after handover. Scores are used to identify service weaknesses and improve processes.
- Complaint Handling
- Related: Customer Satisfaction (CSI), Repeat Repair
The structured response to a customer's dissatisfaction: listen fully, acknowledge the issue, investigate facts, propose a fair solution, and confirm resolution. Recording outcomes helps prevent recurrence.
- Service Reminder Follow-up
- Related: Service History Record, Warranty Eligibility
Contacting customers when scheduled maintenance or safety recalls are due, using service history and vehicle records. It builds loyalty and keeps vehicles maintained within warranty requirements.