STPM Management Mathematics 950 study materials
STPM Management Mathematics 950 study resources

STPM Management Mathematics 950 flashcards

STPM Management Mathematics 950 · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Reduced cost
For a non-basic variable, c̄ⱼ = cⱼ − c_BᵀB⁻¹Aⱼ. In a maximisation, a positive reduced cost means bringing that variable into the basis improves the objective.
Shadow price
The optimal dual value of a resource constraint: the increase in the objective per one-unit increase in that resource's availability, valid while the current basis remains optimal.
Unbounded solution test
In the simplex ratio test, if every entry in the entering variable's column is zero or negative, no leaving variable exists and the objective can increase without limit.
Total float
Latest start minus earliest start, equivalently latest finish minus earliest finish. It is the delay an activity can absorb without delaying the whole project.
Free float
Earliest start of the successor minus earliest finish of the activity. It is the delay possible without affecting any successor's earliest start date.
PERT expected time
tₑ = (a + 4m + b)/6, a weighted average of optimistic, most likely and pessimistic estimates, with variance ((b − a)/6)² used to find project completion probabilities.
Cost slope
(Crash cost − normal cost) divided by (normal time − crash time). It measures the extra cost per unit of time saved when shortening an activity.
Dummy activity
A zero-duration arrow drawn to express a precedence relationship that cannot be shown by the real activities alone; it consumes no time or resources.
Expected value of perfect information
The expected payoff with perfect foresight minus the best expected monetary value without it. It caps the amount worth spending on additional information.
Minimax regret
A decision rule under uncertainty: build an opportunity-loss table, find each alternative's maximum regret, and choose the alternative whose maximum regret is smallest.
Indifference probability
The probability of one state of nature at which two alternatives have equal expected monetary value, marking the switch point in sensitivity analysis.
Economic order quantity
EOQ = √(2DS/H), the order size minimising the sum of annual ordering cost and annual holding cost, where D is demand, S ordering cost and H holding cost.
Reorder level
The inventory position at which a new order is placed: demand per period multiplied by lead time, plus any safety stock held against uncertainty.
Safety stock
Extra inventory held to cover demand or lead-time variability; it raises holding cost but reduces the probability of a stockout during the replenishment cycle.
Production run model EPQ
EPQ = √(2DS/(H(1 − d/p))), used when inventory builds up gradually at rate p while being consumed at rate d, rather than arriving all at once.
Little's law
L = λW and Lq = λWq: average number in the system equals arrival rate times average time in the system, for any stable queueing system.
M/M/1 queue length
With utilisation ρ = λ/μ < 1, average number in the system is L = ρ/(1 − ρ) and average number waiting is Lq = ρ²/(1 − ρ).
M/M/c stability condition
A multi-server queue is stable only if λ < cμ, so utilisation ρ = λ/(cμ) is below one; otherwise the waiting line grows without bound.
Kendall notation
A/B/c/K/N/D notation recording arrival distribution, service distribution, number of servers, system capacity, calling population and queue discipline.
Saddle point
An entry that is simultaneously the minimum of its row and the maximum of its column. Its existence means both players have an optimal pure strategy.
Value of a game
The expected payoff to the row player when both players use their optimal strategies. A zero value means the game is fair.
Dominance in games
Removing a strategy that can never do better than another: for the maximising player, delete a row whose entries are all less than or equal to another row's.
Exponential smoothing
F_{t+1} = αYₜ + (1 − α)Fₜ, a weighted average where the smoothing constant α between 0 and 1 controls responsiveness to recent observations.
Seasonal index
A factor expressing the typical percentage deviation of a season from the trend; for quarterly multiplicative data the four indices average 100 and sum to 400.
Tracking signal
The running sum of forecast errors divided by mean absolute deviation. Large absolute values indicate persistent bias and call for model revision.
Laspeyres index
A weighted aggregate index using base-period quantities: (Σpₙq₀ / Σp₀q₀) × 100. Because weights are fixed, it tends to overstate price increases.
Paasche index
A weighted aggregate index using current-period quantities: (Σpₙqₙ / Σp₀qₙ) × 100. It tends to understate price rises relative to Laspeyres.
Fisher's ideal index
The geometric mean of the Laspeyres and Paasche indices. It satisfies both the time-reversal and factor-reversal tests, making it theoretically preferred.
Deflating a value
Converting a nominal money amount to real terms by dividing by a price index and multiplying by 100, so values from different years become comparable.
Effective annual rate
(1 + r/m)^m − 1, the true yearly growth factor when nominal rate r is compounded m times per year; it allows fair comparison of compounding conventions.
Net present value
The sum of discounted future cash flows minus the initial outlay. A positive NPV means the project returns more than the required rate.
Sinking fund payment
R = FV · i/[(1 + i)ⁿ − 1], the equal periodic deposit that accumulates to a specified future sum when interest is compounded each period.